READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 06-22-2010 Regular — reading text

Part 13 of 71. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-25166-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

June 22, 2010 for funding through the State sufficient justify improvements to eligible Revolving Fund ( SRF) loan program. 2. 2 The proposed schedule for the project estimates approximately 90 days for completion. 3. FINANCIAL INFORMATION: 3. 1 To complete all of the tasks in Phase I of the Pump Station No. 1 Force Main project as defined in the Scope of Services, HMM has proposed a not to exceed fee of $ 100, 000. This fee includes direct expenses in a not to exceed amount of $5, 000. 3. 2 Sufficient funding is available in the FY 2009 -10 budget in CIP 5031 - Pump Station No. 1 Upgrade for Engineering Design of a Parallel Force Main. 4. RECOMMENDATION: 4. 1 Staff requests City Council authorization for the City Manager to execute a Task Order with Hatch Mott MacDonald of Pensacola, Florida to complete a preliminary evaluation and engineering report of Pump Station No. 1 and force main for a not to exceed amount of $100, 000. 5. ATTACHMENTS: 5. 1 Task Order for Fort Walton Beach Pump Station No. 1 & Force Main Evaluation and Engineering Report Force 5. 2 Attachment A - Scope of Services for Fort Walton Beach Pump Station No. 1 & Main Evaluation and Engineering Report 5. 3 Attachment B - Fee Estimate for Evaluation and Engineering Report for Fort Walton Beach Force Main & Pump Station No. 1 6. SIGNATURE BLOCK: 6. 1 Submitted By:- y"-- "" 2 Michael D. Beedie, P. E. Engineering & Utility Services Director 6. 2 Reviewed and Concur: > Lk I i 'S k3 Bran y Wunker, Finance Director Agenda: 63 Reviewed for A g s: bert T. Mearns ity Manager 25 Council Meeting, June 22, 2010 TASK ORDER for CONrrRACT FOR GENERAL CONSULTING SERVICES Fort Walton Beach PS 1 and Force Main Evaluation and Engineering Report This task order is executed by the parties on the dates signed, shall become effective as of the date signed by the last party, and incorporates by reference the entire Contract for ( seneral Consulting Services between the City of Fort Walton Beach, a Florida municipality, with its principal place of business at 107 Miracle Strip Pkwy, Fort Walton Beach, Florida, ( "City ") and the Consultant: Hatch :Mott MacDonald Florida, LLC 12th 1115 N. Ave Pensacola, FL 32504 Telephone Number 850. 484. 6011 Fax Number 850. 484. 8199 Section 1. Scope of Work The Consultant shall perform the services ( the " Work ") described in: Attachment A —Scope of Services Fort Walton Beach PS 1 and Force Main Evaluation and Engineering Report Dated June 14, 2010 And as further described in: Attachment B —Fee Estimate Evaluation and Engineering Report for Fort Walton Beach Force Main & PS -1 Dated June 14, 2010 Section 2. Project Schedule The Consultant shall follow the following project schedule: The work described herein shall be completed within 90 days of authorization from the City. Additional work assigned by the City may modify this schedule. Section 3. Price & Payment of Project The Consultant shall be compensated as follows: Fixed Price. The Consultant' s compensation shall be a fixed price ( lump sum) of $ 97, 430. 00 ( Ninety Seven Thousand Four Hundred Thirty Dollars). 1 26 Council Meeting, June 22, 2010 Section 4. Insurance/ Payment/Performance Bond The following insurance /payment /performance bond requirements shall apply for the time of this Task order: Not Applicable Section 5. Time of Completion Work shall commence upon issuance of a notice to proceed by the Purchasing Director. CITY OF FORT WALTON BEACH, FLORIDA 2010 By: , Robert Mearns, City Manager Dated Attest: Helen Spencer, City Clerk CONSULTANT BY: , 2010 Dated Printed Name: Its: State of County of Sworn and affirmed before me, the undersigned authority, on , 2010, by , in his/her representative capacity as the of Consultant, and who is personally known to me or who has produced identification. Notary Public Identification: 2 27 Council Meeting, June 22, 2010 Attachment A —Scope of Services Fort Walton Beach PS 1 and Force Main Evaluation and Engineering Report June 14, 2010 Ft. Walton Beach desires to implement improvements related to the City' s existing PS 1 lift station and the discharge force main from PS 1 to the new County force main south of the Ft. Walton Beach Treatment Plant. It is anticipated that this scope of services will initially include the evaluation of PS 1 and the 7 mile long 30 -inch prestressed concrete cylinder pipe ( PCCP) force main. Following the issuance of a design report justifying selected alternatives, design of a replacement force main and associated