READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 11-22-05 ‎(regular)‎ — reading text

Part 6 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-10113-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

CLERK r~ o 0 CITY COUNCIL MEETING November 22, 2005 Consent Agenda Request authorization to award bid for Electrical Upgrade for Well 11 , to Control Systems and Instrumentation of Pensacola, FL in the amount of 76, 120 Purchasing Director) ( Utilities Director) Council Action 1st 2nd Vote: CA- 2 Agenda Item Number: o o crTY OF FORT WALTON BEACH MEMORANDUM DATE: November 14, 2005 TO: Joyce Shanahan, City Manager FROM: John Hofstad, Utilities Director SUBJECT: to award Bid No. 06- 102, Electrical Upgrade for Well 11. Request SUMMARY Pursuant to Chapter 2, Purchasing policies and procedures, Fort Section 2- 266, Walton Beach Code of Ordinances, request authorization to award Bid No. 06- 102, Electrical Upgrade for Well 11, to the lowest responsive, responsible bidder, Control Systems and Instrumentation of Pensacola, Florida, for the bid amount of $ 76, 120. available in Account No. 401- 8026- 533- 6997, Ifapproved, sufficient funds are Utilities, Special Projects, Well Maintenance Program, in the amount of 86, 870. Recommend the Council approve the bid received from, Control Systems and City Instrumentation of Pensacola, Florida, for a total cost of $ 76, 120. 00. FIN A N C I A L D A T A l.DEPARTMENT: Util~ties 2. DIVISION: Water Operations 3. FUND: Utilities Enterprise Fund 4. ACCOUNT 401- 8026- 533- 6997 5. ACCT. DESCRIPTION: Well Maintenance Program 6. FY BUDGET: 2005/ 06 7. AMOUNT BUDGETED: $ 86, 870 8. GRANT FUNDS: YES NO X AMOUNT 9. FUND TRANSFER: YES NO X AMOUNT 10. FROM ACCT: N/ A ll.TO ACCT: N/ A 12. REASON FUNDS AVAILABLE FOR TRANSFER: N/ A 13. PRICE ANALYSIS: ATTACHED X ADD' L MAT FDR NONE BID I T E M D A T A 14. DESCRIPTION OF BID ITEM:* Provide install and program a motor control center to control 3 motors, construct a mounting pad for 200KW generator, install an auto a new power transfer switch, and other work as described in bid specifications. 15. SUPPLEMENTAL MATERIAL: ATTACHED X ADD' L MAT FDR NONE 16. # BID INVITATIONS SENT: 23 17. # BIDS RECEIVED: 2 18. # RESPONSIVE BIDS: 2 Cf\ ~ 7/ o FL 19. RECOMMENDED VENDOR: Control Systems and Instrumentation of Pensacola, 20. BID AWARD AMOUNT: $ 76, 120. 00 21. COMMENTS: * 22. ESTIMATED QUANTITY TO BE PURCHASED ( BULK ITEMS): N/ A 23. ESTIMATED PURCHASE AMOUNT: N/ A 24. BID TABULATION ATTACHED: YES X NO ADD' L MAT FDR 25. TERM OF CONTRACT: N/ A 26. BID VALID TO: 60- Days January 7, 2006 27. BID PRICE VALID FOR TERM OF CONTRACT: YES X NO 28. WARRANTY PERIOD: 12 Months 29. DELIVERY TIME: 120 days 30. STATE CONTRACT: YES NO X 31. CONTRACT #: N/ A 32. CO- OP PURCHASE: YES NO X 33. AGENCY: N/ A 34. EXPECTED LIFE OF ITEM: 10+ Years. 35. ITEM DEMO' D: YES NO X 36. REFERENCES CHECKED: YES NO N/ A 37. CONTRACT: ATTACHED YES NO ADD' L MAT FDR N/ A 38. CONTRACT APPROVED FOR LEGAL SUFFICIENCY: YES NO N/ A 39. CURRENT VENDOR: N/ A 40. CURRENT PRICE: N/ A REPORT PREPARED BY: y-~- Date REVIEWED & SUBMITTED BY: 1-/ 9'- 6S- Date REVIEWED AND CONCUR: JlIIIp' O~ Date COMMENTS: o o ATTACHMENT 1 BID SUMMARY COMMENTS Electrical Upgrade for Well 11 The following comments relate to the "*,, items in numerical order indicated on the Bid Award Summary Memorandum. 14. OUTLINE OF BID ITEM: 1. Provide an Bradley Motor Control Center ( MCC) with a Allen Programmable Logic Controller ( PLC) and three ( 3) Smart Motor Controler, SMC- Plus Bulletin 150. 2. Construct concrete mounting pad for a 200KW Kaytolight generator according to Kaytolight' s specifications ( approximately 20 x 20) Generator Provided by the City) 3. Provide labor and materials for the installation of an auto power transfer switch ( ASCO provided by the City) 7000 4. Installation of all applicable conduits and wiring from generator to auto transfer switch and from the transfer switch to the MCC including wet- sawing concrete floors and core drilling the wall for the conduits. 5. Provide labor for the removing of all old motor control equipment. 6. Provide labor and materials for constructing house keeping pad for the new MCC. 7. Provide labor and materials for the installation of the Motor Control Center and all necessary wiring. 8. Install a pressure transmitter including all necessary piping and wiring. 9. Provide labor and materials for interfacing with SCADA system Dataflow TAC II) 10. Provide programming of PLC and Human Machine Interface. The new PLC will control both the well motor and two high service pumps. A 4- 20mA- transducer shall be installed to monitor the water level of the level tank and this input will be used by the PLC ground storage to determine the need to turn on and off the well motor. The existing 4- 20mA- transducer that monitors line pressure will be used by the PLC to determine the need to turn on and off the service pumps. Any time a service pump starts the PLC will energize a contact to turn on the chlorine booster pump starter. The PLC will monitor the high and low chlorine vacuum contacts and shut the chlorine booster pump and service pumps off in the event of an alarm. 11. Provide training to City personnel on operation and maintenance of the PLC. 12. Provide as built drawings and operation and maintenance manuals. 21. COMMENTS: 1. The Well 11 treatment plant provides 30% of the city' s drinking water this project will upgrade all major electrical controls and provide for automatic transfer to backup

Download this text file with its original spacing ↓