$95,000.00 $59,959.00 $59,959.00 2 P-620-1 Reflective Pavement Markings 2,500 SF $2.10 $5,250.00 $2.35 $5,875.00 3 _ P$20-2 Non-Reflective Pavement Markings 3,000 SF $1.50 $4,500.00 $1.90 $5,700.00 ~ 4 S-140 [reverent Marking Removal 7,000 SF $2.10 $14,700.00 $2.80 $19,600.00 5 S-140____ [Removal of Existing Lift Device Gate BS pa ses $4752.00 $4,752.00 Provide and Install New Ground Power Cables and 4 12208 Connections. This pay item includes both bridges. 1 LS $6,500.00: $6,500.00 BIGASt 00 pone 7 019208 4 Ls $8,500.00 $8,500.00) $10,150.00 $10,150.00 8 01920C [Relocate Interior Gate Signage 1 LS $4,500.00 $4,500.00 $2,172.00 $2,172.00 Baggage Lifting System. This item shall include all work necessary for a complete operational system in place as required by the plans and specifications. Work items include but are not : 9 14540 Iiaied to foundational lectrical 4 EA $30,000.00 $120,000.00 $34,930.25 : ee connections, baggage cart, modification of and watertight attachment to existing passenger boarding bridges. Passenger Boarding Bridge. This item shail include all design, fabrication, procurement, installation, and construction of a complete o 14950 operational apron drive passenger boarding bridge 2 EA $600,000.00 #1,200,000.00 $711,043.50 cies and fixed bridge system to be connected to the Total $1,458,950.004 jTotal ADD Biv PH OND O D AIR {tem} Pay [tem Number item Description . Quantity } Unit Unit Price Amount . Unit Price Amount ‘At-4 $-140 __ |Remove Existing Pre Conditioned Air Unit. 2 EA $5,000.00 $10,000.00) "$1,700.50 $3,401.00 DEDUCT - "Provide and Install New Pre A1-2 01920 Conditioned Air Hoses and Connections" from iT LS ($38,500.00) -$8,500.00' (310,150.00) -$10,150.00 BASE BID ITEM 7 above. ‘At 14950 2 EA $100,000.00 $200,000.00} $102,163.00 $204,326.00 Total $201,500.00} {Total : ADD BID RO D PO Item} Pay Item Number Item Description Quantity | Unit Unit Price Amount Unit Price Amount |A2-4 $-140 Remove Existing Ground Power Unit. 2 EA $6,500.00 $13,000.00; $905.00 $1,810.00 DEDUCT - "Provide and Install New Ground Power Cables and Connections. This pay item ree een A) Z ($16 43400) 4 Aad ptea0 includes both bridges." from BASE BID ITEM 6 1 Ls (30.500.00 S6.00.06 (516.434 00 vib Aotod above. Provide and Install 28VDC/400Hz Frequency |A2-3} 14950 Converter Ground ei Unit. Complete In Place. 2 EA $60,000.00 $120,000.00; $64,617.50 $129,235.00 Total $126,500.00} {Total * Represents an error in math from the bid form FUNDING ADJUSTMENTS bers contgined within this Bid Tabulation are Grant #1 IAP 49-14 Base minus item 9 (Bag Lifts) $1,546,729.00 Boarding Bridge Base plus Additive Bid 1 $1,744,306.00 | = Boarding Bridges Base July 14, 2014 - ‘ Boarding Bridge Base plus Additive Bid 1 &2 $1,858,917.00 Doug Hambrecht, P.E. THE H_E4 i Grant #2 THE LPA GROUP INCORPORATED GROUP === {Bag Lifts B-1, B-2, B-3, and B-5 (item 9) $139,721.00} TRANSPORTATION CONSULTANTS: AUon of Michoe! Boker 7/14/2014 BOARDING BRIDGES AND BAG LIFTS- Bid Tab.xIsx

Download this text file with its original spacing ↓