READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-09-09 regular — reading text
Part 21 of 45. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-22874-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
regulations in relation to the ground water monitoring
within the City's Service Area, and such violation is not the result of violations of
Florida law and regulations relating to the quality of water discharged from the
effluent filtration system,
then the City shall hold the County harmless from any cost
relating to that failure to comply.
SECTION 7. COLLECTION SYSTEM FACILITIES.
The City, at its own expense shall design, permit, construct and operate the
City' s Collection System, including any required pumping stations, force mains, and
appurtenant facilities up to the Point of Connections to the County's wastewater
facilities. All facilities shall be designed, permitted, and constructed in conformance
with all applicable local, state, and federal laws permits, rules, and regulations.
SECTION 8. POINT OF CONNECTION.
The point or points of connection to the County's raw wastewater influent
mains and reclaimed water mains shall be determined and approved by the County
after consultation with the City ( "Points of Connection "). The Points of Connection
shall be determined as the actual physical location of the connection to the County's
in
existing main( s). The actual tap connection to the County's raw wastewater influent
mains and the reclaimed water mains will be constructed by the County. All costs
related to providing the interconnection from the City' s existing wastewater mains to
the County's raw wastewater influent mains shall be paid by the County. All of the
costs of the Point of Connection between the County' s reclaimed water mains and
the City's Reclaimed Distribution System, excluding the cost of labor provided by
County employees, shall be the responsibility of the City. The County shall invoice
the City for the costs of the Points of Connection between the County's reclaimed
water mains and the City's Reclaimed Distribution System and will make
documentation available to the City for its review demonstrating the cost incurred.
The County shall own the Points of Connection and be responsible for any
maintenance thereof
SECTION 9. METER INSTALLATION AND TESTING.
A) The County shall construct, install, maintain, and have calibrated, at least
annually, a master magnetic flow meter at each Point of Connection to automatically
measure and record the total flow conveyed from or to the City, as described elsewhere
in this Agreement.
B) The County shall pay the cost of the installation of a magnetic flow meter
on the force main connection between the City's system and the County's influent main
to measure and record the total flow discharged from the City Service Area into the
APWRF. The County shall pay for cost of this annual certification of the accuracy of the
meter at each Point of Connection by a meter factory certified contractor. The meter
readings and calibration reports shall be provided to the City after review by the County
within thirty ( 30) days of receipt of meter certification.
C) The City shall have the right, upon written request to the County, to have
such metering device tested by a meter factory certified contractor in the presence of an
authorized and qualified representative of the City. If, as a result of such test, such
meter or meters shall be found to be within three percent ( ±3 %) of the accurate or true
reading, then the costs of such test shall be paid by the City, but otherwise the cost
shall be paid by the County. Should any test show such meter to be substantially
inaccurate, then all monthly bills for the prior six ( 6) months from that testing or the date
of the last annual certification of accuracy by the County, which ever is less, ( the
Reimbursement Period ") shall be adjusted to reflect the accurate rate. A variation in
excess of three percent ( 3 %) shall be deemed to represent a result or reading which is
substantially inaccurate. Such adjustment shall be made if the testing reflects either an
underpayment or overpayment by the City and all monthly bills within the
Reimbursement Period shall be adjusted accordingly. Where the difference between the
testing and the rate charge is found to be substantially inaccurate, the City shall pay to
the County or receive from the County the difference between the wastewater bills
invoiced during the Reimbursement Period and the recomputed wastewater bills for that
period. Such differences shall be paid within thirty (30) days of the adjustment.
7-
SECTION 10. INITIATION OF SERVICE.
The County shall begin providing wastewater service to the City within thirty
30)
days after the City:
A) And the County enter into this Agreement for the lease of the Tertiary
System.
B) Provides the County with any and all easements, licenses and rights of
access necessary for the transmission of treated wastewater to the Tertiary System
currently located on City -owned property at 1564 Percy L. Coleman Road in Fort
Walton Beach, Florida; and
C) Provides the information, record drawings,
County with the permit
operation and maintenance manuals, and other pertinent information and data as
may be required for the operation and maintenance of the Tertiary System.
SECTION 11. EMPLOYMENT.
