READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — December 1, 2015 — 12) CDM Final Negotiated Cost - APWRF Expan — reading text

Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

12) CDM Final Negotiated Cost - APWRF Expan — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Page 3 Arbennie Pritchett WRF Expansion 10/5/2015 11:47 AM Estimate Totals Description Amount Totals Labor 1,456,289 Material 3,868,668 Subcontract 3,310,182 Equipment 372,386 Other 420,949 Subtotal Direct Cost 9,428,474 9,428,474 Indirect Costs Sub Bonds 141,427 Permits-By Okaloosa County Sales Tax (MEO) - Okaloosa Co. 272,149 Subtotal Prior to OH&P 413,576 9,842,050 Construction Contingency 400,000 Subtotal Cost, Today's Dollars 400,000 10,242,050 Escalation Total Direct Construction Cost 10,242,050 Design-Build Costs Warranty CDMS 2015 DB Bonds 94,782 FL Bond Surcharge 1,233 Bldr's Risk Insurance 56,269 BR Ins Surplus Lines Policy-FL 3,500 CM Gen Liab Ins (% total cost) 14,130 Cost of the Work 169,914 10,411,964 G&A 1,062,863 CM Markup 187,840 Total Construction Cost 1,250,703 11,662,667 Engineering & SDCs 818,037 818,037 12,480,704 Total 12,480,704 E:\Estimating\01 PROJECTS\03 SER-ORL\FL\Okaloosa County\2015-04 Arbennie Pritchett WRF D-B\130 Timberline Estimates2015-05-009-CUTS-APWRF Exp CAG FINAL TO CLIENT.pee

Download this text file with its original spacing ↓