BACKGROUND: The proposed project will upgrade existing water lines from 2" to 6" in a
predominantly low to moderate income (LMI) neighborhood in the Newcastle Community,
which will facilitate the installation of new fire hydrants, increasing fire protection in the area.
The project will include the installation of approximately 14 new fire hydrants, 10,500 L.F. of 6"
water main (including 8" bores where necessary), 2,300 L.F. of existing parallel mains where
services need to be switched over from the old mains, and all associated appurtenances.
Funding for this project is supplemented by a CDBG Disaster Recovery Fund (DREF)
appropriation made available through the Florida Department of Economic Opportunity in the
amount of $252,923.30 and is scheduled to expire October 25th, 2014. Soft costs, such as
surveying and design, will be completed by in-house staff and not included in the approved
funding request.
OCWS is proposing to self-perform the construction of the new water mains and installation of
the new fire hydrants to serve the Newcastle Community. OCWS plans to construct the water
mains and install the fire hydrants using OCWS staff and equipment to expedite completion of
the project. OCWS estimates that using their own forces and equipment to construct the project
will shorten the construction schedule and will reduce the project costs over contracting with an
outside construction company. OCWS has estimated the design-build project to cost
approximately $450,000.00. As stated in the attached Public Notice, a cost breakdown of the
project can be viewed by the public at our office anytime between now and the Public Meeting.
The cost includes material (with fringe/insurance), labor, equipment (with maintenance), and
subcontracted work.
Packet Pg. 1175
OCWS has reviewed the construction requirements for the project and has determined that they
have the necessary qualifications, labor and available time to complete the project. As presented
earlier, Section 255.20 F.S., Local bids and contracts for public construction works; specification
of state-produced lumber includes specific requirements for County governments that choose to
construct projects valued at greater than $300,000 using their own forces and equipment.
OPTIONS: Approve or Deny.
RECOMMENDATIONS: Staff requests BCC approval to advertise and hold a public meeting
at the March 28, 2014 BCC meeting to discuss and to vote on approval for OCWS to self-
perform construction on the new water mains and fire hydrants for the Newcastle Area Water
System Improvements Project using OCWS staff and equipment.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 1176
ROBE RTS BLV D
F I M BLV D BOB SIK!ES BLVD
EL
G
. G DIV ISION ST
D
!
.
RE
N BE AL EX T
D
LV
G
!
.
NE COUNTRY CLUB AVE
M
ODDFELLOW RD
B
DG
ER OO
LY NN AV E
RN NE
ER
S TU Y
WI
MARL BOROUGH RD
RD
D
DR
SCHNEIDER DR LE
JAMES LEE RD
DOYCE DR DO G