READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 15, 2013 — Florida Department of Transportaion Joint Participation Agreement — reading text
Part 3 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 76-Florida Department of Transportaion Joint Participation Agreement.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Catalog of State Financial Assistance (CSFA)
title and number, award number and year, and name of the state agency awarding it.
PART III: OTHER AUDIT REQUIREMENTS
The recipient shall follow up and take corrective action on audit findings. Preparation of a
summary schedule of prior year audit findings, including corrective action and current status of
the audit findings is required. Current year audit findings require corrective action and status of
findings.
Records related to unresolved audit findings, appeals, or litigation shall be retained until the
action is completed or the dispute is resolved. Access to project records and audit work papers
shall be given to the FDOT, the Department of Financial Services, and the Auditor General.
This section does not limit the authority of the DEPARTMENT to conduct or arrange for the
conduct of additional audits or evaluations of state financial assistance or limit the authority of
any other state official.
PART IV: REPORT SUBMISSION
1. Copies of reporting packages for audits conducted in accordance with OMB Circular A-
133 as revised, and required by PART I of this Agreement shall be submitted, when
Required by Section .320 (d), OMB Circular A-133, as revised, by or on behalf of the
Recipient directly to each of the following:
A. The DEPARTMENT at each of the following addresses:
Florida Department of Transportation
Production Management
1074 Highway 90
Chipley, FL, 32428
B. The Federal Audit Clearinghouse designated in OMB Circular A-133, as revised
(the Number of copies required by Sections .320 (d)(1) and (2), OMB Circular A-
133, as Revised, should be submitted to the Federal Audit Clearinghouse), at the
9
following address:
Federal Audit Clearinghouse
Bureau of the Census
1201 East 10th Street
Jeffersonville, IN 47132
C. Other Federal agencies and pass-through entities in accordance with Sections .320
(e) and (f), OMB Circular A-133, as revised.
2. In the event that a copy of the reporting package for an audit required by PART I of this
agreement and conducted in accordance with OMB Circular A-133, as revised, is not
required to be submitted to the DEPARTMENT for reasons pursuant to section .320
(e)(2), OMB Circular A-133, as revised, the recipient shall submit the required written
notification pursuant to Section .320 (e)(2) and a copy of the recipient’s audited schedule
of expenditures of Federal awards directly to each of the following:
Florida Department of Transportation
Production Management
1074 Highway 90
Chipley, FL, 32428
In addition, pursuant to Section .320 (f), OMB Circular A-133, as revised, the recipient
shall submit a copy of the reporting package described in section .320 (c), OMB Circular
A-133, as revised, and any management letters issued by the auditor, to the
DEPARTMENT at the following address:
Florida Department of Transportation
Production Management
1074 Highway 90
Chipley, FL, 32428
3. Copies of financial reporting packages required by PART II of this Agreement shall be
submitted by or on behalf of the recipient directly to each of the following:
A. The DEPARTMENT at the following address:
Florida Department of Transportation
Production Management
1074 Highway 90
Chipley, FL, 32428
B. The Auditor General’s Office at the following address:
Auditor General’s Office
Room 401, Pepper Building
10
111 West Madison Street
Tallahassee, Florida 32399-1450
4. Copies of reports or the management letter required by PART III of this Agreement shall
be submitted by or on behalf of the recipient directly to:
A. The DEPARTMENT at the following address:
Florida Department of Transportation
Production Management
1074 Highway 90
Chipley, FL, 32428
5. Any reports, management letter, or other information required to be submitted to the
DEPARTMENT pursuant to this agreement shall be submitted timely in accordance
with OMB Circular A-133, Florida Statutes, and Chapters 10.550 (local governmental
entities) or 10.650 (nonprofit and for-profit organizations), Rules of the Auditor General,
as applicable.
6. Recipients, when submitting financial reporting packages to the DEPARTMENT for
audits done in accordance with OMB Circular A-133 or Chapters 10.550 (local
governmental Entities) or 10.650 (nonprofit and for-profit organizations), Rules of the
Auditor General, should indicate the date that the reporting package was delivered to the
recipient in correspondence accompanying the reporting package.
PART V: RECORD RETENTION
The recipient shall retain sufficient records demonstrating its compliance with the terms of this
agreement for a period of at least five (5) years from the date the audit report is issued, and shall
allow the DEPARTMENT, or its designee, CFO, or Auditor General access to such records
upon request for a period of at least five (5) years from the date the audit report is issued, unless
extended in writing by the DEPARTMENT.
