READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 6, 2014 — AJAX Contract Documents with Exhibits 4-29-2014 — reading text
Part 1 of 13. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 128-AJAX Contract Documents with Exhibits 4-29-2014.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Init.
AIA Document A133" ~ 2009
Standard Form of Agreement Between Owner and Construction Manager as
Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed
Maximum Price
AGREEMENT made as of the 5" day of May in the year 2014
(in words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status and address)
Okaloosa County: Board of County Commisioners
302.N. Wilson. St. Suite 302 --
Crestview, Florida 32536
andthe Construction Manager:
(Name, legal status and address)
Ajax Building Corporation
1080 Conimerée Blvd,
Midway, Florida 32343
for the followiiiz Project:
(Namé arid address or location)
Qkaloosa Coiinty Courthouse Addition and Renovation
101 Jaivies Lee Blvd.,
Crestview, Florida 32536
The Architect:
(Name, legal status and address)
Sait Marshall Architects
325 S, Palafox, Street
Pensacola, Florida 32502
Office (850)433-7842 / Fax (850)433-0510 / Cell (850)982-2231
The Owner’s Designated Representative:
(Name, address and other information)
Donald Turner
Director of Facilities Maintenance
5489 Old Bethel Road
Crestview, Florida 32536
Office (850)689-5790 / Fax (850)689-5630
The Construction Manager’s Designated Representative:
(Name, address and other information)
Allan Wooden
ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to the
standard form text is available from
the author and should be reviewed. A
vertical line in the left margin of this
document indicates where the author
has added necessary information
and where the author has added to or
deleted from the original AIA text.
This document has important legal
consequences. Consultation with an
attorney is encouraged with respect
toits completion or modification.
AIA Document A201 ™-2007,
General Conditions of the Contract
for Construction, is adopted in this
document by reference. Do not use
with other general conditions unless
this document is modified.
AIA Document Ai 33™ = 2009 (formerly A121 ™CMic - 2003}. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved.
WARNING: This AIA’ Documeni is protected by US. Copyright Law and International Treaties. Unauthorized reproduction or distribution of thie AIA”
Document, of any portion of it, may result in severe civil and criminal penalties, and will he prosecuted to the maximum extent possible under the law.
This document was produced by AIA software at 11:38:42 on 04/22/2014 under Order No.8569967243_1 which expires on 09/16/2014, and is not for resaie.
User Notes:
(1784294242)
it.
Operations Manager
1080 Commerce Blvd.
Midway, Florida 32343 Office (850)224-9571 / Fax (850)224-2496 / Mobile (850)251-3534
The Architect’s Designated Representative:
(Name, address and other information)
David Alsop
Sar Marshall Architects
325 S. Palafox Street
Pensacola, Florida 32502
Office ( ) /Fax( ) /Mobile( )
The Owner arid Consttuction Manager agree as follows.
AIA Document A133™ — 2009 (formerly A121™CMc ~ 2003). Copyright © 1991, 2003 and 2009 by The American institute of Architects. All rights reserved.
WARNING: This AIA” Gocument is protected by U.S. Copyright Law and Internationa! Treaties. Unauthorized reproduction or distribution of this AIA”
Document, or any portion of it, may result in severe ci
This document was produced by AIA software at 11:38:42 on 04/22/2014 under Order No.8569967243_1 which expires on 09/16/2014, and is not for resale,
User Notes: (1784294242)
Land criminal penalties, and will be prosecuted te the maximum exient possible under the law.
2
*
Init.
B
ag
g
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 CONSTRUCTION MANAGER’S RESPONSIBILITIES
3 OWNER’S RESPONSIBILITIES
4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES
5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES
6 COST OF THE WORK FOR CONSTRUCTION PHASE
7 PAYMENTS FOR CONSTRUCTION PHASE SERVICES
8 INSURANCE AND BONDS
9
40 TERMINATION OR SUSPENSION
11, MISCELLANEOUS PROVISIONS
12 SCOPE OF THE AGREEMENT
ARTICLE 1 GENERAL PROVISIONS
‘he. Contract Doctiments
ntact Docunients consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to the execution of this Agreement, other documents
listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract
and ate as fully a part of the Contract as if attached to this Agreement or repeated herein. Upon the Owner’s acceptance
of the Construction Manager’s Guararitéed Maximum Price proposal, the Contract Documents will also include the
documents described in Sectiori 2:2.3 and identified in the Guaranteed Maximum Price Amendment and revisions
prepared by the Architect and furnished by the Owner as described in Section 2.2.8. The Contract represents the entire
and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements,
either-written of oral. If anythitig iti the other Contract Documents, other than a Modification, is inconsistent with this
Agiéement, this Agreement'shall govern.
§ 4.2 Relationship of the Parties
The Construction Manager accepts the relationship of trust and confidence established by this Agreement and
covenants with thé Owner to cooperate with the Architect and exercise the Construction Manager’s skill and judgment
in furthering the interests of the Owner; to furnish efficient construction administration, management services and
supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an
expeditious and economical manner consistent with the Owner’s interests. The Owner agrees to furnish or approve, in
a timely nianner; information required by the Construction Manager and to make payments to the Construction
Manager in accordance with the requirements of the Contract Documents.
