READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 19, 2014 — FAA Grant Application_Bag Lifts at VPS — reading text
Part 4 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 38-FAA Grant Application_Bag Lifts at VPS.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
$95,000.00 $59,959.00 $59,959.00
2 P-620-1 Reflective Pavement Markings 2,500 SF $2.10 $5,250.00 $2.35 $5,875.00
3 _ P$20-2 Non-Reflective Pavement Markings 3,000 SF $1.50 $4,500.00 $1.90 $5,700.00 ~
4 S-140 [reverent Marking Removal 7,000 SF $2.10 $14,700.00 $2.80 $19,600.00
5 S-140____ [Removal of Existing Lift Device Gate BS pa ses $4752.00 $4,752.00
Provide and Install New Ground Power Cables and
4 12208 Connections. This pay item includes both bridges. 1 LS $6,500.00: $6,500.00 BIGASt 00 pone
7 019208 4 Ls $8,500.00 $8,500.00) $10,150.00 $10,150.00
8 01920C [Relocate Interior Gate Signage 1 LS $4,500.00 $4,500.00 $2,172.00 $2,172.00
Baggage Lifting System. This item shall include all
work necessary for a complete operational system
in place as required by the plans and
specifications. Work items include but are not :
9 14540 Iiaied to foundational lectrical 4 EA $30,000.00 $120,000.00 $34,930.25 : ee
connections, baggage cart, modification of and
watertight attachment to existing passenger
boarding bridges.
Passenger Boarding Bridge. This item shail
include all design, fabrication, procurement,
installation, and construction of a complete
o 14950 operational apron drive passenger boarding bridge 2 EA $600,000.00 #1,200,000.00 $711,043.50 cies
and fixed bridge system to be connected to the
Total $1,458,950.004 jTotal
ADD Biv PH OND O D AIR
{tem} Pay [tem Number item Description . Quantity } Unit Unit Price Amount . Unit Price Amount
‘At-4 $-140 __ |Remove Existing Pre Conditioned Air Unit. 2 EA $5,000.00 $10,000.00) "$1,700.50 $3,401.00
DEDUCT - "Provide and Install New Pre
A1-2 01920 Conditioned Air Hoses and Connections" from iT LS ($38,500.00) -$8,500.00' (310,150.00) -$10,150.00
BASE BID ITEM 7 above.
‘At 14950 2 EA $100,000.00 $200,000.00} $102,163.00 $204,326.00
Total $201,500.00} {Total :
ADD BID RO D PO
Item} Pay Item Number Item Description Quantity | Unit Unit Price Amount Unit Price Amount
|A2-4 $-140 Remove Existing Ground Power Unit. 2 EA $6,500.00 $13,000.00; $905.00 $1,810.00
DEDUCT - "Provide and Install New Ground
Power Cables and Connections. This pay item ree een A) Z ($16 43400) 4
Aad ptea0 includes both bridges." from BASE BID ITEM 6 1 Ls (30.500.00 S6.00.06 (516.434 00 vib Aotod
above.
Provide and Install 28VDC/400Hz Frequency
|A2-3} 14950 Converter Ground ei Unit. Complete In Place. 2 EA $60,000.00 $120,000.00; $64,617.50 $129,235.00
Total $126,500.00} {Total
* Represents an error in math from the bid form
FUNDING ADJUSTMENTS
bers contgined within this Bid Tabulation are
Grant #1
IAP 49-14 Base minus item 9 (Bag Lifts) $1,546,729.00
Boarding Bridge Base plus Additive Bid 1 $1,744,306.00 |
= Boarding Bridges Base
July 14, 2014
- ‘ Boarding Bridge Base plus Additive Bid 1 &2 $1,858,917.00
Doug Hambrecht, P.E. THE H_E4 i Grant #2
THE LPA GROUP INCORPORATED GROUP === {Bag Lifts B-1, B-2, B-3, and B-5 (item 9) $139,721.00}
TRANSPORTATION CONSULTANTS:
AUon of Michoe! Boker
7/14/2014 BOARDING BRIDGES AND BAG LIFTS- Bid Tab.xIsx