TSA Test Acceptance Lead at the earliest opportunity, but no later than 120 days prior to the
requested testing date. Required documentation includes:
Page 26 of 39
HSTS04-13-H-CT1161
e Completed Site Survey Data Collection Checklist
Any and All Approved Request for Variance (RFV)
Basis of Design Report
Sample BHS & CBIS Reports for all PGDS required Reports
BHS & EDS Network Diagrams and Server Architecture
Local Procedures for Fail-Safe, E-Stop, Jam Clearing and IQ Test Conduct
Airport/Airline Bag Induction/Hygiene Procedures
BHS Specifications
Controls Description and/or Description of Operation (if both exist then provide both)
Fail-safe and/or E-Stop Zone Drawings
BHS Mechanical Plan and Elevation Drawings from Natural Induction Locations to & through
the CBIS, CBRA and Make-up Locations with Conveyors labeled Plan View Drawings and
Electrical Drawings of the BHS/CBIS with Control Station & Photoeye Locations and labeling.
All drawings will be “Approved for Construction” by the Airport and not Pre-Bid or Bid Use
Only versions.
At least 1 Plan/Overview Drawing that shows the entire CBIS in a single view
e Conveyor Motor Manifest to include not less than (Conveyor Name, Phase, Conveyor
Type, Degree of Turn, Degree of Incline/Decline, Length, Speed in FPM, Motor HP,
Control Type (VFD yes/no), Brake Type, Motor Type, drive Type, FLA Rating).
e Installation & Commissioning Phasing Plan Narrative and Phasing Plan Drawings
Construction and Testing Schedules provided through weekly and monthly meetings and reports
prior to ISAT.
All drawings shall be clearly visible and readable when plotted on Arch D Size Stock. All
documents shall be submitted electronically (e.g. text documents in MS Word or PDF and
drawings in AutoCAD [.dwg] or PDF.)
Any system constraints that will prevent compliance with TSA testing and performance criteria
must be disclosed in writing to TSA as far in advance as possible to allow for evaluation of
applicable waivers. Any restrictions on system availability and accessibility for testing shall be
disclosed. Cutover plans including any phasing plans that will affect the TSA Acceptance Test
Contractor’s ability to test the full system from ticket counters and curbside inductions (if
applicable) through the outbound/sortation system shall also be disclosed to allow for the
development of an accurate SSTP. Cutover plans that will result in multiple testing phases shall
also be presented to the TSA RDC in writing for review and approval prior to the Test
Coordination Meeting and no later than 30 days prior to ISAT.
The COUNTY will have the opportunity to review and comment on SSTP in advance of testing.
Comments and/or questions should be directed to the TSA RDC and the TSA Site Lead
Contractor.
2.5.2. Test Readiness Report (TRR)
This pre-ISAT activity is conducted by TSA Site Lead Contractor in coordination with the
COUNTY (typically the BHS Contractor.) The purpose of this testing activity is to assure TSA
of site readiness for ISAT and is a precursor for TSA authorization for TSA Acceptance Test
Contractor to deploy. The COUNTY will be provided TRR data sheets by the TSA Site Lead
Page 27 of 39
HSTS04-13-H-CT1161
Contractor. BHS/CBIS configuration and operation shall be in final form intended for bag
screening operations. Unless mutually agreed to, changes/improvements to BHS/CBIS between
TRR and ISAT are not authorized. The COUNTY must address security and efficiency defects
found during TRR and be prepared to implement mutually agreed upon corrective actions prior
to ISAT.
Required input from the Project Team will include:
Functional Testing Documentation: Testing authentication must be clearly reported and show
every test with bag ID and declared status on printed EDS FDRS (Field Data Reports) and on the
printed Critical Tracking PEC Report (as required in PGDS Section 7.2.14) resulting bag
destination. Ledger forms should show test date, type of test, identification of bag destination
location, and ID number of the bags arriving at that location. These reports should be organized
and indexed in an electronic media/file or loose-leaf binder(s)
"Each test shall conclude with an indication of successfully passing the required criteria of
BHS specification and testing criteria and if conflict or failure exists, then so indicate
with an explanation.
= Presentation of completed testing and TRR required documentation to TSA Site Lead not
less than 7 business days prior to anticipated Pre-ISAT date is required.
System Mixed Bag Test and System Throughput Test Observation: Sufficient numbers of
test bags (no less than 100 test bags per EDS) will be utilized to “stress” the BHS/CBIS as would
occur during peak operating times. Test bag set profile should be similar to the TSA Acceptance
Test Contractor’s test bag profile.
« A real-time observation by TSA Site Lead Contractor of a global BHS/CBIS System
Mixed Bag Test and System Throughput Test using clear and suspect bags is required.
» All EDS equipment must be operational.
« All baggage entry points must be utilized.
The TSA Site Lead Contractor or Acceptance Testing Contractor performs the TRR. If
successful, a Test Readiness Notice is issued to the TSA RDC and the TSA Acceptance Test
Contractor for ISAT deployment. If delivered by COB Monday through Wednesday (5:00 p.m.
