quotes/bids from contractors to perform the
above-mentioned work. The lowest quote that the Developer has received
is attached as Exhibit “B”, for $94,573.00. The Developer attests that this
is the lowest qualified bidder meeting specifications. The Developer shall
oversee the scope of work listed in the proposal for the work listed in
Section 2(c) and pay the contractor upon satisfactory completion of the
work and inspection by the County. The Developer assumes all the risk of
any potential change orders related to this scope of work listed in Section
2(c) and Exhibit “B”.
The Developer shall warranty the worked described in Section 2(b) for a
period of one year, beginning after the County inspects the work and issues
2
(f)
(g)
(h)
a letter of acceptance. The County shall take ownership of this
infrastructure upon the letter of acceptance.
The Developer, or his Engineer, will provide to the County an easement
survey for the County to utilize in obtaining a Grant of Easement from
Eglin for the ownership, operation, and maintenance of the lift station and
force main. The survey shall be signed and sealed by a registered Florida
land surveyor and shall include a metes and bounds legal description.
The Developer agrees to provide the County access to the lift station and
force main for the purposes of construction, operation, and maintenance.
The Developer agrees to grant the County an easement for the purposes of
construction, operation, and maintenance of the lift station contemplated
hereby.
Section 4.__Obligations of the County.
(a)
(b)
(c)
(d)
(e)
Upon the work listed in Section 2(c) passing inspection by the County, the
County shall make a payment to the Developer in the amount of $12,716
(amount in Section 2(d) minus the amount in Section 2(b)).
The County will procure and install the remaining components of the lift
station (less time-critical), sized for an additional 61,000 GPD ADF: two
pumps with guiderails, plumbing (piping, fittings, and valves) from the
pumps to 5’ outside the proposed valve box location, wetwell interior
coating, motor control center, all other electrical appurtenances, and
sitework (grading around lift station, concrete slab/drive, fence, etc).
Infrastructure shall be installed per County standards.
The County will be responsible for submitting and obtaining a Grant of
Easement from Eglin for the lift station and force main.
Upon completion of lift station construction, the County will produce as-
built drawings and perform a start-up in coordination with the Developer’s
Engineer-of-Record. The County will own, operate, and maintain the lift
station and force main; this includes paying the ongoing meter fees for the
operation of the lift station. The County will inspect and accept the force
main per standard County procedures.
The County will be responsible for designing, permitting, and constructing
the gravity sewer main from the upsized lift station to the property to the
3
east. Said construction of the gravity sewer main from the junction
manhole to the Highway 98 Right-of-Way will occur before the
Developer’s contractor installs the water main and force main in this
vicinity along the eastern property line.
Section 5. Effective Date and Term of Agreement. This Agreement shall be
effective upon the execution by all parties and shall remain in effect for the life of the
lift station.
WHEREFORE, the parties to this Agreement hereto have executed the same on
the day and year set out above.
Approved as to form: OKALOOSA COUNTY, FLORIDA
By:
COUNTY ATTORNEY Don R. Amunds, Chairman
Board of County Commissioners
ATTEST:
Clerk of the Circuit Court
Signed, sealed and delivered EMERALD BREEZE RESORT GROUP,
in the presencedf: By EmecAto Qreeze Hosp 4 4, eu
lp L . By: Tr hres (ele Boe
itn Managing Member
THs Presi feat
STATE OF FLORIDA
COUNTY OF &symby
The foregoing instrument was acknowledged before me. this _/ ¢ day of
August , 2013, by Marlin Butler , as Hesident of
MERALD BREEZE RESORT GROUP, LLC, on behalf of the corporation, who is
personally known to me,/ or has _ produced as
identification.
bony suo Coulen
Notary Public, State of Florida ©
My Commission Expires: 4/3/201¢
Commission No.:
DEBORAH SUE BAXLEY
MY COMMISSION # DD 987792
<= _ EXPIRES: September 3, 2014
Bonded Thru Notary Public Underwriters
DEVELOPMENT AGREEMENT
This Development Agreement (the “Agreement”) is entered into this day
of , 2013, by and between OKALOOSA COUNTY BOARD OF
COUNTY COMMISSIONERS, a political subdivision of the State of Florida (the
"County"), and EMERALD BREEZE RESORT GROUP, LLC (the “Developer”).
RECITALS
WHEREAS, the Developer has an Okaloosa County Development Order, dated
September 7, 2012, to construct the project “Emerald Breeze” (the “Project”), which
generally consists of two hotels and one restaurant; and
WHEREAS, the parcel for the Project is owned by Eglin Air Force Base
(“Eglin”), and the Developer and Eglin have previously entered into a 50-year Enhanced
Use Lease (“EUL”); and
WHEREAS, as part of the Project, the Developer is constructing a wastewater
collection system, to be connected to the County’s existing wastewater collection
system on Okaloosa Island. The Developer’s wastewater collection system can
generally be described as the following: gravity sewer system (piping and manholes), a
lift station, and a force main. The Developer is already under contract with a contractor
to construct the Project. See Exhibit “A” for the legal description of the Project; and
WHEREAS, the County believes in regional wastewater planning and
coordination with developers, as per Section 8.2 of the Okaloosa County Water &
Sewer Standard Specifications and Design Manual, as adopted by the County in June
2007.
