READ ALONGSIDE THE SOURCE
Fort Walton Beach Ordinance — 1757 Public School Facilities Element — reading text
Part 3 of 57. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-14905-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
maximization of capacity. Other considerations for
amendinc concurrency service areas may include safe access ( includina
factors such as the presence of sidewalks. bicvcle paths. turn lanes and
sionalization. oeneral walkability).
diversity and ceooraphic or man- made
constraints to travel. The types of adjustments to school operations that
will be considered in the City will be determined by the state standards on
maximization of capacity.
4. Student Generation Rates: Consistent with the Interlocal Acreement.
the School Board staff. workinc with the City staffs. will develop and
apply
student ceneration multipliers for residential units bv type and proiected
Page 9 of 18
1757
price for schools of each type. considerina past trends in student
enrollment in order to project school enrollment. The student aeneration
rates shall be determined by the School Board in accordance with
professionally acceDted methodolooies. shall be reviewed at least every
two years and chanced. as necessary. These chanaes shall be adopted
into the County' s Comprehensive Plan.
5. School Capacity and Enrollment: The Department of Education
permanent Florida Inventory of School Houses ( FISH) capacity is adopted
as the uniform methodoloav to determine the capacity of each school.
Relocatables are not considered permanent capacity. School enrollment
shall be based on the annual enrollment of each school based on actual
counts reported to the Department of Education in October of each year in
order to formulate the Capital Outlay Full Time Eauivalent ( COFTE)
standards.
6. Concurrency Availability Standard: The City shall amend the
concurrency manaaement systems in its land development reculations to
reauire that annual monitorina reports provided to their aovernina bodies
will cover schools as well as other concurrency facilities. all proposed
residential units be reviewed for school concurrency at the time of final
subdivision plat or site plan review. The city shall not deny a final
subdivision plat or site plan for residential and residential mixed- use
development approvals due to a failure to achieve and maintain the
adopted level of service for public school capacity where:
a. Adeauate school facilities will be in place or under actual
construction within three years after the issuance of the final
subdivision plat or site plan approval for residential and residential
mixed- use development: or.
b. Adeauate school facilities are available in an adiacent concurrency
service area and the impacts of residential and residential mixed-
use development can be shifted to that area: or.
c. The developer executes a lea ally bindino development aareement
to provide mitication proportionate to the demand for public school
facilities to be created by the actual impact of the proposed
residential and residential mixed- use development application
subject to the final subdivision plat or site plan approval ( or the
functional eauivalent)as provided in the Interlocal Aareement.
In evaluatina afinal subdivision plat or residential or mixed use
residential site plans for concurrency. any relevant proarammed
improvements in the current year and years 2 or 3 of the 5- year
schedule of imDrovements shall be considered available capacity
for the project and factored into the level of service analysis. Any
relevant procrammed improvements in years 4 or 5 of the 5- year
Page 10 of 18
1757
schedule of improvements shall not be considered available
capacity for the project unless fundina for the improvement is
assured. throuch School Board fundina. throuah proportionate fair
share mitiaation. or some other means. - Relocatable classrooms
may provide temporary capacity while funded schools or school
expansions are beina constructed.
7. Final Subdivision Plat and Site Plan Approval Standards: In the event
that the School Board comments that there is not sufficient capacity in the
affected concurrency service area to address the impacts of a proposed
residential and residential mixed- use development. the followinc
standards shall aPDly. Either 0) the site plan or final subdivision plat must
provide capacity enhancement sufficient to meet its impacts throuah fair
share mitioation: or ( ii) the site plan or final subdivision plat must be
delayed to a date when capacity enhancement and level of service can be
assured: or ( iii) a condition of approval of the site plan or final subdivision
plat shall be that the project' s development plan and/ or buildino permits
shall be delayed to a date when capacity enhancement and level of
service can be assured. The amount of mitiaation reauired shall be
determined by the Department of Education' s most current cost per
student station applicable to Okaloosa County.
Policy 1. 3. 5.2: Options for providinc fair share mitication for any approval of
additional residential dwellinc units that triccers a failure of level of service for
public school capacity shall include the followino:
1. Contribution of. or payment for. acauisition of new or expanded
school sites: and/ or
2. Construction or expansion of permanent school facilities: and/ or
3. Explore the creation of a mitication bank servinc the desianated
areas based on the construction of a public school facility.
Mitioation shall be directed to projects on the School Board' s Work Plan
that the School Board acrees will satisfy the demand created by that
development approval. and shall be assured bv a leaally bindina
development aoreement between the School Board. the County. and the
aDPlicant executed prior to the issuance of the final subdivision plat. site
plan approval or the functional eauivalent. If the School Board acrees to
the mitication. the School Board must commit in the acreement by placinc
the improvement required for mitiQation in its Work Plan. This
development aQreement shall include the landowner' s commitment to
continuinc renewal of the development acreement for reauired mitiaation.
until all impacts for public school facilities created by the actual
development of the property are miticated.