§ 1.3 General Conditions
For thé Preconstruction Phase, ALA Document A201™ 2007, General Conditions of the Contract for Construction,
shall apply only as specifically provided in this Agreement. For the Construction Phase, the general conditions of the
coritract shall be as set forth in A201~-2007, which document is incorporated herein by reference. The term
"Contractor" as used in A201-2007 shall mean the Construction Manager.
ARTICLE 2. CONSTRUCTION MANAGER'S RESPONSIBILITIES
The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 2.1 and 2.2. The
Construction Manager’s Construction Phase responsibilities are set forth in Section 2.3. The Owner and Construction
AIA Document A133™ — 2009 (formerly A121™CMc ~ 2003). Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved.
WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA”
Document, or any pertion of it, may result in severe civil and criminal penalties, and wii! be prosecuted fo the maximum extent possible under the law.
This document was produced by AIA software at 11:38:42’ on 04/22/2014 under Order No.8569967243_1 which expires on 09/16/2014, and is not for resale.
User Notes: (1784284242)
Manager may agree, in consultation with the Architect, for the Construction Phase to commence prior to completion of
the Preconstruction Phase, in which case, both phases will proceed concurrently. The Construction Manager shall
identify a representative authorized to act on behalf of the Construction Manager with respect to the Project.
§ 2.4 Preconstruction Phase
§ 2.4.1 The Construction Manager shall provide a preliminary evaluation of the Owner's program, schedule and
constriction budget requirements, each in terms of the other.
§ 2.1.2 Consultation
The Construction Manager shall schedule and conduct meetings with the Architect and Owner to discuss such matters
as procedures, progress, coordination, and scheduling of the Work. The Construction Manager shall advise the Owner
and the Architect on proposed site use and improvements, selection of materials, and building systems and equipment.
The Construction Manager shall also provide recommendations consistent with the Project requirements to the Owner
afid Architect of consttuctability; availability of materials and labor; time requirements for procurement, installation
and construction; aid factors telated to construction cost including, but not limited to, costs of alternative designs or
iiaterials, preliminary budgets, life-cycle data, and possible cost reductions.
§ 2.1.3 When Project requireinents in Section 3.1.1 have been sufficiently identified, the Construction Manager shall
prepare arid periodically update a Project schedule for the Owner’s acceptance. The Construction Manager shall
obtaitt the Architect’s approval for the portion of the Project schedule relating to the performance of the Architect’s
services. The-Project schedule:shall coordinate and integrate the Construction Manager's services, the Architect’s
services, other Owriai éotisultants’ services, and the Owner’s responsibilities and identify items that could affect the
Projéct’s:titnely ¢ompletion:'The updated Project schedule shall include the following: submission of the Guaranteed
Maxiriium Price proposal; components of the Work; times of commencement and completion required of each
Subcontractoi; orderiiis and delivery of products, including those that must be ordered well in advance of
constriiction; and the occtipancy requirements of the Owner.
§ 24.4Phased Constructi
The Construction Manager shall provide recommendations with regard to accelerated or fast-track scheduling,
procurement, of phased construction. The Construction Manager shall take into consideration cost reductions, cost
information, constructability, provisions for temporary facilities and procurement and construction scheduling issues.
§ 2.1.5 Preliminaty Cost: Estimates
§ 2.1.5.1 Based on thé preliminary design and other design criteria prepared by the Architect, the Construction
Manager shall prepare prelimitiary estimates of the Cost of the Work or the cost of program requirements using area,
volume of similar conceptual estimating techniques for the Owner’s approval. If the Architect or Construction
Mariager suggests alternative materials and systems, the Construction Manager shall provide cost evaluations of those
alternative-materials and systéitis..
§ 2.1.5.2 As the Architect progresses with the preparation of the Schematic Design, Design Development and
Construction Documents, the Construction Manager shall prepare and update, at appropriate intervals agreed to by the
Owner, Construction Manager aid Architect, estimates of the Cost of the Work of increasing detail and refinement
and allowing for the further dévélopment of the design until such time as the Owner and Construction Manager agree
on a Guaranteed Maximum Price for the Work. Such estimates shail be provided for the Owner’s approval: The
Construction Matiager shall inform the Owner and Architect when estimates of the Cost of the Work exceed the latest
approved Project budget and make recommendations for corrective action.
§ 2.1.6 Subcontractors and Suppliers
The Construction Manager shall develop bidders’ interest in the Project.
§ 2.1.7 The Construction Manager shall prepare, for the Architect’s review and the Owner’s acceptance, a
procurement schedule for items that must be ordered well in advance of construction. The Construction Manager shall
expedite atid coordinate the ordering and delivery of materials that must be ordered well in advance of construction. If
the Owner agrees to procure any items prior to the establishment of the Guaranteed Maximum Price, the Owner