READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — February 18, 2014 — reading text

Part 48 of 56. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

equipment.” BACKGROUND: The proposed project will upgrade existing water lines from 2" to 6" in a predominantly low to moderate income (LMI) neighborhood in the Newcastle Community, which will facilitate the installation of new fire hydrants, increasing fire protection in the area. The project will include the installation of approximately 14 new fire hydrants, 10,500 L.F. of 6" water main (including 8" bores where necessary), 2,300 L.F. of existing parallel mains where services need to be switched over from the old mains, and all associated appurtenances. Funding for this project is supplemented by a CDBG Disaster Recovery Fund (DREF) appropriation made available through the Florida Department of Economic Opportunity in the amount of $252,923.30 and is scheduled to expire October 25th, 2014. Soft costs, such as surveying and design, will be completed by in-house staff and not included in the approved funding request. OCWS is proposing to self-perform the construction of the new water mains and installation of the new fire hydrants to serve the Newcastle Community. OCWS plans to construct the water mains and install the fire hydrants using OCWS staff and equipment to expedite completion of the project. OCWS estimates that using their own forces and equipment to construct the project will shorten the construction schedule and will reduce the project costs over contracting with an outside construction company. OCWS has estimated the design-build project to cost approximately $450,000.00. As stated in the attached Public Notice, a cost breakdown of the project can be viewed by the public at our office anytime between now and the Public Meeting. The cost includes material (with fringe/insurance), labor, equipment (with maintenance), and subcontracted work. Packet Pg. 1175 OCWS has reviewed the construction requirements for the project and has determined that they have the necessary qualifications, labor and available time to complete the project. As presented earlier, Section 255.20 F.S., Local bids and contracts for public construction works; specification of state-produced lumber includes specific requirements for County governments that choose to construct projects valued at greater than $300,000 using their own forces and equipment. OPTIONS: Approve or Deny. RECOMMENDATIONS: Staff requests BCC approval to advertise and hold a public meeting at the March 28, 2014 BCC meeting to discuss and to vote on approval for OCWS to self- perform construction on the new water mains and fire hydrants for the Newcastle Area Water System Improvements Project using OCWS staff and equipment. RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator Packet Pg. 1176 ROBE RTS BLV D F I M BLV D BOB SIK!ES BLVD EL G . G DIV ISION ST D ! . RE N BE AL EX T D LV G ! . NE COUNTRY CLUB AVE M ODDFELLOW RD B DG ER OO LY NN AV E RN NE ER S TU Y WI MARL BOROUGH RD RD D DR SCHNEIDER DR LE JAMES LEE RD DOYCE DR DO G

Download this text file with its original spacing ↓