READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-11-2010 Regular — reading text
Part 8 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25161-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
SAMPLE APPLICATION FOR TRANSPORTATION 2/ 2006
ENHANCEMENT PROJECTS Page 1 Of 3
Project Title: Fort Walton Beach Bike Route l
Project Sponsor ( municipal, county, state, or federal agency, or tribal council):
City of Fort Walton Beach
Contact Michael Beedie, P. E. Title City Engineer
PO Box 4009 Fort Walton Beach, FL 32549
Address
833 - 9612 850) 833 - 9926
Phone ( 850) FAX (
Priority ( relative to other applications submitted by the Project Sponsor). 1
Name of Applicant ( If other than Project Sponsor):
1.Qualifying Enhancement Activities:
Check the enhancement activity that the proposed project will address. ( NOTE: Checking all activities
possible does not ensure or increase eligibility. Each activity checked must meet all criteria listed for
that activity in Appendix A of FDOT Procedure # 525 -030 -300, Transportation Enhancement Projects).
X Provision of facilities for pedestrians and bicycles
The provision of safety and educational activities for pedestrian and bicyclists
Acquisition of scenic easements and scenic or historic sites
Scenic or historic highway programs, ( including the provision of tourist and welcome center
facilities)
Landscaping and other scenic beautification
Historic preservation
Rehabilitation of historic transportation buildings, structures or facilities ( including historic railroad
facilities and canals)
Preservation of abandoned railway corridors ( including the conversion and use thereof for
pedestrian or bicycle trails)
Control and removal of outdoor advertising
Archaeological planning and research
Environmental mitigation to address water pollution due to highway runoff or reduce vehicle -
caused wildlife mortality while maintaining habitat connectivity
Establishment of transportation museums
25-
Appendix. B
02/ 2006
Page 2 of 3
2. Project Description:
Use additional sheets as necessary to respond to the following:
a) What type of work is being proposed? ( Check all that apply)
Planning Activities
Project Development and Environmental Studies
Engineering and Final Plans Preparation Work
Right of Way Acquisition
X
Construction
Construction Engineering and Inspection Activities
b) Describe how the proposed project is related to the intermodal transportation system by either
function, proximity or impact. ( One or more may apply).
c) Where is the project located ( and what is the project length and termini, if appropriate)? Include
location map.
d) Summarize any special characteristics of project. Provide typical section drawings for
appropriate projects.
e) Describe the project's existing right of way ownerships. This description shall identify when the
right of way was acquired and how ownership is documented ( i. e. plats, deeds, prescriptions,
certified surveys).
f) Describe any proposed right of way acquisition, including expected matching fund source,
limitations on fund use or availability, and who will acquire and retain ownership of proposed right
of way.
g) Describe any related project work phases that are already complete or currently underway.
h) Other specific project information that should be considered.
3. Project Implementation Information:
Attach documentation as exhibits to this application.
a) Describe the proposed method of performing ( i. e. contract or in- house) and administering ( i. e.
local or state) each work phase of the project. If it is proposed that the project be administered
by a governmental entity other than the Department of Transportation, the agency must be
certified to administer Federal Aid projects in accordance with the department' s Local Agency
Program Manual (topic no. 525 -010 -300).
b) Describe any public (and private, if applicable) support of the proposed project. ( Examples
include: written endorsement, formal declaration, resolution, financial donations or other
appropriate means).
c) Describe the proposed ownership and maintenance responsibilities for the project when it is
completed.
d) Describe source of matching funds and any restrictions on availability.
e) Other specific implementation information that should be considered.
26-
Appendix B
2/ 2006
Page 3 of 3
4. Project Cost:
What is the total estimated cost of the work requested to be funded as an enhancement project through
this application?
Planning Activities.
Project Development and Environmental Studies.
1, 650
Engineering and Final Plans Preparation Work..
Right of Way Acquisition.
16, 510
Construction.
Construction Engineering and Inspection Activities.
Other. ( Describe)
TOTAL: 18, 160
How will the project be funded?
FDOT Enhancement Funds $ L8_, 160+ Local $ Total $ 18, 160
FDOT Enhancement Funds 100 % + Local % = 100%
CERTIFICATION OF PROJECT SPONSOR
I hereby certify that the proposed project herein described is supported by ,
municipal, county, state or federal agency, or tribal council)
and that said entity will: ( 1) provide any required funding match; ( 2) enter into a maintenance agreement with
the Florida Department of Transportation; ( 3) comply with the Federal Uniform Relocation Assistance and
Acquisition Policies Act for any Right of Way actions required for the project, and ( 4) support other actions
necessary to fully implement the proposed project. I further certify that the estimated costs included herein are
reasonable and understand that significant increases in these costs could cause the project to- be removed from
the Florida Department of Transportation work program.
no
This project will be administered using the department's Local Agency Program (check one) yes x
Signature
FOR FDOT USE ONLY
NO Michael Beedie, P. E.
YES
Application Complete
Name ( please type or print)
Project Eligible
City Engineer
Implementation Feasible Title
Include in Work Program
Date
27_
2. ( b). Describe how the proposed impact is related to the intennodal transportation wry,.
system by either function, proximity, or impact.
This is a bicycle /pedestrian project.
2. ( c). Where is the project located and what is the project length?
The project is located in Fort Walton Beach and runs from Yacht Club Drive NE at the
Cinco Bayou town limit to Ferry Road NE south, down Smith Drive NE east, down
Gardner Street NE east then north, down Bay Drive south to Brooks Street SE and then
west on Brooks Street SE to Magnolia Avenue SE ( See attached map). The length of the
proposed bicycle route is approximately 3. 73 miles.
2. ( d). Summarize any special characteristics of the project.
The City of Fort Walton Beach currently has no designated bicycle lanes in the City. This
bike route is a well- known, well traveled route by local bicyclists and the Emerald Coast
Cyclists Club ( ECC). To designate this route as a bicycle route, the route requires
signage, striping, and bike /diamond symbols to officially recognize the importance of
bicycle transportation in the City.
2. ( e). Describe the project' s existing right -of w
- ay ownerships. This description shall
identify when the right -of w
- ay was acquired and how ownership is documented.
The project area is located within the right -of w
- ay on local and state roads. No additional
right -of w
- ay is required for this project.
2. ( f).Describe any proposed right -of w
- ay acquisition, including expected matching fund
source, limitations on fund use or availability, and who will acquire and retain ownership
of proposed right -of w
- ay.
No right -of w
- ay acquisition is required for this project.
2. ( g). Describe any related project work phases that are already complete or currently
underway.
The City has completed the Eco Way, a multi -modal transportation plan for the City of
Fort Walton Beach. This specific project is identified in the Eco Way along with the
estimated cost information. The Eco Way was endorsed by the local Emerald Coast
Cyclists Club ( ECC) and the Florida Department of Community Affairs ( DCA).
2. ( h). Other specific project information that should be considered.
3. ( a). Describe the proposed method of performing and administering each work phase
of the project.
28-
The City of Fort Walton Beach will administer all phases of the project through the Local
Agency Program of the FDOT. The City will complete the sign design and installation in-
house. The City will issue an RFP and hire a qualified contractor to complete the bicycle
lane striping and bicycle lane markings.
3. ( b). Describe any public