Okaloosa County BOCC — October 15, 2013 — OTA_Internal Coordination_Email Comments — reading text
Part 9 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 86-OTA_Internal Coordination_Email Comments.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
he/she may have and forward the form to the following email address:
OSTCBD@dhs. gov.
The TSA will review and analyze the efficacy and impact of these changes to determine if it may
be necessary for TSA to re-certify the CBIS system(s). Once the review has been completed,
TSA shall notify the local TSA FSD and the Airport with the TSA recommendation and testing
requirements for the system changes,
Page 30 of 39
HSTS04-13-H-CT1161
APPENDIX C
Construction Milestone Schedule
Design & Construction Services Milestones [Dates to be
included]
Project Validated / Notice to Proceed (NTP)
Design OTA Awarded
Facility Modification OTA Awarded
Pre-Design Deliverables Submitted
Pre-Design Deliverables Approved
Schematic Design Deliverables Submitted
Schematic Design Deliverables Approved
30% TSA Design Deliverables Submitted.
30% TSA Design Deliverables Approved
70% TSA Design Deliverables Submitted
70% TSA Design Deliverables Approved
100% TSA Design Deliverables Submitted
Final Construction Drawings Approved
Facility Modification NTP (if applicable)
Facility Modification Progress Meetings (reoccurring)
Facility Modification Substantially Complete (if applicable)
Site Assessment and Survey Report Submitted
Site Installation Plan (SIP) Submitted
SIP Approved
EDS Delivered and Placed
Site Acceptance Test (SAT) Passed
Integrated Site Acceptance Test (SAT) Test Readiness Review Complete
(if applicable)
iSAT Passed (if applicable)
EDS Installation/Networking Start
EDS Installation/Networking Finish
EDS Decommissioned (if applicable)
EDS Removal Start (if applicable)
EDS Removal Finish (if applicable)
Live Bag Screening (LBS) Start
Record Dwgs / CAD As-Built Submitted
| TSA Final Sign-off of Project
Final Invoice Submitted
Project Completion Notification Submitted
Project Finish / Contract Closeout
Page 31 of 39
HSTS04-13-H-CT1161
APPENDIX D, SCHEDULE OF CONSTRUCTION DELIVERABLES
The following deliverables are required to be submitted by the COUNTY:
Item Submitted To: Frequency or Due Date
Design: pre-design, schematic, |} TSA Regional Deployment In accordance with the TSA
30%, 100% to include detailed | Coordinator PGDS.
construction cost estimate
EDS Delivery Schedule TSA Regional Deployment NLT 30 Days after
Coordinator Construction Contract Award
Schedule of Values (Design, TSA Regional Deployment Within 30 days after execution
Construction, Baggage Coordinator of the TSA Agreement or
Handling Contracts)
TSA Contracting Officer
upon issuing Notice to
Proceed to Contractor. To be
updated on a monthly basis
and submitted with the
monthly report.
Copies of the Design and”
related Construction
Contracts and Change Orders
TSA Regional Deployment
Coordinator
TSA Contracting Officer
Upon contract award. Change
Orders affecting the CBIS
Project require advance TSA
approval.
Monthly Milestone and TSA Regional Deployment By the 10" of each month.
Project Status Report Coordinator Electronic submission is
TSA Contracting Officer requested if feasible.
TSA Site Lead Contractor
Quarterly Project Financial TSA Regional Deployment Quarterly upon execution of
Statement Coordinator the OTA.
TSA Contracting Officer
FinanceConfirm@tsa.dhs.gov
Summary report of Small
Business/Disadvantage
Business Enterprises
utilization Report
TSA Contracting Officer
By September 30" each year
and upon completion of the
Project via email
CONSTRUCTION PHASE
Mechanical and Electrical TSA Regional Deployment Upon completion by the
Shop Drawings Coordinator COUNTY.
TSA Site Lead Contractor
Close Out Process
Close Out Process —
Correction of testing
deficiencies
Close Out Report submitted to
TSA Regional Deployment
Coordinator and TSA Site
Lead Contractor
Airport responses within (2)
weeks of receipt of QLR and
TSR to address noted CBIS
Final Copy of PLC program
and software disaster recovery
TSA Regional Deployment
Coordinator
No later than 30 days after
commissioning of system(s)
Page 32 of 39
HSTS04-13-H-CT1161
procedure in electronic format.
As Built Drawings in TSA Regional Deployment No later than 30 days after 30-
electronic format, .dwg Coordinator day operational run-in period
(AutoCAD) or comparable
format to include final
description of operations;
mechanical layouts, including
belt speeds in CAD and PDF
file format.
Overview of drawings of the | TSA Regional Deployment 30 days after 30-day
Matrix/Node, Resolution Coordinator operational run-in period
Room, OSR Room as
applicable. dwg (AutoCAD)
or comparable format
Final Invoice
TSA Regional Deployment No later than 90 days after
Coordinator final sign-off of system by
TSA CO ' | TSA Deployment Manager,
following successful
operational run-in period and
start of live bag screening
POST COMMISSIONING CHANGES
CBIS Changes after OSTCBD@dhs.gov See Post Commissioning
Commissioning
Requirements, Appendix A,
paragraph 2.5.7
The Monthly Milestone and Project Report-are to be submitted by the 10" of each month. A
draft Monthly report template will be submitted via separate correspondence. The Monthly
Milestone and Project Report shall address the following:
a.
b.
=
Actual start and/or finish dates for updated/completed activities.
Remaining duration, required to complete each activity started, or scheduled to
start, but not completed
The Project’s progress to include Project Percent Completion; cost incurred
and invoiced to date; a forecast the Project completion date and final costs; as
well as monthly schedule and budget variances throughout the Project.
