READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — July 1, 2014 — reading text

Part 13 of 22. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

easement to install approximately 5 miles of 16'' sewer force main in the Rocky Bayou area. A portion of the new force main that was to be replaced in the area was located along East College Blvd along Eglin Air Force Base property. An Eglin AFB utilities easement was obtained by OCWS for that portion of the project using a description based off latitude & longitude calls. Since that time, OCWS has the need for an additional 100' x 100' parcel along the same before mentioned route for a sewer lift station. This lift station, called the "East County Repump Station" is needed in order to divert East County flow (Bluewater Bay area) from the Niceville-Valparaiso Regional Sewer Board WWTP to the Arbennie Pritchett WRF. Additionally, staff has also rewritten the 30'-wide easement for the pipe alignment using bearing and distances based off Florida State Plain North. This easement amendment is conceptually depicted on the attached "East County Master Sewer Plan" as Phase 2 (pipeline) and Phase 9 (lift station). OPTIONS: Approve or deny. RECOMMENDATIONS: Staff recommends BCC approval for the Chairman to execute Amendment #1of the Air Force’s “Grant of Easement” for the East County Sewer Conveyance Improvements Project. RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator Packet Pg. 293 Packet Pg. 294 Packet Pg. 295 Packet Pg. 296 Packet Pg. 297 Packet Pg. 298 Packet Pg. 299 Packet Pg. 300 Packet Pg. 301 Packet Pg. 302 Packet Pg. 303 Packet Pg. 304 Packet Pg. 305 Packet Pg. 306 Packet Pg. 307 Packet Pg. 308 Packet Pg. 309 Packet Pg. 310 Packet Pg. 311 Packet Pg. 312 Packet Pg. 313 Packet Pg. 314 Packet Pg. 315 Packet Pg. 316 Packet Pg. 317 Packet Pg. 318 Packet Pg. 319 Packet Pg. 320 Packet Pg. 321 Packet Pg. 322 Packet Pg. 323 Packet Pg. 324 Packet Pg. 325 Packet Pg. 326 Packet Pg. 327 Packet Pg. 328 Packet Pg. 329 Packet Pg. 330 Packet Pg. 331 Packet Pg. 332 Packet Pg. 333 Packet Pg. 334 Packet Pg. 335 Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station LLY Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate Phase 6: Replace 10" FM at Canal with 16" FM WOLVERINE JACKSO N E Y EG LA R LL JC CO ER ROG S STIC VAL A ANDREW 5 Y8 HW ND BO Arbennie Pritcehtt WRF R TW O BE NR GE Proposed Eglin Main Lift Station LEWIS TURNER East County Master Sewer Plan - Page 1 . MAP PROJECTION: Lambert Conformal Conic Projection Stateplane : Flo ida Nor th (0903) NAD 1983(90), NAVD 1988. Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD: This map was created by Okaloosa County GIS and is in the public domain pur uant Phase 1 Phase 4 Phase 7 Phase 10 to Chapter 119 , Florida Statutes. DISCLAIMER: Phase 2 Phase 5 Phase 10a 1 inch = 2,500 feet Okaloosa County h reby expressly disclaims Phase 8 any liability for errors or omissions in these maps, indexes or legends. Packet Pg. 336 85 Y2 UNNAME D HW Proposed College Blvd Lift Station EN

Download this text file with its original spacing ↓