Pond Repair and enlarge holding pond 7/2011 $24,716.00
Oak Hill @ #6101 Replaced two culverts 8/2011 $49,901.00
Okaloosa Lane Spillway Repair cross drain and spillway 8/2011 $13,719.00
Earl Campbell Road (Assist Repaired washout/const rip rap
City of Laurel Hill) basin 9/2011 $18,636.00
Hwy C4A Ditch repair 9/2011 $66,133.00
New Ebeneezer Road Replace failed cross drain 9/2011 $16,619.00
Facility Maintenance
Holding Pond Construct new holding pond 10/2011 $11,398.00
PJ Adams Construct new headwall 11/2011 $9,135.00
Install inlet boxes and pipe to
Lunnie Barns retention area 11/2011 $12,579.00
1st Avenue Pipe replacement and install inlets 11/2011 $58,046.00
Old Ebeneezer Road Construct swale 12/2011 $20,623.00
2011 Total $610,335.00
Springhill Road Replaced structures & inlets 1/2012 $44,372.00
Gibson Pond (Joint proj w/
FWB) Install structures/upgrades/outfall 2/2012 $134,268.00
Replaced structures & pipe slip
Stonebridge lined 3/2012 $26,879.00
Atwell Road Pipe replacement 3/2012 $37,873.00
Vinson Ray Road Replaced driveway culverts 4/2012 $22,383.00
Emergency repair to blow out in
East Williams road 4/2012 $75,720.00
Tanglewood Pond Install new overflow structure 5/2012 $15,551.00
Bay Cove Lane @ #5 Repair failing pipe and outfall 6/2012 $21,714.00
10th Avenue @ library Construct swale and pave area 6/2012 $21,571.00
Emergency repair of failing cross
Monahan Drive drain 7/2012 $46,721.00
Lake Ella Road Pipe replacement 9/2012 $11,812.00
Pocahantas Pipe replacement 10/2012 $11,073.00
2012 Total $469,937.00
Gap Creek Grant Match Grant total $1M In progress $300,000.00
6th Street (btwn 5th & 6th Pipe replacement (Materials on
Ave. Shalimar) order) Materials Est. $35,000.00
Captial Improvement Projects 2014 – 2017
Regional Improvement - phased
Port Dixie - Phase 1 approach 2014 $150,000.00
Regional Improvement - phased
Northern Pines - Phase 1 approach 2014 $150,000.00
Regional Improvement - phased
Port Dixie - Phase 2 approach 2015 $150,000.00
West County Regional - Regional Improvement - phased
Phase 1 approach 2015 $150,000.00
West County Regional - Regional Improvement - phased
Phase 2 approach 2016 $250,000.00
Hunington Subdivision Stormwater System inadequate 2016 $150,000.00
West County Regional - Regional Improvement - phased
Phase 3 approach 2017 $250,000.00
Lancaster Regional - Phase Regional Improvement - phased
1 approach 2017 $250,000.00
* all dates are expressed in Fiscal Year
Road Projects
Fiscal Year 2011
Preserved/treated hot mix roads (resurface list), $516,000
Preserved/treated cold mix roads (Yellow Bluff S/D, Bob Brooks Rd) $309,000
1 Mile dirt to pave, Keyser Mill Road Phase 1, $841,000
Fairchild Road Bridge Replacement, $115,000
Fiscal Year 2012
Preserved/treated hot mix roads (resurface list), $500,000
Preserved/treated cold mix roads, $200,000
Buck Ward Road, Fairchild/General Bond FDR & widen, $1.4M
Foxwood Phase 1, stormwater improvements and overlay, $250,000
West Plympton Road, dirt to pave, $200,000
Clear Creek, dirt to pave, $115,000
General Bond, FDR, $200,000
Keyser Mill Road, dirt to pave, $150,000
Hwy 393 Phase 1, Hwy 90 to Poverty Creek, widen and FDR, $1.5M
Hwy 393 Phase 2, $550,000
Lake Ella Bridge Replacement, $170,000
Millside Road Bridge Replacement, $200,000
Millings (dirt to Asphalt Millings Surface) $154,000
Fiscal Year 2013
Preserve/treat hot mix roads (resurface list), $500,000
Preserve/treat cold mix roads, $200,000
Millings (dirt to Asphalt Millings Surface) $175,000
Foxwood Phase 2, stormwater improvements and overlay, $250,000
Fairchild Road, dirt to pave $1M (Total project cost $2.5M)
Okaloosa Lane, dirt to pave from Aplin to Serenity Lane $1.4M (Total project
cost $2M)
Green Acres Blvd, $50,000 (total project cost $1M)
MLK FDR $100,000 (total project cost $2.2M)
Robinson Road, dirt to pave, $165,000
Gilmore Road, dirt to pave, $150,000
Lighthouse Church Road, stormwater improvements and overlay, $100,000
Stateline Road, dirt to pave/millings (pending state line location), $100,000
Reeves Road Bridge Replacement $200,000
Fiscal Year 2014
Preserve/treat hot mix roads (resurface list), $500,000
Preserve/treat cold mix roads, $200,000
Davis Road, dirt to pave, $125,000
Mount Olive Road, mill/resurface, $600,000
P.J. Adams Parkway, rehabilitation, $100,000 (Total project cost $1.1M)
Foxwood Subdivision Phase 3, stormwater improvements and overlay, $250,000
Millings (dirt to Asphalt Millings Surface) $100,000
Bridge Replacement (Wilkerson Bluff Road - Possible), $200,000
Cold Mix Road Rehab $200,000
Park Projects
AREA DESCRIPTION COST
FY 11 Cleo Park Irrigation, sod, mulch, signage, concrete parking $ 21,905.34
Install 3200 lf. 4x4 fence posts on property line.
