READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 1, 2014 — reading text
Part 13 of 22. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
easement to
install approximately 5 miles of 16'' sewer force main in the Rocky Bayou area. A portion of the
new force main that was to be replaced in the area was located along East College Blvd along
Eglin Air Force Base property. An Eglin AFB utilities easement was obtained by OCWS for that
portion of the project using a description based off latitude & longitude calls. Since that time,
OCWS has the need for an additional 100' x 100' parcel along the same before mentioned route
for a sewer lift station. This lift station, called the "East County Repump Station" is needed in
order to divert East County flow (Bluewater Bay area) from the Niceville-Valparaiso Regional
Sewer Board WWTP to the Arbennie Pritchett WRF. Additionally, staff has also rewritten the
30'-wide easement for the pipe alignment using bearing and distances based off Florida State
Plain North. This easement amendment is conceptually depicted on the attached "East County
Master Sewer Plan" as Phase 2 (pipeline) and Phase 9 (lift station).
OPTIONS: Approve or deny.
RECOMMENDATIONS: Staff recommends BCC approval for the Chairman to execute
Amendment #1of the Air Force’s “Grant of Easement” for the East County Sewer Conveyance
Improvements Project.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 293
Packet Pg. 294
Packet Pg. 295
Packet Pg. 296
Packet Pg. 297
Packet Pg. 298
Packet Pg. 299
Packet Pg. 300
Packet Pg. 301
Packet Pg. 302
Packet Pg. 303
Packet Pg. 304
Packet Pg. 305
Packet Pg. 306
Packet Pg. 307
Packet Pg. 308
Packet Pg. 309
Packet Pg. 310
Packet Pg. 311
Packet Pg. 312
Packet Pg. 313
Packet Pg. 314
Packet Pg. 315
Packet Pg. 316
Packet Pg. 317
Packet Pg. 318
Packet Pg. 319
Packet Pg. 320
Packet Pg. 321
Packet Pg. 322
Packet Pg. 323
Packet Pg. 324
Packet Pg. 325
Packet Pg. 326
Packet Pg. 327
Packet Pg. 328
Packet Pg. 329
Packet Pg. 330
Packet Pg. 331
Packet Pg. 332
Packet Pg. 333
Packet Pg. 334
Packet Pg. 335
Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station
Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM
Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station
LLY
Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE
Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate
Phase 6: Replace 10" FM at Canal with 16" FM
WOLVERINE
JACKSO N
E
Y
EG
LA R
LL
JC
CO
ER
ROG
S
STIC
VAL A
ANDREW
5
Y8
HW
ND
BO
Arbennie Pritcehtt WRF R TW
O BE
NR
GE Proposed Eglin Main Lift Station
LEWIS TURNER
East County Master Sewer Plan - Page 1
.
MAP PROJECTION:
Lambert Conformal Conic Projection
Stateplane : Flo ida Nor th (0903)
NAD 1983(90), NAVD 1988.
Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD:
This map was created by Okaloosa County GIS
and is in the public domain pur uant
Phase 1 Phase 4 Phase 7 Phase 10
to Chapter 119 , Florida Statutes.
DISCLAIMER:
Phase 2 Phase 5 Phase 10a 1 inch = 2,500 feet
Okaloosa County h reby expressly disclaims
Phase 8 any liability for errors or omissions in
these maps, indexes or legends.
Packet Pg. 336
85
Y2
UNNAME D
HW
Proposed College Blvd Lift Station
EN
