option of putting in pavers
instead of the brush finished concrete.
Mr. Minich questioned discussion on the boardwalk when it is an easement issue. Mr. Miller
pointed out it is subject to the design approval of the CRA on 5 September. The Mayor noted it is
not a building permit. Mr. Miller expressed he is asking about the option of pavers instead of the
brush finished concrete.
The CDS Director explained if they plan to change what the CRA approved in September, they
would have to go back to the CRA approval, and if they do not receive a DEP permit they will not
be able to get a building permit. She said all the bases are covered and it is not part of the
easement that is before Council.
Mr. Hartwell wished to know if the easement is not granted, and it is a condition of the
Development Order, if it will impact the Certificate of Occupancy.
The CDS Director replied if the easement is not granted they cannot receive a Certificate of
Occupancy based on the Development Order that was approved, they would have to come back to
amend the Development Order. She mentioned it goes a step farther because the project is
dependent upon the density based on the boardwalk easement, so it all ties together. She
mentioned generally it is a procedural paperwork process to accept the easement.
Mr. Hartwell mentioned the easement allows for the 10' building of a boardwalk and wished to
know the impact to the Certificate of Occupancy if it cannot be completed on dry land and the
Army Corps of Engineers does not approve it.
The CDS Director replied the boardwalk would then need to be developed within the easement
and they would work out the differences depending on what happened.
Dr. Pullen commented a 10' easement does not say the boardwalk will be 10' wide and wished to
II
know how wide the actual boardwalk is going to be. The CDS Director stated she did not have a
I~; s~ be 3'
t~ le~~~
t ~~ ~~ u:':~~~~ l:'~tA~:;,,:~
t~~:~~; d ~: g~egi=~~~\i:~~.
vndek'
The CDS Director stated it could not be 3', it could be 9 W. She believed the minimum size for a
sidewalk is 6' wide and the boardwalk is anticipated to be as wide as possible and she would hope
it would be wider than 6', up to 10'.
Regular Council 10- 9- 07
169
EASEMENTS FROM PRESIDIO cont.
The City Attorney mentioned that the Grant of Easement Document prepared two or three years
ago to use as a blanket easement for the entire boardwalk anticipated problems where they are
going to have to meander or go around some obstacles, or in the development have it more
narrow. She said the language of the easement document provides for that and also states that
the City shall have the right to determine the exact location of the boardwalk and to place it in
accordance with all federal, state, and local laws.
i Dr. Pullen questioned whether the City was staff or City Council. The City Attorney replied it would
I fall to the Code and what is required as minor and major site plan amendments and it would
depend on where they are at that point. She told Council she spoke with Mr. McMichael today and
he was upset if it would have been pulled, but he is positioned to get a building permit next week
and that is why the easement is a very big issue for him right now. She said if Council is
concerned about the design of the boardwalk and want to see that, then perhaps they could
separate the two issues; approve the easement as it is already sUbject to all the rules and
regulations, then perhaps bring back the site design. She pointed out that will delay progress on
that development.
The CDS Director reminded Council that typically the easement is granted to the City, then the
City is responsible for building the boardwalk but in this case the developer is building the
boardwalk that will basically be 10', plus or minus a foot or two in one or two locations, and may
have to meander around trees.
Mr. Miller expressed understanding that the developer is very concerned about the Certificate of
Occupancy because without it he cannot move people into the floors that are completed. He said
he talked with Mr. McMichael and they would like to propose using pavers because they looked at
the overall design and they would be willing to pay the extra cost to put in pavers to blend in with
the other aesthetics of their facility, but they do not want to take the time to come back to the CRA
because they are really concerned about the Certificate of Occupancy. He said if they had the
option, they would like to go with the pavers in lieu of the brushed concrete.
The Mayor pointed out they would present that when they apply for the building permit, once the
easement is approved.
The CDS Director said if they do want to use pavers she would want to see exactly how they are
going to develop it because of safety issues and staff would have to look at it. She said staff can
look at that as part of the building permitting process but what was presented to the CRA is
consistent with what is elsewhere and is appropriate for the boardwalk.