WHEREAS, the County’s existing wastewater collection system on Okaloosa
Island is at capacity in certain locations; in particular, the 10” gravity sewer main on the
north side of Highway 98 does not have enough capacity during peak flow periods; and
WHEREAS, the County desires to continue an excellent level of service for its
customers at the lowest possible cost. To do this specifically, the County desires to
upsize the Project’s lift station to accommodate additional existing wastewater flow
from County customers to the east, and to construct it to County standards; and
WHEREAS, subject to the terms and conditions set forth below, the parties
desire to work collaboratively to establish a cost share agreement for the construction of
1
an upsized lift station. With the upsize, the lift station and force main are to be owned,
operated, and maintained by the County.
NOW THEREFORE, in consideration of the foregoing and the mutual
obligations set forth below, the parties, intending to be legally bound, agree as follows:
Section 1. Recitals. The foregoing recitals are true and are incorporated as
essential terms of this Agreement.
Section 2. Obligations of the Developer.
(a)
(b)
(d)
The construction within the Project shall be governed by the conditions in
the Development Order and any revised construction plans that are
subsequently approved by the County. The Developer shall construct the
Project’s infrastructure at his expense, including the gravity sewer and
force main, but excluding the lift station (outlined below). The Developer
will be fully responsible for getting 230V 3-phase power to the lift station.
The Developer maintains that the value of the current proposed lift station,
sized for the Project only and privately-maintained, is $81,857.00.
The Developer will hire a contractor to construct certain time-critical
components of the lift station, sized for an additional 61,000 gallons per
day (GPD) of average daily flow (ADF): a concrete wetwell (with lid and
hatch openings) with exterior coating, junction manhole (with exterior
coating) just outside the wetwell, and one section of 12” PVC pipe between
the manhole and wetwell. Before this infrastructure is installed, shop
drawings shall be approved by the County. Infrastructure shall be installed
per County standards and inspected by the County.
The Developer has obtained quotes/bids from contractors to perform the
above-mentioned work. The lowest quote that the Developer has received
is attached as Exhibit “B”, for $94,573.00. The Developer attests that this
is the lowest qualified bidder meeting specifications. The Developer shall
oversee the scope of work listed in the proposal for the work listed in
Section 2(c) and pay the contractor upon satisfactory completion of the
work and inspection by the County. The Developer assumes all the risk of
any potential change orders related to this scope of work listed in Section
2(c) and Exhibit “B”.
The Developer shall warranty the worked described in Section 2(b) for a
period of one year, beginning after the County inspects the work and issues
2
(f)
(g)
(h)
a letter of acceptance. The County shall take ownership of this
infrastructure upon the letter of acceptance.
The Developer, or his Engineer, will provide to the County an easement
survey for the County to utilize in obtaining a Grant of Easement from
Eglin for the ownership, operation, and maintenance of the lift station and
force main. The survey shall be signed and sealed by a registered Florida
land surveyor and shall include a metes and bounds legal description.
The Developer agrees to provide the County access to the lift station and
force main for the purposes of construction, operation, and maintenance.
The Developer agrees to grant the County an easement for the purposes of
construction, operation, and maintenance of the lift station contemplated
hereby.
Section 4. Obligations of the County.
(a)
(b)
(c)
(d)
(e)
Upon the work listed in Section 2(c) passing inspection by the County, the
County shall make a payment to the Developer in the amount of $12,716
(amount in Section 2(d) minus the amount in Section 2(b)).
The County will procure and install the remaining components of the lift
station (less time-critical), sized for an additional 61,000 GPD ADF: two
pumps with guiderails, plumbing (piping, fittings, and valves) from the
pumps to 5’ outside the proposed valve box location, wetwell interior
coating, motor control center, all other electrical appurtenances, and
sitework (grading around lift station, concrete slab/drive, fence, etc).
Infrastructure shall be installed per County standards.
The County will be responsible for submitting and obtaining a Grant of
Easement from Eglin for the lift station and force main.
Upon completion of lift station construction, the County will produce as-
built drawings and perform a start-up in coordination with the Developer’s
Engineer-of-Record. The County will own, operate, and maintain the lift
station and force main; this includes paying the ongoing meter fees for the
operation of the lift station. The County will inspect and accept the force
main per standard County procedures.
The County will be responsible for designing, permitting, and constructing
the gravity sewer main from the upsized lift station to the property to the
3
east. Said construction of the gravity sewer main from the junction
manhole to the Highway 98 Right-of-Way will occur before the
Developer’s contractor installs the water main and force main in this
vicinity along the eastern property line.
Section 5. Effective Date and Term of Agreement. This Agreement shall be
effective upon the execution by all parties and shall remain in effect for the life of the
lift station.
WHEREFORE, the parties to this Agreement hereto have executed the same on
the day and year set out above.
Approved as to form: OKALOOSA COUNTY, FLORIDA
By:
COUNTY ATTORNEY Don R. Amunds, Chairman
Board of County Commissioners
ATTEST:
Clerk of the Circuit Court
Signed, sealed and delivered EMERALD BREEZE RESORT GROUP,
LLC
in the presence of: By Emerato Breeze Hosp: talib , ee.
By: nares Utes Tne
ene Managing Member
LM Me By