Page 11 of 18
1757
Policy 1.3. 5. 3 -- The amount of mitiaation reauired shall be determined
by calculatino the number of student stations for each school type for
which there is not sufficient capacity usino the student oeneration rates
applicable to a particular type of residential or residential mixed use
development and multiplyina bY the DOE costs per student station for
each school type applicable to Okaloosa County. as determined bY the
School Board. in addition to any land costs for new or expanded school
sites. if applicable.
OBJECTIVE 1. 3.6 -- FUNDING
THE CITY. WITH COOPERATION FROM THE SCHOOL BOARD AND THE
DEVELOPER. WILL COLLABORATE TO FIND MEANS TO ENSURE
SUFFICIENT CAPACITY WILL EXIST TO ACCOMMODATE RESIDENTIAL OR
RESIDENTIAL MIXED USE DEVELOPMENT AT THE TIME OF IMPACT
THROUGH PROPORTIONATE FAIR SHARE. DEVELOPER CONTRIBUTIONS.
PROJECT PHASING OR DEVELOPER PROVIDED FACILITY
IMPROVEMENTS AS A WAY TO REALIZE THE COST OF NEW RESIDENTIAL
AND RESIDENTIAL MIXED USE DEVELOPMENT IN REGARDS TO THE
ABILITY OF THE SCHOOL BOARD TO PROVIDE ADEQUATE FACILTIES. AS
NEEDED.
Policy 1. 3. 6. 1 -- Once the School Board has determined how it will meet
the anticipated enrollment demand when capacity has been maximized.
includino available caDacity or lack thereof in contiauous concurrency
service areas. then the City will collaborate with the School Board to
determine the necessity to establish alternate fundina sources within next
year' s cycle of the Work Proaram and Capital Improvements schedule
adoption process. Uniform district-wide concurrency standards by school
type must be maintained. This policy shall not be construed to obliaate or
reQuire the City to fund the School Board Work Plan.
OBJECTIVE 1.3. 7 - MONITORING AND EVALUATION
FORT WALTON BEACH WILL STRIVE TO CONTINUALLY MONITOR AND
EVALUATE THE PUBLIC SCHOOLS FACILITIES ELEMENT IN ORDER TO
ASSURE THE BEST PRACTICES OF THE JOINT PLANNING PROCESSES
AND PROCEDURES FOR COORDINATION OF PLANNING AND DECISION-
MAKING.
Policy 1. 3. 7. 1 - The City and the School Board will coordinate durina
updates or amendments to the Okaloosa County' s Comprehensive Plan
and updates or amendments for lona- ranae plans for School Board
facilities.
Existina and Future Conditions Maps
Locations of schools and the CSAs are depicted on PSFE Map A.
Page 12 of 18
1757
Consistent with Section 163.3177( 12)( a).Florida Statutes. Map PSFE Map B the Public
School Facilities element includes future conditions maps showina existina and
anticipated schools over the five-year plannina period. No new schools are planned
within Fort Walton Beach.
Maps for the lona- term plannina period will be included after their upcomina adoption
date. anticipated in late 2007. These maps will be aeneral over the lona- term plannina
period and will not prescribe a land use on a particular parcel of land.
Section 3. Adoption of Amendments to Intergovernmental Coordination
Element
Directions- The Comprehensive Plan of the City of Fort Walton Beach: 2008,
codified as Volume III of the Code of Ordinances of Fort Walton Beach, and originally
adopted as Ordinance 1401, is amended to include necessary amendments to the
Intergovernmental Coordination Element in compliance with the Public School Facilities
Interlocal Agreement adopted as resolution 2007- 03 on March 27, 2007.
GOAL G1 -COLLABORATE AND COORDINATE WITH THE OKALOOSA COUNTY
SCHOOL BOARD TO ENSURE HIGH QUALITY PUBLIC SCHOOL FACILITIES
WHICH MEET THE NEEDS OF FORT WALTON BEACH' S EXISTING AND FUTURE
POPULATION.
OBJECTIVE G1. 1 - SCHOOL INTERLOCAL AGREEMENT
THE CITY WILL IMPLEMENT THE INTERLOCAL AGREEMENT PURSUANT
TO FL. STA. 163. 3177 WITH THE SCHOOL BOARD. COUNTY. AND
ADJACENT MUNICIPALITIES PROVIDING FOR THE CLOSE COORDINATION
AND EVALUATION OF RESIDENTIAL AND RESIDENTIAL MIXED- USE
DEVELOPMENT PROPOSALS PURSUANT TO THE INTERLOCAL
AGREEMENT AND TO ENSURE THE OBLIGATIONS OF THE CITY ARE
FULFILLED. INCLUDING: PARTICIPATION IN STAFF WORKING GROUP
MEETINGS. SCHOOL SITE SELECTION COMMITTEES. WRITTEN
AGREEMENTS. ANNUAL JOINT WORKSHOPS OF ELECTED OFFICIALS
ADDRESSING ISSUES OF MUTUAL CONCERN. COORDINATION OF
GROWTH PROJECTIONS AND STUDENT ENROLLMENT. SUPPORTING THE
OVERSIGHT COMMITTEE ON IMPLEMENTATION OF THE INTERLOCAL
AGREEMENT.
