READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 07-15-Comprehensive Fee Schedule — reading text

Part 2 of 17. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-13499-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

11 :20 AM 22/ 8/ IFihotRF9wgR = deletion DRAFT City of Fort Walton Beach Comprehensive Fee Schedule Department and/or Resolution Description Current Rates Proposed Rates Number & Date Service COMMUNITY DEVELOPMENT SERVICES DEPARTMENT BUILDING PERMIT FEES ( Sec. 3. 02. 05\' I General Fees I Contractors Reg istration ~ $ 39 Der vear Res 07. 15 09/19/07 Building permit processing fee n/a $ 20 in addition to Dermit fee Res 07- 15 09/19/07 Job Card n/ a $ 1.00 each Res 07. 15 09/19/ 07 25. 00 Der submittal SFD $ 50.00 Revisions to approved permit, per submittal n/ a Der submittal MF $ 75.00 Der Res 07. 15 09/19/ 07 submittal Com Penalty for commencement prior to 300% of Dermit fee or $ 250. whichever is n/ a Res 07- 15 09/ 19/07 permitting ( Sec. 3.02.07) oreater Change of contractor, transfer of permit Sec. 3. 02. 10) Prorate balance of work No Change I Res 2003- 01 1/ 28/03 Res 07. 15 09/19/07 Expired permit ( Sec. 3. 02.08) DeJ38ABS SA J3e"~ it far "' srll Re- issuance reouires fee to be Daid Conditional' no work has commenced and Refund of permit fee ( Sec. 3. 02. 11) n/ a Dermit has not eXDired: reouires written Res 07- 15 09/ 19/ 07 notice to the BO Construction Permit Fees I No permit required for cosmetic work onlv. such as camet. tile. Daintino. landscaDino. 500 or less No permit required etc. ExceDtions include anv structural Res 07- 15 09/19/ 07 chanoe or anv work that requires an insDection Der the FBC. for the first thousand, plus ~ $ 36. 00 for the first thousand, plus $ 6.00 501 to $50, 000 for each additional thousand or fraction for each additional thousand or fraction Res 07- 15 09/19/07 Permit based on thereof, to and including $ 50, 000 thereof, to and including $ 50, 000 value of work, includes labor. ~ 7& for first $50,000 plus $+. for $ 330. 00 for first $50,000 plus ~ for materials. site work. $ 50, 001 to $ 100,000 each additional thousand or fraction each additional thousand or fraction Res 07- 15 09/ 19/07 and desion fees thereof to and including $ 100,000 thereof to and including $ 100,000 8eO,OO for the first $ 100, 000 plus ~ $ 572. 50 for the first $ 100, 000 plus $ 3.70 100, 001 to $ 500, 000 for each additional thousand or fraction for each additional thousand or fraction Res 07- 15 09/19/07 thereof to and including $ 500,000 thereof to and including $ 500,000 for the first $ 500,000 plus ~ $ 2. 052. 50 for the first $500,000 plus $ 2. 50 500, 001 and up for each additional thousand or fraction for each additional thousand or fraction Res 07. 15 09/ 19/07 thereof thereof 12eFffiiI Radon Fees. a 1% radon fee may be added, per F. S. 553. 721 and F. S. 468. 631 ( based on so. It. of oross floor area for new construction) I PlaA Re' 'ie" J Plan check fee ( new construction only} 50% of building fee ( Sec. 3. 02.06) No Change I Res 2003-01 1/ 28/03 Threshold building transmittaVprocessing 200.00 + International Code Conference n/ a $ Res 07- 15 09/19/07 fee/ ICC review fee Moving Fee ~ $ 110.00 Res 07. 15 09/ 19/07 8, plus $ 4Q per 2, 000 sq It above $ 55. 00 plus $ 8.60 per 2, 000 sq It above Res 07- 15 09/19/07 Demolition Fee ~ 20,000 sq It or fraction thereof 20, 000 sq It or fraction thereof First - $35. 00 Re. lnspection.. Fee ~ Second - $ 35. 00 Res 07. 15 09/19/07 Third and more - $ 105. 00 ReinsDection means the buildino insDector returns to the iob site to review corrected work denied on the Drevious insDection for the same violation. I Cert~icate of Occupancy ~ $ 35. 00 Res 07- 15 09/ 19/07 Cert~icate of Completion ~ $ 35. 00 Res 07. 15 09/ 19/ 07 Temporary Certificate of Occupancy $ 250. 00 No Change I Res 2003-01 1/ 28/03 Mechanical Permits and Inspection I Permit Fee Base ~ $ 36. 00 Res 07. 15 09/19/07

Download this text file with its original spacing ↓