11
IN WITNESS WHEREOF, the COUNTY has caused this Agreement to be executed in
its behalf this _____ day of _________, 20__, by the COUNTY Official, authorized to enter into
and execute same by the COUNTY Council by Resolution Number _______ of the Council on
the ____ day of ____________, 2012, and the DEPARTMENT has executed this Agreement
through its Director of Transportation Development for District Three, Florida Department of
Transportation, on the date set forth below.
OKALOOSA COUNTY, FLORIDA
ATTEST: (SEAL) BY: __________________________
CLERK TITLE: ________________________
__________________________
COUNTYATTORNEY
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
ATTEST: (SEAL) BY:_______________________
EXECUTIVE SECRETARY DIRECTOR OF
TRANSPORTATION
DEVELOPMENT
DATE:______________________
LEGAL REVIEW:
____________________________
OFFICE OF GENERAL COUNSEL
12
Exhibit A
SCOPE OF SERVICES
FP ID: 416533-8-58-23
Okaloosa County Landscape Beautification Project
Project Description: Landscape design of State Road 85, from 690’ North of the median end
at Loblolly Drive to 795’ South of the median end at Sunset Boulevard, Okaloosa County,
Florida
Irrigation: Addition of new underground, automated, irrigation system with pump and well
water source. The system will service the above referenced project area with drip tubing on
plant material and turf spray heads for the sod areas. This includes directional boring under
HWY 85 approximately 5 times with standard casing for water and electrical lines.
Estimate = $16,110
Landscape from 690’ North of the median end at Loblolly Drive to 795’ South of the
median end at Sunset Boulevard: Addition of 8 landscape beds staggered in the median of
the above referenced project area. Each landscape bed will feature 3 Sabal Palms and 2 Crape
Myrtles for height and color tree plantings. As under plantings a mixture of Lantana, Muhly
Grass, Dwarf Oleander, and Plumbago. All of these under plantings will add a lot of low growing
color and interest under the planting of the trees. In addition, there will be 8 planting areas
located on the sides of the project area roadway with 3 Sabal Palms in each planting bed, under
planted with Bottle Brush, Oleander, and Muhly Grass. New Bermuda Sod will be installed in all
of the planting areas of the project location.
Estimate = $55,965
Summary: The project will create a “Gateway” into Okaloosa County. The planting of the Sabal
Palms, Crape Myrtle, Oleander, Dwarf Oleander, Bottle Brush, Plumbago, Lantana, and Muhly
Grass will create masses of color and interest for drivers entering and leaving our area.
Total Project Estimate = $72,075
The project design, set-backs, tree heights, etc. are subject to change pending FDOT design
approval. Proposed plantings are also subject to change during construction based on
availability, and are subject to FDOT approval.
13
Exhibit “B”
MAINTENANCE PLAN
SR 85 from North of Loblolly Drive to South of Sunset Boulevard
Okaloosa County
Maintaining the subject landscaped area both during and after completion of the project includes,
at a minimum, the following:
1. Mowing, cutting and/or trimming grass or turf within the landscaped project.
2. Fertilization of the landscaped project.
3. Weeding and edging (by means of manual, mechanical or chemical) of landscaped
project. When using herbicides, formulas, rates, methods of application, special
instructions and precautions should be applied.
4. Pruning of landscaped project in order to have healthy and vigorously growing plants
and to maintain sight clearance in areas within the landscaped project.
5. Irrigation and maintenance of equipment and any other amenities (lighting,
signage, benches, etc.).
6. A work zone traffic control plan (if necessary) for the installation and maintenance of
the landscaped project.
7. Annual replenishment of mulch materials.
8. The project shall be maintained in accordance with FDOT Design Standards 546 and
700 as well as the FDOT Maintenance Rating Program.
14
EXHIBIT - 1
The COUNTY shall comply with all requirements of Florida Statute 344.044 and Department
specifications and guidelines in constructing the before mentioned project.
FEDERAL RESOURCES Not Applicable to this agreement
STATE RESOURCES (CSFA 55.023)
Florida Department of Transportation Florida Statute 344.044
Landscape Grant Amount $100,000.00
Compliance Requirements
1. Project and/or material must be competitively bid.
2. Per Florida Statute 334.044 (26), to the extent practical, 50 percent of the funds shall be
