READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 27, 2013 — Proposed Amendment 4 — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 186-Proposed Amendment 4.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Okaloosa County
Marler Park Improvements Project
Mitigation Plan, Maintenance, and Monitoring Scope and Fees
March 6, 2013
Atkins is pleased to provide you with the proposal and related fee estimate for the Marler Park
property located in Okaloosa County, Florida. ATKINS will conduct additional mitigation activities as
required by The U.S. Army Corps of Engineers (USACE) and will follow USACE mitigation guidelines for
the Marler Park Improvements Project. These activities include conducting preparing a mitigation
plan, mitigation construction oversight, mitigation maintenance oversight and mitigation monitoring.
Environmental Services for the Marler Park Improvements Project will include the following
individual subtask items:
TASK 1: ATKINS will prepare a Final mitigation plan consistent with the USACE’s Mitigation Plan
Guidelines. ATKINS will design plans for a proposed mitigation area necessary to compensate for
wetland impacts associated with the Marler Park Improvements project. ATKINS will compile
baseline data (including physical data, historic and existing land uses, and resources impacted) for the
proposed mitigation area. ATKINS will compile a mitigation work plan which may include compiling a
grading plan, planting plan, and/or wetland restoration plan. This includes the preparation of GIS
exhibits and figures as needed for a proposed mitigation plan. The Atkins engineer will compose
permit drawings and renderings for the mitigation plan. ATKINS will conduct additional agency
coordination and negotiation with the USACE to address any mitigation plan comments or issues by
the permit reviewer. This coordination includes meetings, conference calls, and ongoing negotiation
related to Marler Park Improvements Project.
Task 2: Atkins will perform mitigation construction oversight. An ATKINS biologist will be onsite
during the mitigation construction to assist the contractor with any environmental questions or issues
during any earthwork and planting activities. The Atkins representative will coordinate with the
USACE if any environmental issues arise.
Task 3: ATKINS will perform oversight during any maintenance events (if necessary) in order to assist
the County in keeping the mitigation area within compliance with the USACE. ATKINS will also
perform and complete up to three (3) yearly monitoring events which includes three field visits,
qualitative and quantitative data collection, photographs, etc. The data will be compiled into yearly
monitoring reports and submitted to the USACE.
Task 4: Additional Survey (Southeastern Surveying, LLC)
Additional Services
This scope does not include state and federal listed species surveys, consultations, permitting,
monitoring, or management plans. This scope does not include an environmental assessment, which
is typically completed by the USACE based on project submittals (for NEPA compliance). This scope
does not include re‐planting coordination or additional permitting activities if the USACE finds the
mitigation area to not be in compliance after three years. These items can be added as additional
services if required.
Deliverables
Deliverables provided at the conclusion of the work proposed above shall include the following:
1
Task 1: Final Mitigation Plan (Based on USACE Permit Conditions)
Task 3: Mitigation Monitoring Reports (3 years monitoring=3 annual reports)
SCHEDULE
ATKINS is prepared to begin work on this assignment with the receipt of the notice to proceed. We
understand that the results of our investigation need to be provided as quickly as possible after our
NTP.
FEE PROPOSAL
Task 1: Mitigation Plan (Based on USACE Permit Conditions) $2877
Task 2: Mitigation Construction Oversight $2976
Task 3: Mitigation Maintenance Oversight/
Monitoring Events/Reports (3 reports=3 years) $7825
Task 4: Additional Survey $400
____________
Total $14,078
Assuming that the attached terms and conditions are agreeable to you, we shall await your contract
for services and notice to proceed. We appreciate this opportunity to submit our proposal.
If you are in agreement with this proposal, please sign below and return a copy for my files. Please
contact me at 850‐478‐9844 should you have any questions.
Sincerely,
Kevin M. Morgan, P.E.
Senior Engineer II
Atkins
2