Baker Arena (Materials only) $ 2,320.00
Demolished Old Wood frame restroom &
Baker Ball Park constructed new block structure $ 52,000.00
Refurbish restroom, observation deck and stairs,
replaced 1700 lf of boardwalk deck boards,
Beach repainted accessway signs, at Beach Accessway
Accessways #1, #2, #3, #7 & #1 Soundside $ 15,640.00
Cleared property of undergrowth; formed and
poured small monument for engraved dedication
Gap Creek stone. $ 2,300.00
Lake Silver Fencing; parking lot; erosion control. $ 367,672.00
Woodlands Constructed pavilion, sidewalk installed fencing. $ 11,250.00
FY 11 Total $ 473,087.34
Emergency replacement of pedestrian accessway
Pelican Isle boarwalk at Pelican Isle Condo on 10 ft. County
FY 12 Boardwalk accessway. (Materials only) $ 9,400.00
Assisted Airport Department with clearing trees
Airport tree from flight path per Memorandum of Aggreement.
clearing (labor & tip fees). $ 2,000.00
Removal of debris from old sewer plant; clearing
around pond; hauling in fill; digging trenches for
Don Stillwell irrigation; sidewalk construction; fence installation. $ 114,762.30
Laruel Hill Park Construction of wood perimeter fence. $ 23,559.92
Demolition and reconstruction of restroom at
Marler Park boatramp. (Inmate labor). $ 24,224.42
Shalimar Elem. Installed ground sleeves, post and netting for
Park temporary baseball outfield fencing. $ 5,100.00
Shoal River Repaired pavilion damage caused by lightening
Park strike. Replaced boat ramp. (Contractor.) $ 65,103.73
Wilderness Repair two boardwalks damaged by falling trees.
Landing (Materials only) $ 4,200.00
Woodlands Installed swings and safety surfacing. (Materials
Park only) $ 2,100.00
Derelict Removed 8 derelict vessels from County Waters
Vessels (Turn Key Marine P.O.) $ 24,500.00
Construct parks storage on old airport property.
Cavalier Dr. Install shelves in house for material storage; general
storage construction and renovation. $ 24,016.57
FY 12 Total $ 298,966.94
FY 13 Laurel Hill Park Constuct 10 ft. wide boarwalk across wet area. $ 72,550.00
Neighborhood
Park Construct neighborhood park with picnic tables. $ 50,000.00
Cavalier Dr. Construct pole barns for parks storage on old
storage airport property. $ 17,681.98
Choctawmar
Park Fence; parking. $ 25,000.00
Little Marler
Park Reroof pavilion; replace water fountain. $ 5,000.00
Sunset Park New H/C equipment $ 40,000.00
Don Stillwell $ 243,624.00
Bay Drive Construct 1100 lf. Sidewalk for Bluewater Bay MSTU.
sidewalk (Inmate labor). $ 1,239.51
FY 13 Total $ 455,095.49
Silve Oaks
FY 14 Park Additional funds for park development. $ 100,000.00
Cavalier Dr.
parks storage Additional funds for storage. $ 25,000.00
Holt Park Proposed park in cooperation with Fire Dept. $ 200,000.00
Don Stillwell
Phase III Additional funds $ 250,000.00
Shade
structures /
Play Structures Various parks. $ 150,000.00
Lake Silver Improvements $ 50,000.00