Current Rate Enacting Resolution/
Service Ordinance
BUILDING PERMIT FEES( Sec. 3. 02. 05)*
A surcharge will be collected in accordance with and for the purposes stated in F. S. 468. 631 and F.S. 553. 721. Res. 2010-25 09/28/ 10
General Fees
Building permit processing fee 22. 50 Res. 2010- 25 09/ 28/ 10
25. 75 per submittal SFD 51. 50
Revisions to approved permit, per submittal per submittal MF 77. 25 per Res 2008- 15 04/ 08/ 08
submittal Com
Penalty for commencement prior to permitting
Three( 3) times the permit fee Res 2024- 13 09/ 24/24
Sec. 3. 01. 05)
Change of contractor, transfer of permit
Prorate balance of work Res 2003- 01 1/ 28/ 03
Sec. 3. 01. 12)
Notice of Commencement( NOC)( Sec. 713. 135) 5. 00
Expired permit( Sec. 3. 01. 08) Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07
Conditional; no work has commenced and permit has
Refund of permit fee( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07
not expired; requires written notice to the BO
Construction Permit Fees
No permit required for cosmetic work only, such as
500 or less carpet, tile, painting, landscaping, etc. Exceptions
Res 07- 15 09/ 05/ 07
include any structural change or any work that
requires an inspection per the FBC.
t
39.00 for the first thousand, plus$ 6.60 for each
501 to$ 50,000 Res. 2010- 25 09/ 28/ 10
Permit based on value thousand or fraction thereof, to and including$ 50, 000
of work, includes labor,
materials, site work, 360.55 for first$ 50, 000 plus$ 5. 25 for each
and design fees $ 50,001 to$ 100,000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
including$ 100, 000
623. 00 for the first$ 100, 000 plus$ 4.00 for each
100, 001 to$ 500, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
including$ 500,000
2,219. 00 for the first$ 500, 000 plus$ 2. 75 for each
500, 001 and up Res. 2010- 25 09/ 28/ 10
additional thousand or fraction thereof
Plan check fee 50% of building fee( Sec. 3. 02.06) Res 2009- 35 09/ 09/09
Threshold building transmittal/ processing fee/ ICC 206.00 Res 2008- 15 04/ 08/ 08
Moving Fee 113. 50 Res 2008- 15 04/ 08/ 08
Demolition Fee 59.50 plus$ 9.45 per 2,000 sq ft above 20,000 sq ft
Res. 2010-25 09/28/ 10
or fraction thereof
Additional Inspection Fee 38. 00 Res. 2010-25 09/28/ 10
Additional Inspection Fee- after hours 50. 00 per hour( 2 hour minimum) Res 2014- 2 02/ 11/ 14
Re- Inspection Fee( the building inspector returns to First-$ 38. 00
the job site to review corrected work denied on the Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10
previous inspection for the same violation) Third and more-$ 115. 50
Certificate of Occupancy 38. 00 Res. 2010- 25 09/ 28/ 10
Certificate of Completion 38. 00 Res. 2010- 25 09/ 28/ 10
Temporary Certificate of Occupancy 270. 50 Res. 2010- 25 09/ 28/ 10
Mechanical Permits and Inspection
Permit Fee Base 39. 00 Res. 2010- 25 09/28/ 10
15. 00 for the first$ 1, 000 or fraction thereof of the
Inspection of heating, ventilation, ductwork, air $
valuation of installation plus$ 2. 75 for each additional Res. 2010- 25 09/ 28/ 10
conditioning and refrigeration systems
1, 000 or fraction thereof
Inspecting repairs, alterations, and additions on 5. 80 plus$ 3. 45 for each additional$ 1, 000 or
Res. 2010- 25 09/ 28/ 10
existing systems fraction thereof
Department and/ or
Current Rate
Enacting Resolution/
Fee Description
Service Ordinance
Inspecting Boilers
Boiler Inspections 40.00 Res. 2010-25 09/ 28/ 10
First-$ 38. 00
Reinspection of a heating, ventilation, air
conditioning or refrigeration system, or boiler Second-$ 38. 00 Res. 2010-25 09/ 28/ 10
inspection( reinspection same as above) Third and more-$ 115. 50
Inspection for permitting temporary operation of First-$ 38. 00
heating, ventilating, refrigeration, or air condition Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10
system( reinspection same as above) Third and more-$ 115. 50
Reduced by 50% housing, unless permit is for
Rehabilitation of substandard minimum of$5. 00. Repairs, alterations and additions Res 2003- 01 1/ 28/ 03
to an existing system under$ 500.00
Plumbing and Gas Permits
Base Permit Fee 39.00 Res. 2010-25 09/ 28/ 10
Plus, per plumbing fixture, floor drain or trap, 3. 45 Res. 2010- 25 09/ 28/ 10
including water and drainage pipe
Plus, per sewer connection 12. 00 Res. 2010-25 09/ 28/ 10
Plus, per water heater and/ or vent 3. 15 Res. 2010-25 09/ 28/ 10
For installation, alteration or repair of water piping 6. 05 Res. 2010-25 09/ 28/ 10
and/ or water treating equipment
For repair/ alteration of drainage or vent piping 6. 05 Res. 2010- 25 09/ 28/ 10
For vacuum breakers or backflow protective
1 to 5-$ 3. 15
devices subsequent to the installation of the piping