lift station improvements will likely be required. Both the force main and pump station are believed to have experienced significant deterioration due to acid degradation of concrete structures. Neither the force main or pump station have a protective lining and existing facilities outside the pump station have been replaced due to acid attack and resulting damage to the concrete structures. Additionally, the force main does not have working air release valves. This condition is believed to dramatically increase the probability of significant localized corrosion of the pipeline at numerous locations along the 7 -mile length. Hatch Mott MacDonald ( HMM) proposes to perform the tasks below for this project for the Evaluation and Engineering Report as described herein. Subsequent Tasks shall be authorized after preliminary data is evaluated and the City has selected its preferred alternatives and appropriate fees may be determined. Evaluation and Engineering Report Data Collection: F1MM will collect and review available data from City staff and County GIS. It is anticipated that this will consist of utility atlases, as- builts /laying schedule for the existing force main, lift station as- builts, lift station flow data and pump run -times and lift station maintenance records. HMM will also conduct a site visit to the lift station to gather additional information on existing conditions including mechanical and structural integrity. HMM will attempt to visually observe the interior of the wetwell by looking through the access hatch with a flashlight. HMM staff will not enter the confined space at this time. It is hoped that some level of understanding regarding the condition of the wetwell may be ascertained. This information will be utilized to define and facilitate the evaluation and preliminary design of the proposed facilities. Force Main Integrity Evaluation: Prior to preparing route or force main alternatives, it will be necessary to determine to what extent the existing force main may be utilized. It is anticipated that upon review of the available as- builts /laying schedule information, specific areas of concern ( with high potential for corrosion) will be identified along the existing force main. At this point, depending on the extent and location of the areas of concern, integrity testing or other investigations /corrective actions may be appropriate. HMM, in coordination with City staff, will identify the appropriate investigations /testing and/ or actions to be undertaken and if City staff concur, will perform or assist with this PA272075\ Document s \Scope & Fee \Scope Final. doc June 14, 2010 Page 1 of 2 28 Council Meeting, June 22, 2010 additional effort. It is anticipated that this will be under separate authorization or via a procurement bid if deemed necessary to support completion of the preliminary design. Hydraulic Analysis/ Evaluation: HMM will review the available data and recommend sizing of the major project components including the diameter of the proposed force main and any changes to PS -1 pumping capacity. Additionally, proposed improvements to PS 1 will be identified. It is anticipated that these improvements may include screening /grit collection, odor control and wetwell coatings. The sizing of project components will, if possible and in part, be based on reusing a portion of the existing 30 -inch PCCP force main. HMM will coordinate with the City to define pipe material, class, valve types, air release valve criteria, specifics of the horizontal directional drill and PS -1 mechanical preferences. Route Evaluation: HMM will review the conceptually defined force main route to determine the feasibility of the proposed route and identify any improvements to the route to minimize impacts on area residents and businesses, minimize traffic impacts, avoid conflicts with major known utilities and provide the most cost effective, feasible route. It is anticipated that the route for the horizontal directional drill of Cinco Bayou will follow existing City easements utilized for an existing water main and that the route within the golf course property will be within an existing easement. It is assumed that the remainder of the route will be within public right of way. The final potential alternatives will be updated in the hydraulic model and final hydraulic conditions will be determined. PS -1 Evaluation: HMM will evaluate the feasibility of modifying PS -1 to accommodate new pumping requirements. The condition of the structure will be considered for all facility modifications and new facilities will be compared to rehabilitated facilities to determine the most cost

Download this text file with its original spacing ↓