READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — December 18, 2012 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 95-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: February 5, 2013 TO: Honorable Chairman and Members of the Board FROM: John Hofstad SUBJECT: Task Order 46 - Baker Landfill - 2013 Environmental Restoration DEPARTMENT: Public Works BCC DISTRICT: All STATEMENT OF ISSUE: Professional services are required for compliance with Florida Department of Environmental Protection (FDEP) Permit/Certification #0075982-004-SF which addresses long term care and remediation of Baker Landfill. Professional services are also required to comply with the FDEP Remedial Action Modification Approval Order dated December 7, 2011. BACKGROUND: Baker Landfill has two FDEP regulated environmental interests - Long Term Care (LTC) and Corrective/Remedial Action. LTC is an FDEP permitted activity that requires monitoring of groundwater from a designated network of sampling locations. The County has been performing this compliance monitoring since the landfill was closed to land filling activities in 1998 and was permitted for LTC status in 2003. Since that time the County has complied with the permit through sampling of the monitoring network. SCS Engineers has been contracted to perform these activities since 2007. FDEP directed the County to initiate Corrective Actions in 1989 due to the detection of chemical constituents in the groundwater exceeding FDEP water quality standards. FDEP approved the County’s Contamination Assessment Report in 1993 and the County began the design of a Remedial Action Plan in 1994. Several iterations of the Remedial Action Plan were produced over the next few years and FDEP approved the County’s remediation plans in 2002. The remedial action system became operational in 2004. Based on operational observations, the remediation system has been slightly modified from the original design. After two years of operation, the remediation system was shut down in September 2006 to address a compromise of the liner system in one of the treatment ponds. The remediation system was not reactivated until August 2008. Due to lack of maintenance, the remediation system was not operating fully until May 2009. Operational characteristic assessments of the system indicated that the system was not performing to design specifications for a variety of reasons. A Remedial Action Plan Modification (RAPMod) was solicited from the FDEP and approved in December, 2011. Construction of the RAPMod infrastructure was completed in 2012. The RAPMod also included revisions to the environmental sampling scheme. Both Long Term Care Semi-Annual Compliance and Remedial Action Assessment monitoring are budgeted activities. The activities in this Task Order address services to be performed in 2013. In order to meet LTC Permit and Remedial Action requirements, the LTC and RAP Mod requires two monitoring events for an amount not to exceed $102,200. OPTIONS: Approve / Disapprove RECOMMENDATIONS: Approve the scope and fee with SCS Engineers not to exceed value of $102,200. RECOMMENDED BY: APPROVED BY: James D. Curry, County Administrator

Download this text file with its original spacing ↓