EST), ISAT deployment will occur the following Monday. If delivered any time Thursday
through Sunday, ISAT deployment will occur on the second Monday. If changes are made to the
system following TRR without prior coordination with TSA, ISAT testing shall be postponed
pending submission of documentation for review and evaluation by TSA and its Acceptance Test
Contractor (see paragraph 2.5.7)
2.5.3. Logistical Support Needs: The COUNTY shall identify and provide any logistical or
support needs that will impact TRR and ISAT testing, to include:
any process needed to obtain sufficient baggage tags should the system use IATA
baggage tracking mechanisms, pier tags should the system use pier tags, or blank bag tags
if the system does not use IATA baggage tracking mechanisms; Quantities of tags needed
will be coordinated during the Site Survey Meeting and the SSTP review Meetings
" any process needed to obtain sufficient baggage tubs/totes (typically 20 per installed
EDS)
Page 28 of 39
HSTS04-13-H-CT1161
= any process needed to obtain sufficient bag transportation devices (tugs, totes, carts, etc.)
needed to move test articles in and around the CBIS, CBRA, laydown area and sort/claim
devices
" any process needed to obtain safety training and/or General Contractor access for TSA
Acceptance Test Contractor, as required”
" any process needed to obtain airport badges/access for TSA Acceptance Test Contractor
personnel; and/or personnel escorts. Airport SIDA Badging Process shall not require
more than 2 trips of test team personnel to the site, 1 work week maximum duration each,
to obtain SIDA badges including fingerprinting, SIDA Training, testing, issuing and
pickup.
* availability of BHSC and BHS Programmer to operate BHS during ISAT and provide
support for ISAT Testing and diagnostic activities (BHS reports, investigations, and
explanations to questions from the TSA Acceptance Test Contractor)
" provide baggage handling support for testing activities including bag loading, unloading,
transport, fault recovery, during ISAT and TRR including movement between test and
laydown/storage areas; and
«availability of support for delivery and secure and weather protected storage of TSA
Acceptance Contractor test bags for ISAT (100 bags per EDS contained in 2 LD3s per
100 bags.)
2.5.4. ISAT Testing: The TSA Acceptance Test Contractor will meet with the COUNTY
between 30 and 45 days prior to testing to coordinate the conduct of ISAT testing. The TSA
Acceptance Test Lead and the COUNTY will finalize details relating to the scheduling and
duration of the testing. (Generally allow one day of travel for ISAT Testing Team in and out; one
day for Site Mobilization; one day per EDS Spur Line; one day per System Level Test (Dieback,
Mixed Bag Sortation and Throughput; one day for demobilization and cleanup). It is
recommended to schedule one to two additional days for unforeseen testing delays or
contingences.
2.5.5. Test Results and Reports
The Airport shall report corrective actions to be applied and the timeline associated with
deficiency corrections. Corrective actions shall address all defects identified in the TRR/TRN
(pre-ISAT) or QLR (ISAT). TSA is not obligated to accept or operate a baggage screening
system that does not meet the minimum test standards.
2.5.6. Operational Run-In
The Run-In period will extend for a minimum of 30 days from the start of substantial operations
with cutover of substantial input and output lines. This period of time shall be discussed and
agreed to by all parties during the SSTP development process, and reconfirmed at the completion
of the ISAT. Substantial Operations shall normally be defined as when the CBIS is processing
85% or greater of its normal (not peak) operational daily load of “checked bags or luggage” for
the time period at hand (i.e. not based on future dates of operation). This period shall also be
dependent on resolution of deficiencies found during testing and Run-In. Once a week during
the Run-In period, the Airport or their authorized representatives shall forward electronic
versions of all CBIS Reports required by PGDS Chapter 7, Section 7.2.14. to the TSA
Acceptance Testing Contractor. After receipt, review and analysis of at least 21 days of
Page 29 of 39
HSTS04-13-H-CT1161
performance data, TSA and their Acceptance Test Contractor will deploy to the site in either the
4" or 5" week of Substantial Live Operations to physically verify closure of open deficiencies,
and assess observe system operation against the data reported. The ILDT or their Contractors
will also pull and provide the PLC Code for the same PLCs as provided at ISAT start. Based on
the data analysis and physical observations, a recommendation will be made to TSA via a Test
Summary Report (TSR) to end the Run-In period, extend the Run-In period, and/or change the
operational status of the CBIS.
2.5.7. Post Commissioning Activities:
The TSA Site Lead Contractor will conduct 30-day operational run-in observations of the system
following successful ISAT testing.
The Airport shall provide the TSA RDC a written response outlining corrective actions that will
be taken due to outstanding deficiencies, issues, and action items identified in the Quick Look
Report (QLR) and Test Summary Report within two (2) weeks of receipt of the QLR or TSR.
For the continued and secure operation of the CBIS, all changes to the BHS system that impact
the CBIS operation during and after its initial commissioning must be reviewed, evaluated, and
endorsed by TSA before they are implemented by the Airport. The Post-ISAT changes
procedure must be provided in accordance with PGDS Appendix D. The procedure is to be
followed for all changes to CBIS systems other than those required for normal routine and
periodic maintenance/repairs to the BHS system. The Airport responsible for the BHS system
shall assemble an information package for submittal to TSA RDC which includes the following
minimum information.
e Written description of all proposed physical and programming changes to the BHS
and CBIS system(s)
e Reason for proposed change(s)
e Anticipated impact to system operation (e.g. increased throughput, lowered tracking
losses, elimination of bag jams)
e Drawings showing affected areas
e Any potential security, tracking or efficiency impacts, including impacts on TSA
manpower or operations
e Testing procedures
e Proposed date of changes
A CBIS Configuration Change Request Form will be provided by TSA. This package shall be
delivered to the local TSA FSD who shall review the package. The local TSA FSD shall add any
comments