READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 4, 2013 — BidTabulation DukeField SCADA FiberOptic Link — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 85-BidTabulation DukeField SCADA FiberOptic Link.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

TABULATION OF BIDS OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS DUKE FIELD SCADA FIBER OPTIC LINK JOB#41-449 NOTE BIOS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES Bid Date~ Thursday, December 13, 2012 CCI Systems, Inc. Ingram Signalizabon, Inc. World Fiber Technologies, Inc. 105 Kent Street 4522 North Davis Highway 4070 Nine McFarland Drive BASE BID Iron Mountain, MI 49801 Pensacola, FL 32503 Alpharetta, GA 30004 ITEM NO. EST. an UNIT UNIT PRICE TOT 1 LS Mobilization, Bonds and Insurance $10,228.39 $ 10.228.39 $10.62000 S 10,620.00 $ 8,395.80 $ 8,395.80 2 1 LS Coordination of Wert $23,689.73 $ 23.68973 $14,95000 S 14,950.00 $ 18,464 45 $ 18,464.45 3 37.023 LF Clean and proof existing empty segments 01 2" conduit and fumish and install pull tape within conduit $0.75 $ 27}6725 $ 0.93 $ 34,431 39 $ 2.49 $ 92.187.27 4 40.000 LF FurniSh and inslllli 96 strand fiber optic cable in existing empty 2" conduitand puB box system, Including all Splice enclosures, distribution centers. fusion splices, maintenance loops, seals, duci plugs. detectable pull tape, testing and all other appurtenances $2.31 $ 92,400.00 3.00 $ 120,000.00 303 $ 121.200.00 5 EA Furnish and inslllli new Pull Box $2,211.52 $ 6.63456 $ 2,40000 $ 7,200.00 $ 1,084.44 $ 3.253.32 6 EA Furnish and inslllli new Splice Box $866.05 $ 2,598.15 $ 4,200,00 $ 12,600.00 $ 2,084.59 6,253.77 163,518.08 199,801,39 S 249,154.61 As read at bid 0 enin 163,518.08 199,801.39 $ 249,154.61 ! of!

Download this text file with its original spacing ↓