READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-09-09 regular — reading text
Part 23 of 45. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-22874-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
STATE OF FLORIDA
COUNTY OF OKALOOSA
This instrument was acknowledged before me this day of
2009 by Mike Anderson as Mayor, and Helen Spencer, as City Clerk, for the City of Fort
Walton Beach, a political subdivision. They are personally known to me or have
produced as identification.
Signature of Notary
Name of Notary typed, printed or stamped
15-
Approved as to form:
OKALOOSA COUNTY, FLORIDA
M
Attorney for Okaloosa County William J. Roberts, III, Chairman
ATTEST:
Clerk of Okaloosa County
STATE OF FLORIDA
COUNTY OF OKALOOSA
This instrument was 2009 by William J. Roberts, the State of Florida, and
Commissioners. He /she acknowledged before me this day of III on
behalf of Okaloosa County, a political subdivision of as Chairman of the Okaloosa
County Board of County is personally known to me or has produced
as identification.
Signature of person taking notary
Name of notary typed, printed or stamped
16-
00
NN
nn
NN
AmAm
00
ryry
GG
7 m
btj
o
2 3H1A' 1 NI121V
UZO v o
z
N o li
pp
Z d a t m
Wya
LL W w $ Wo=
fix y
U a E Eo m
Q
i hz a m8
s
a
Q 4f
m W
m
O ;
cQ
Z 3!
Q H ca
J
O 3
J L
a
Q C
3 r
V F- 0
C O co LL v a
L d
vi o0
A+
LL
J o
Appendix C
List of Displace City of Ft. Walton Beach Employees, with
Position Titles
Joseph Jones Class " A" Wastewater Superintendent
Larry Kilburn Class " B" Wastewater Supervisor
Dan Enfield Class " C" Operator
James Brown Class " C" Operator
Bruce Burford Class " C" Operator
Dean Crane Class " C" Operator
Danon Austin Class " C" Operator
Melissa Woodall Class " C" Laboratory Manager
r-
l"—
Luz
cl
jg,
CL u ca
C0:
0 0. 44
IS g Zo
W Z;
0_ 0
Ol
4
rl*" tq
41 Ul 5
0
0
LO LU a
CK; 6
N
T3
F
W
C
0
z
z
z
at
am
LLJ
j ra
LL
C, 0
cr
CL a tA
co
6 to
a, j
Z f, v ir
01,
Wn
0 14 vJ cl) 14 -W ' A L? ci
2 i 0 ".) . c m M
8
0 cz 5
i fl
di
m IN
41
01 0) E
n
wi L3 - C3 C' l- 282' S
x:i o w v4 w w In ol Vn w UI V Ln 41 i
CL
FOVALI
are
mom
CL
140
0
Am
w
rp
tll*m
411 a,
ZV Ii") In In " P 10 ta zl U-1 All 0 r-
Lf)
C104
uj
z
OMMO
z
z t, M
4A
aC tw
Ll.
Cr.
CL U4
Z
Z
z : ui
APPENDIX E ARBENNIE PRITCHETT WRF
Appendix E - The Arbennie Pritchett Water
Reclamation Facility
Okaloosa County is implementing a $ 65M program to construct the new 10 million gallon
per day (mgd) Arbennie Pritchett Water Reclamation Facility (WRF) that will replace the
aging Garniers Wastewater Treatment Plant (WWTP). The new WRF will provide new and
improved technology, will have the capacity to serve a larger service area, will provide
enhanced operational performance, and will remove the existing Garniers WWTP from the
ever increasing residential congestion at its current location. The new WRF is under
construction at the existing Garniers spray field property that is located on Eglin Air Force
Base (AFB) property that is leased from the Air Force for this use. Construction is expected
to be completed in September 2009.
This program includes several elements
Design -Build of the 10 mgd Arbennie Pritchett WRF
Design and Construction of the 25 mgd Garniers Re -pump Station
Design and Construction of 200 acres of rapid infiltration basins ( RIBs)
Design and Construction of "tie -ins" and new piping and valves to convert 2 -20 -inch
diameter reclaimed water force mains to raw sewer mains
Design and Construction of new 36 -inch diameter raw sewer force main to the new
Arbennie Pritchett WRF
The new WRF will be designed to treat an influent average daily flow of 10 mgd and a peak
hourly flow of 25 mgd, based on USEPA Class 1 Reliability Requirements. Provisions for
future expansion to 15 mgd and 37.5 mgd respectively, have been incorporated in the
design and construction of the headworks, ultra -violet light (UV) disinfection, and effluent
pumping facilities. The new WRF will consist of four major process areas and support
facilities as described below:
Pretreatment Process
Biological Treatment Process
Effluent Management
Biosolids Management
Support Facilities
Pretreatment Process
The pretreatment processes are intended to provide gross removal of large solids and grit to
protect downstream equipment. Pretreatment process components consist influent flow
monitoring, influent composite sampling, mechanical and manual screening, screenings
washing and dewatering equipment, grit removal and handling equipment, odor control, and
septage receiving equipment. The pretreatment facilities have been designed and
constructed to provide complete redundancy and have the hydraulic capacity to meet an
average daily flow of 15 mgd and the future peak hourly flow of 37. 5 mgd.
Biological Treatment Process
The biological treatment process is intended to remove or reduce organic constituents,
nutrients, and suspended solids from the wastewater. Treatment includes activated sludge
bioreactors, secondary clarification, and return activated sludge ( RAS) and waste activated
sludge (WAS) pumping. The process is designed and constructed to meet the influent
loadings based on an average daily flow of 10 mgd and the future peak hourly flow of 25
mgd.
The activated sludge bioreactor system is furnished to provide necessary biological
treatment of the wastewater to meet permit conditions, and is designed to reduce
carbonaceous biochemical oxygen demand ( CBOD), ammonia, nitrite, and nitrate to the
prescribed effluent treatment levels,
