READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 04-10-12 cra — reading text
Part 9 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31268-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
include other road improvement projects, such as capacity building, bicycle lanes, congestion
management, and enhanced pedestrian features.
2. Continue adding sidewalks and improving existing sidewalks where needed. Develop a
prioritized list of sidewalk improvement projects.
Aging and failing water and sewer lines make the Fort Walton Beach CPA less attractive for
redevelopment compared to newly built areas. Upgrade these lines to accommodate higher v
density to attract more developers to the CRA.
acry
Q
1. Implement a yearly program to utilize CRA funds to complete needed underground v
infrastructure in the CRA.
N
0
2. Offer incentives to incoming developers, such as a Development Infrastructure grant
program, that may provide up to 75% of qualifying expenses necessary to upgrade
infrastructure for incoming commercial and residential projects in the CRA.
Na
NC
In many locations, multifamily residents and
businesses rely on individual garbage cans,
primarily due to space limitations for dumpsters.
For small businesses, even the smallest dumpster
may be too large for the business needs. However,
in areas with small lots, narrow sidewalks, or
narrow streets, the proliferation of garbage cans,
seen in the photograph below, is unsightly and
strategy to coordinate with users to establish
for dumpsters to serve multiple users,
ie need for individual garbage cans.
should be screened from view to the
extent possible.
f41
2012 Community Redevelopment Plan
Packet Pg. 39
F8 Ca
1. Develop a program for establishing joint use dumpstcrs in areas now cluttered with
individual garbage cans.
2. Provide financial incentives for installing screening or landscaping to buffer existing
dumpsters to improve the appearance of these facilities throughout the CRA.
m
aa
acN
UNON
nTb
Page 26 of 4l
2012 Community Redevelopment Plan
Packet Pg. 40
8. 1. a
COMPONENT 3 - TRANSPORTATION
TRANSPORTATION GOAL:
ENSURE THE AVAILABILITY OF AN ADEQUATE AND SAFE MIILTIMODAL
TRANSPORTATION SYSTEM THROUGHOUT THE CRA
Objectives:
Improve Safety Through installing Traffic Calming and Congestion Management
Design Features em
a
Promote the Use of and Enhance the Availability of Transit Facilities
Continue to Promote Walkable Areas Throughout the CRA Though the Installation of N
Pedestrian- Friendly Features
cN
Ensure Adequate Bicycle Facilities ' Throughout the CRA
N
Ensure Adequate and Accessible Parking Throughout the CRA
The transportation system within the Fort Walton Beach CRA is functional, but can be congested
and unsafe at times. Major arterial roads such as Miracle Strip Parkway ( U. S. Highway 98),
Eglin Parkway ( State Road 85), and Beal Parkway ( State Road 89) carry a capacity of up to
33, 500 AADT ( average annual daily traffic), 38, 000 AADT, and 15, 000 AADT, respectively.
Due to the already built -out nature of the City, and the CRA specifically, most road widening
projects to increase capacity through additional lanes on major roadways are not feasible.
Therefore, it is important to focus on transportation improvements that can improve mobility in
the CRA, such as enhanced pedestrian facilities, bikeways, and other congestion management
and traffic calming techniques. Providing multimodal transportation options in the CRA is
increasingly important in order to support the denser, mixed -use development pattern planned for
the CRA.
When traffic volumes approach or exceed capacity during peak hours or seasons, the resulting
congestion reduces mobility. Congestion management can include roadway design practices such
as limiting the number of driveways on arterials, installing needed turning lanes, intersection
improvements, rerouting through -traffic, and traffic signal synchronization. Other congestion
management strategies include ways to actually reduce capacity by encouraging other modes of
Page 27 of 41
2012 Community Redevelopment Plan
Packet Pg. 41
B. i. a
transportation including transit service, walking, and bicycling. Traffic calming principally
involves managing vehicle speed, modifying drivers' behaviors, and reducing traffic volume in
order to increase the safety level for all modes of travel. The most common practices for traffic
calming include installing speed tables, medians, street trees, pavement treatments, signage, and
diverters.
Existin Roadwa Anal sis:
SR 85 ( Eglin Parkway) Undivided 6 -lane major arterial Median improvements, continuous
surrounded by primarily strectscape/ improved sidewalks,
sidewalks, underground
commercial land uses, including wider
Uptown Station utilities, improved pedestrian
crossings, limit continuous curb cuts,
improved internal circulation
aNK0
US 98 ( Miracle Strip 4 -lane divided major arterial Improved pedestrian crossings; acm
Parkway) carrying through traffic from enforced speed limit; Brooks Bridge rc
Pensacola to Panama City; low improvements; wider and improved
speed limit, new streetsrape sidewalks west of Brooks Street; UN
downtown; tree -lined medians streetscaping west of Brooks Street ON
Undivided 4 -lane minor arterial Improved sidewalks, additional
SR 189 ( Beal Parkway)
pedestrian crossings
Brooks Street 2 -lane ' local" road with low Streetscaping and/ or underground
volume traffic; streetseape north utilities south side; additional raised
side only; low speeds, existing pedestrian crossings; well -marked
raised pedestrian crossings parking, additional lighting
wider
Hollywood Boulevard Undivided" 2 -lauc minor Improved sidewalks (
collector with suicide lane and sidewalks, continuous sidewalks),
landscape, street
excess paved ROW principally streetscapc/
located in the light reconfiguration for marked bike lanes
industrial /mixed use retail district and possibly 4 -lanes or landscaped
medians with mm lanes, marked
pedestrian crossings
First Street, Second Street, Many " local" roads in the CRA Some of the local streets could be
Third Street, Fourth Street, are set up fairly grid -like, improved through strectsceping,
sidewalks, wider
Bass Avenue, Shell Avenue, providing alternate routes through landscaping,
Harbeson Avenue, Carson the main part of the CRA. sidewalks, continuous sidewalks, and
Drive, Alder Avenue, pedestrian friendly crossings and
Chicago Avenue, McGriff
