READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 11-22-05 (regular) — reading text
Part 43 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10113-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Owner has applied for and the City has approved a City of Fort Walton Beach Matching
Streetscape Grant. Therefore, this Agreement shall be construed in accordance with the City of
Fort Walton Beach Matching Streetscape Grant documents and procedures, a copy of which
Owner hereby acknowledge receipt. Such Grant and procedures allows and requires Owner to
o o
construct, maintain and service streetscape improvements,
including but not limited to, placing
landscape materials, pavers, tree grates, irrigation systems, benches, trash bollards,
receptacles,
decorative light fixtures and associated electrical wiring, and overhead utilities
underground, and
constructing sidewalks.
5. Improvement Plan.
Owner has submitted and City has approved a plan for the
specific improvements to be
made to the Project Area. Such specifications are attached as Exhibit " B" and into
incorporated
this Agreement by reference.
6. Expense of Improvements.
Owners shall install the improvements as described in Exhibit " B" at its sole
expense.
7. Service & Maintenance of Improvements.
Owner shall at all times construct said improvements, and service and maintain the
Project Area, in a reasonable manner, and with due care, in accordance with all applicable State
and City guidelines, standards and procedures.
8. Ownership and City' s Right to Enforcement.
The parties agree that the City shall have the
following rights:
a. At the City' s discretion, the City may periodically
r'i~
inspect the Project Area to
ensure compliance with the letter and intent of this Agreement. If the City determines that Owner
are not properly
servicing and maintaining the Project Area or are otherwise not in conformance
with State and City laws, ordinances, procedures and guidelines, die
City may perform any
necessary service or maintenance, without prior notice to the Owner, and charge the cost thereof
to the Owners.
b. The City, at its sole discretion, may require Owners to remove, relocate, or
adjust
the improvements in the Project Area. Such requirement
may be necessary to meet public
benefit, planning or any future needs of the City. In such event, the
City shall give Owner at least
sixty ( 60) days written notice regarding such need and the requirement for removal, relocation or
adjustment. Owner then shall be allowed at least sixty (60) days to meet the requirements as
described by the City. If Owner do not satisfy the requirements of the City, then the
City may
satisfy such requirements and charge the cost thereof to the Owner.
c. Upon placement of any improvement in the public right- of-way, the City shall
have exclusive ownership of such improvement.
9. Termination.
This agreement may be terminated by joint written consent of the parties.
10. Recordation.
Owner shall at its sole expense, properly record this Agreement and the applicable
Easement in the Public Records of Okaloosa County, Florida.
2
o o
11. Covenant Running with Land.
The parties agree that this Agreement is a covenant
running with the land for the Owner' s
described property and shall bind Owner, its heirs, successors and
assigns.
12. Sovereign Immunity/ Credit Power.
Nothing herein shall be deemed to be a waiver by the City of its rights to sovereign
immunity or as a pledge or use of the City' s taxing power or credit.
Witnesses: Owner: BCB Holdings, LLC
By:
A. Anthony Hughes, Registered Agent
Print Name
Print Name
This document was acknowledged and executed before me on
2005, by A. Anthony Hughes, Registered Agent, BCB
Holdings, LLC.
Notary Public
Personally known
Produced Identification:
Attest: City of Fort Walton Beach, Florida
By:
Helen A. Spencer, City Clerk Mayor Mike Anderson
This document was acknowledged and executed on 2005, by
Mike Anderson and Helen Spencer, in their representative capacity as the City
Mayor and the
City Clerk, in the name of the City of Fort Walton Beach, Florida.
Notary Public
3
OIL~~~ l~:lb t:
I:I~t:
I-'-': lLt: It:I UUI rl W~ LI~~ D~~ wM r-~\:
Jt:. I:
J-'
o o
EXffiBIT " A'"
HIGHWAY LANDSCAPE MAINTENANCE MEMORANDUM OF AGREEMENT
THIS AGREEMENT, made and entcred into on this t #
day of JaI1 v t'
vt-'
d- '
20 113, by and between the 51 ATE OF FLORIDA DEPARTMENT OF TRANSPORTArION,
a com.
ponent agency of the State of Florida, hereinafter caUed the " Department" and FORT
WALTON BEACa, FLORIDA, a political subdivision of the State of Florida,
existing under the
Laws of Florida, hereinafter called the UCity,"
WITNESSETH
WHEREAS, the Department owns State Road 85 in Okaloosa County; Florida right. of..
way between Mile Post . 650 and Mile Post . 678 in Oka}oosa County, Florida, and more
specifically for this Agreement the " Project Highway Area" will be that area located between the
east curb of State Road 85 and the east side of the State Road 85 right- or-way located between
Mile Post .650 and Mile Post . 678 in Okaloosa County, Florida; and
WHEREAS, the Department and the City are of the opinion that the Proj~ t Highway
Area should have the sidewalk replaced, necessary to improve and enhance the aesthetic quality
of the Project Highway Area; and
WHEREAS, the City shall maintain the Project Highway Area by perfonning litter
removal and sidewalk maintenance.
NOW THEREFORE, for and in consideration of the mutual benefits that flow each to. the
other, the parties covenant and agree as follows:
1. Until such time as the improvements are removed fro~ the Project Highway
Area, pursua~ t to Paragraphs 3 and 5 hereof, the City shall at an times maintain the Project
Highway Area in a reasonable manner and with due care in accordance with all applicable
Department g~idelines, standards and procedurcs. SpecificaUY, the City agrees to maintain the
public sidewalk and keep the litter removed from the Project Highway Nea.
2. Maintenance of the Project Highway Area shall be subject to periodic inspections
by the Depa~ ment. In the event that any of the aforementioned responsibilities are not carried
out or are otherwise determined by the Department to be not in conformance with the
Department, in addition to its right of tcnnination under Paragraph 4( a), may, at its option,
3
l/~b/~~~~ !~: lb t::
I::!tl1j~~' j~t::
I1j VUI ~ I W~ LIUN ~~~~ H r-~
l:
I~ t:Jq
o
perfonn any necessary maintenance without need of any prior notice and charge the cost thereof
to the City.
3. It is understood between the parties hereto that any or aU of the improvements in
the Project Highway Area may be removed, relocated or adjusted at any time in the future as
determined to be necessary by the Department in order that the adjacent state road
may be
widened, altered ox: otherwise changed to meet with the future criteria or planning of the
Department. The City shall be given notice regarding such removal. relocation or adjustment
and shall be allowed sixty ( 60) days to remove all or part of the improvements in the
Project
Highway Area at its own cost. The City will own that part of the improvements it removes from
the Project Highway Area. After the sixty ( 60) day removal
period, if the City has not