Mr. Miller wished to know if Council could give staff the approval of the design aspect of it so that it
does not have to go back to the CRA.
The City Attorney stated when the CRA approved the design they would still have authority under
the Development Order that gave them the original authority. She said if Council wanted to look at
r that and make some change then she would suggest that they bring the design back to Council
I with a CRA recommendation. She commented that is still over and above what is done on the
boardwalk designs because staff would already have the discretion to determine whether it is
pavers or concrete.
Mr. Miller commented if staff has the authority then there is not a problem. The City Manager
stated they do not in this case because it specifically said in the Development Order that the CRA
would approve the design; so it is impossible to say tonight what would be acceptable as far as
pavers are concerned. She said if Council wishes to vote on the easement, then that is what staff
would suggest and if Council has an issue about whether or not they want to see the site plan
approval for the boardwalk and want it to come back to Council, she suggested that be a separate
motion.
Regular Council 10- 9- 07
170
EASEMENTS FROM PRESIDIO cont.
Mr. Garvie requested clarification on how the DEP permit to build over the water fits in with the 10'
easement to build the boardwalk on land. The CDS Director
explained it is a 10' easement and if
they choose to build a 12' boardwalk and extend it over the water they can and a DEP permit
would be required. Mr. Garvie questioned whether they have the option of not
building the
boardwalk on the easement. Both the City Attorney and the CDS Director
replied no.
Dr. Pullen received clarification that the 10' easement is from the mean
high waterline landward.
The Mayor opened the floor for public input. As no one wished to
Mr. Minich moved to accept two Grants of Easements from Presidio
sidewalk and utilities along the south side of Miracle
speak public input was closed.
Developers, LLC, for
Strip Parkway ( US Hwy 98) and a
I
boardwalk along Santa Rosa Sound on the Presidio Condominium to the
property, subject
design approval by the CRA on 5 September 2007, and all federal, state, and City Code
permitting requirements. Mr. Reeves seconded motion and it carried unanimously with
Holmes, Miller, Reeves, Garvie, Pullen, Hartwell, and Minich in favor.
GENERAL PUBLIC
Kabe Woods, 240 Brooks Street, requested when Council considers
identifying the top three
legislative priorities to forward to the Northwest Florida League of Cities for the 2008 Legislative
Session that the issue of removing/ reducing school
funding from the ad valorem tax burden and
replacing with a $ 0. 1 sales tax be made a high priority.
SPECIAL PRESENTATION - YOUTHBIZ2015
Presentation by Willie Farrow on behalf of Youth Biz 2015.
Reverend Willie Farrow gave a presentation on the Youth Biz 2015 Program that
provides life
changing opportunities for youth ages 16- 21 through education, training to develop job skills, and
leadership development activities. He mentioned the community partnerships already developed
and asked Council to consider endorsing Youthbiz as part of the Fort Walton Beach
agenda
moving forward.
No action was taken by Council.
PUBLIC HEARING: ORD. 1733 - REZONE FROM R.2 TO MUCC. 1 403 HOLLYWOOD BLVD
NW
The City Attorney read the ordinance by title and gave the oath to all individuals who
may testify.
AN ORDINANCE OF THE CITY OF FORT WALTON BEACH, FLORIDA; RELATING TO THE
REZONING OF CERTAIN PROPERTY WITHIN THE CITY OF FORT WALTON BEACH
LOCATED AT 403 HOLLYWOOD BOULEVARD NW; PROVIDING FOR AUTHORITY;
PROVIDING FOR FINDINGS OF FACT; PROVIDING FOR PROPERTY TO BE REZONED FROM
R-2 MULTIFAMILY DWELLING DISTRICT TO MUCC- 1 MIXED USE COMMUNITY
COMMERCIAL DISTRICT; PROVIDING FOR A ZONING MAP AMENDMENT; PROVIDING FOR
CONFLICTING PROVISIONS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN
EFFECTIVE DATE.
The Mayor opened the public hearing. As no one wished to speak the public
hearing was closed.
I>
Mr. Garvie moved to adopt Ord. 1733 on second