READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 5, 2013 — J - FAA Approval Letter — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 16-J - FAA Approval Letter.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

m Mail Processing Center Aeronautical Study No. ey Federal Aviation Administration 2013-ASO-1377-OE gy Southwest Regional Office Obsiruction Evaluation Group ATTACHMENT 2601 Meacham Boulevard | Jc i, > \ Fort Worth, TX 76137 — we Issued Date: 04/25/2013 Michelle Resch Crown Castle U.S.A., Inc. 2000 Corporate Drive Canonsburg, PA 15317 ** DETERMINATION OF NOC HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Antenna Tower Niceville Location: Niceville, FL Latitude: 30-29-21.59N NAD 83 Longitude: 86-26-38.34W Heights: 8 feet site elevation (SE) 317 feet above ground level (AGL) 325 feet above mean sea level (AMSL) This aeronauticai stucly revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked/lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be e-filed any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) __X__ Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 10/25/2014 unless: (a) the construction is started (not necessarily completed) and FAA Form 7460-2, Notice of Actual Construction or Alteration, is received by this office. (b) extended, revised, or terminated by the issuing office. (c) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page | of 3 ATTACHMENT | ( a4 >) NOTE: REQUES'T FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. AFTER RE-EVALUATION OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED, YOUR DETERMINATION MAY BE ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD. This determination is based, in part, on the foregoing description which includes specific coordinates , heights, frequency(ies) and power . Any changes in coordinates , heights, and frequencies or use of greater power will void this determination. Any future construction or alteration , including increase to heights, power, or the addition of other transmitters, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. Any failure or malfunction that lasts more than thirty (30) minutes and affects a top light or flashing obstruction light, regardless of its position, should be reported immediately to (877) 487-6867 so a Notice to Airmen (NOTAM) can be issued. As soon as the normal operation is restored, notify the same number. A copy of this determination will be forwarded to the Federal Communications Commission (FCC) because the structure is subject to their licensing authority. If we can be of further assistance, please contact our office at (817) 321-7752. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2013-ASO-1377-OE. Signature Control No: 183878672-188417936 ( DNE ) Alice Yett Technician Attachment(s) Frequency Data cc: FCC Page 2 of 3 ATTACHMEN | *% Frequency Data for ASN 2013-ASO-1377-OE ell ay LOW HIGH FREQUENCY ERP FREQUENCY | FREQUENCY UNIT ERP UNIT 698 806 MHz 1000 Ww 806 324 MHz 500 Ww 324 849 MHz 500 Ww 851 866 MHz 500 W 869 394 MHz 500 Ww 396 901 MHz 500 Ww 901 902 MHz 7 W 930 931 MHz 3500 Ww 931 932 MHz 3500 Ww 932 932.5 MHz 17 dBW 935 940 MHz 1000 Ww 940 941 MHz 3500 Ww 1850 1910 MHz 1640 Ww 1930 1990 MHz 1640 Ww 2305 2310 MHz 2000 Ww 2345 2360 MHz 2000 W Page 3 of 3

Download this text file with its original spacing ↓