Percentage for completed and partially completed activities.
Any CO approved changes including but not limited to new activities, deleted
activities, activity duration changes, and change in logic relationships between
activities.
Status date for the schedule update.
A statement that identifies and describes any current or anticipated delays that
includes the following information: identification of the delayed activity by
description and activity code; type of delay; cause of the delay; effect of the
delay on other activities, milestones, and completion dates; identification of
actions needed to avoid or mitigate the delay.
Summary of cost incurred and invoiced to date.
Page 33 of 39
HSTS04-13-H-CT1161
i. Description of lessons learned
j. Construction Schedule in both PDF and “‘live’/usable format to depict the
critical path, baseline and actual date information; predecessors/successors and
shall be broken down to a minimum of three (3) WBS levels where applicable.
The construction schedule will be used for all planned TSA activities (delivery of equipment,
scheduling of testing, etc).
Page 34 of 39
HSTS04-13-H-CT1161
APPENDIX E
STIP DATA REQUIREMENTS FOR CHECKED BAGGAGE SYSTEMS
The TSA HQ Office of Information Technology (OIT) and Security Technology Integrated
Program (STIP) require STIP-enabled transportation security equipment (TSE) to have specific
connections to securely and reliably network the equipment. Multiple parties play a role in this
portion of Checked Baggage Inspection System (CBIS) specification and execution.
Roles and Responsibilities for Implementing STIP
As CBISs are recapitalized or optimized, the project owner’s contractor will provide new
telecommunications outlets and cables as needed to support new technology. If a CBIS
reconfiguration is initiated as part of a recapitalization/optimization, safety effort, new
technology deployment or any other CBIS redesign initiative, the CBIS contractor will be
responsible for restoring the previous state of connectivity (“make whole”), including
development of the scope of work (SOW). Implementation in the field will occur via the CBIS
contractor. A working group, or Integrated Local Design Team (ILDT) must be formed
consisting of representatives from the Airport Authority, FSD staff, OSC, OIT and STIP. The
group should meet immediately via conference call once it has been determined that a CBIS is
going to be recapitalized or optimized. This action will ensure that ALL aspects of the CBIS
redesign have been identified and assigned to a specific group for action and funding. The ILDT
will organize the working group members, develop, review and approve the SOW. The OIT
Field Regional Manager (FRM) shall always be consulted when a CBIS redesign is initiated and
will provide the necessary routing information to ensure the checked baggage systems are
appropriately cabled to a networked TSA IT cabinet.
The IMAC Process
The IMAC Process is the mechanism by which TSA OIT will procure and install IT hardware
(e.g. network switch) following the IT infrastructure build-out of a CBIS contractor. The OSC
Regional Deployment Manager (RDM) shall be responsible for engaging OIT at project
initiation and including the respective regional Field Relations Manager (FRM) throughout the
construction process.
The IMAC process takes between 30 and 45 days and needs to be initiated to complete the
following tasks:
¢ Procurement, configuration and shipment of IT hardware
e Installation of IT hardware
¢ Patch cabling of checked baggage equipment
¢ Validation of network connectivity for checked baggage equipment
e Validations of STIP EM sever registration for checked baggage equipment.
Page 35 of 39
HSTS04-13-H-CT1161
It is imperative to engage each team member as early as possible in order to avoid any gaps in IT
Services.
Specific Design Standards and Requirements
Two modular jacks consisting of a flush-mounted telecommunications outlet box plus/minus 10
feet from the equipment are required. Even though one is redundant, both terminations should
be connected using Cat5e or Cat6 4-pair 100 ohm unshielded twisted pair (UTP) or screened
twisted pair (ScTP) cable and terminated on the patch panel in the closest TSA IT cabinet. The
data cable type should be based on the existing conditions at the Checked Baggage Inspection
System (CBIS). The purpose of this connectivity is so that TSA HQ can review statistical data
over the network from screening equipment for a particular airport and time period without
having to go to the site.
Installation and/or relocation of Cat5e/Cat6 data cabling will meet or exceed the specifications
listed in the TSA Structured Cabling System Guidelines dated July 2012 [Attached]. This
document will be provided by the TSA to the ILDT.
In addition, the following requirements should be met:
> All ETDs and stand-alone EDSs will have 1 “dual telecommunications outlet”.
> Itis assumed that when a multiplex server is present, connectivity to TSANet will
terminate at the multiplex server cabinet, therefore connectivity to TSANet for each EDS
is not required.
> All core drilling will support a minimum of 4 “modular jacks”.
> All new fiber installations will be multimode fibers, either multimode fiber, either 50/125
ot 62.5/125 micron fibers r 50/125 or 62.5/125 micron fibers, six-strand bundles enclosed
in inner duct.
> All cabinet installations require 2 110v 20A service.
> All cabinet installations will meet the local seismic rating requirements and can be
floor/bracket mounted.
> All cabling outside of TSA controlled space must be in Rigid Metal Tubing (RMT)
conduit. Any deviance will must be approved through existing RFV procedures.
> All newly installed and existing data jacks and associated patch panels must comply with
TSA’s approved scheme [see provided TSA Structured Cabling System Guidelines dated
July 2012].
> Provide TSA completed Data Capture Sheet [Attached] and cable certification paperwork
prior to established I-Sat date.
Page 36 of 39
HSTS04-13-H-CT1161
Figure 1 illustrates all of the equipment that must be connected to the Main Distribution Frame
(MDF)/Intermediate Distribution Frame (IDF) IT cabinet for a stand-alone CBIS configuration.
When the EDS are in a stand-alone configuration, each EDS must be connected to the patch
panel.
Figure 1
STAND-ALONE CBIS CONFIGURATION
TSA IT
Cabinet
(Existing)
| CAT Se or
er es