READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2020-19--Final Budget for FY 20-21 — reading text
Part 4 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-39836-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Rutgers Univ Noise Tech Asst
206 Florida Place Parking Lot Improvements 13, 600. 00 109- 2000- 552- 3400 Sept 2021
86219 12/ 02/ 15 Jenkins Engineering, Inc
Video of FW Landing Renovation Project 3, 160. 00 109- 2000- 552- 4800 Sept 2021
97885 10/ 07/ 19 RGC Media, Inc.
Playground Equipment- 110, 208. 83 109- 2000- 552- 6310 Oct 2020
98115 10/ 25/ 19 Gametime Landing
Wayfindings Design Project 46, 240. 00 109- 2000- 552- 6310 Sept 2021
100521 08/ 13/ 20 CPH, Inc.
141 Miracle Strip Pkwy SE 12, 275. 00 109- 5018- 541- 6351 Sept 2021
86877 02/ 09/ 16 Jenkins Engineering. Inc
FWB Landing- Phase I 68, 893. 50 109- 5352- 572- 6310 Sept 2021
94733 09/ 04/ 18 AVCON, Inc
66, 500. 00 109- 5352- 572- 6310 Sept 2021
94734 09/ 04/ 18 AVCON, Inc FWB Landing- Phase II
Community Redevelopment Agency Fund Total 380, 476. 10
6, 313. 00 401- 1300- 536- 3100 Sept 2021
96843 05/ 29/ 19 Mott MacDonald Florida Brooks Bridge Utility Evaluation
Freedom Beacon Water& Sewer Utility Evaluation 3, 099. 23 401- 1300- 536- 3100 Oct 2020
99671 05/ 19/ 20 Mott MacDonald Florida
Lead and Copper Testing 750. 00 401- 1310- 533- 3100 Nov 2020
99068 02/ 17/ 20 Water Spigot, Inc.
2, 353. 17 401- 1310- 533- 4680 Oct 2020
100499 09/ 01/ 20 USA$ luebook Items for Wells
Bolts for Well 2 167. 08 401- 1310- 533- 4680 Oct 2020
100514 09/ 02/ 20 Fastenal Company
Items for Wells 568. 75 401- 1310- 533- 5200 Oct 2020
100499 09/ 01/ 20 USABluebook
91. 25 401- 1310- 533- 5210 Nov 2020
99062 02/ 17/ 20 Galls Uniforms
Dell Rugged Laptops- 5 year plan 845. 12 401- 1310- 533- 5231 Dec 2020
100607 08/ 17/ 20 V-Tech 10
598.00 401- 1310- 533- 5233 Oct 2020
100499 09/ 01/ 20 USABluebook Items for Wells
3, 000. 00 401- 1340- 533- 3400 Oct 2020
99364 03/ 25/ 20 Construction Materials of NW FL Sweeper Debris and Asphalt Removal
Sweeper Debris and Asphalt Removal 2,000.00 40]- 1350- 535- 3400 Oct 2020
99364 03/ 25/ 20 Construction Materials of NW FL
89.90 401- 1350- 535- 4630 Oct 2020
100567 09/ 02/ 20 Sansom Equipment Company Headset Parts
Parts for Electrical Upgrad at Lift Station 12 475. 57 401- 1350- 535- 4680 Oct 2020
100307 08/ 19/ 20 Sequel Electric
7, 200.00 401- 1350- 535- 4680 Oct 2020
100596 09/ 03/ 20 Gilbert Pump& Mechanical Replace Main Sewer Pump
Sanitizer Dispensers and Wipes 349. 50 401- 1350- 535- 5200 Nov 2020
99355 03/ 24/ 20 Pro Chem
845. 12 401- 1500- 536- 5231 Dec 2020
100607 08/ 17/ 20 V-Tech 10 Dell Rugged Laptops- 5 year plan
Grout Crewilla Drive and Grout Eglin Pkwv SE 34, 818.75 401- 5032- 535- 6361 Oct 2020
98533 12/ 13/ 19 GCU, LLC Line&
Utilities Fund Total 63, 564.44
7, 900. 00 405- 1380- 538- 3400 Oct 2020
99364 03/ 25/ 20 Construction Materials of NW FL Sweeper Debris and Asphalt Removal
2, 141. 02 405- 1380- 538- 5200 Nov 2020
100577 09/ 02/ 20 GEVEKO Markings Storm Drain Stencils
79, 481. 00 405- 1380- 538- 6404 Jan 2021
98424 12/ 05/ 19 Lou Bachrodt Freightliner RP# 2491/ Flatbed Dumptruck
4, 628. 00 405- 1591- 538- 6358 Oct 2020
91114 06/ 17/ 17 AVCON, Inc Design of drainage improvements on Anchors Street
31, 569. 72 405- 1591- 538- 6358 Oct 2020
98093 10/ 22/ 19 RBM Contracting Anchors Street Stormwater Project
Stormwater Fund Total 125, 719. 74
TOTAL ENCUMBRANCE4 51. 280, 496. 46