As a result of the assumption of functions by the County, the job functions of
City employees, as reflected on Appendix C will be eliminated. As part of this
Agreement, the County agrees that those employees reflected on Appendix C will
be permitted to apply for vacancies in the County system and will be treated as an
internal applicant for employment purposes for a period of one year from the date
that service is commenced under this Agreement. Once employed, these individuals
will be treated as new employees for all other employment purposes with the
County.
SECTION 12. APPROPRIATIONS; FUNDING.
The parties intend to pay for and support the obligations of this Agreement
through customer billing revenues earned from the operation of their
monthly
respective water and wastewater systems. Each party shall have the right to pursue
any other means of financing available to it, including but not limited to bonds,
reserve funds, and grants or other assistance funds from the US government or the
State of Florida.
SECTION 13. TERMINATION, DEFAULT, DISPUTE RESOLUTION.
A) This Agreement may only be terminated by notice to and the written
consent of both parties. Either party may provide written notice of its intent to
terminate this agreement; provided, however, this Agreement may not be
either by either the City or the County, while Bonds of the City insured
terminated,
by Ambac Assurance, Inc. are outstanding in the hands of the holders thereof,
the has the consent by Ambac Assurance
unless City received prior written
Corporation. Upon notice and consent of termination by the parties, the parties shall
jointly determine the effective date of termination. If the parties consent to terminate
this Agreement, the parties agree that until the effective date of the termination:
1) the County will continue to receive and treat wastewater delivered
to its system through the Points of Connection, except as provided for in
subsection ( B) below;
2) the City will not add new connections to their collection system
beyond those which were physically connected as of the date the written
consent to termination was signed by the last party;
3) the City will continue to compensate the County for its services in
accordance with the provisions of this Agreement; and
4) the City and the County will continue to comply with all provisions of
this Agreement until such time as the City ceases to discharge wastewater
to the County' s system.
B) If the City fails to pay any monthly invoice from the County, and that
invoice remains unpaid for 90 days from the date of written notice of such nonpayment,
the County shall have the right to discontinue service or block the Points of Connection.
C) The County and the City agree that any disputes arising from this
Agreement, other than as stated in Section 13( B), will not be grounds for a material
disruption or cessation of service to the City Service Area. In the event of a dispute as
to amounts owed between the parties, each party shall have the right to pay to or
receive from the other party any disputed amounts without relinquishing its rights to
dispute or litigate any amounts so paid or received. The remedies indicated by this
paragraph shall be in addition to any other remedy in law or in equity that the County or
the City might have. In the event of a material breach of this Agreement which is not
cured within ninety ( 90) days following receipt of written notice of the default, then either
party may institute litigation to protect their rights under this Agreement. The prevailing
party shall be entitled to a reasonable attorney' s fee and costs of such litigation.
SECTION 14. ADDITIONAL COVENANTS.
A) Except for the services provided by the County pursuant to this
Agreement, the County covenants and agrees that the City possesses the exclusive
right to provide water and wastewater service to the City Service Area and to all
revenues produced from those services. The County shall not provide water or
wastewater service to any property within the City Service Area without the prior written
consent of the City, except for such property as may already be served by the County
on the effective date of this Agreement.
B) The City covenants and agrees that the County possesses the exclusive
M
right to provide water and wastewater service to the County Service Area and to all
revenues produced from those services. The City shall not provide water or wastewater
service to any property within the County Service Area without the prior written consent
of the County, except for such property as may already be served by the City on the
effective date of this Agreement.
C) The City shall be responsible for all costs of operation, maintenance,
repair, replacement, and any and all other costs related to the City's Wastewater
Collection System or the City's Reclaimed Distribution System and the County shall
have no responsibility therefore. The City also shall be responsible for all capital costs
replacement, and repair of the City's Collection
of construction, expansion, modification,
System as may be necessary to serve the residents of the City Service Area. The City
shall be responsible for all costs of operation, maintenance, repair, replacement and all
other cost associated with the reclaimed water system downstream of the existing
Tertiary System discharge point.
D) The County shall be responsible for all costs of operation, maintenance,
repair, replacement, and any and all other costs related to the APWRF and up to and
including the existing Tertiary System, including all associated upstream effluent piping
from the APWRF. The City shall have no responsibility therefore, except for the