READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 07-15-Comprehensive Fee Schedule — reading text
Part 2 of 17. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13499-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
11 :20 AM
22/
8/ IFihotRF9wgR = deletion
DRAFT
City of Fort Walton Beach
Comprehensive Fee Schedule
Department and/or Resolution
Description Current Rates Proposed Rates Number & Date
Service
COMMUNITY DEVELOPMENT SERVICES DEPARTMENT
BUILDING PERMIT FEES ( Sec. 3. 02. 05\' I
General Fees I
Contractors Reg istration ~ $ 39 Der vear Res 07. 15 09/19/07
Building permit processing fee n/a $ 20 in addition to Dermit fee Res 07- 15 09/19/07
Job Card n/
a $ 1.00 each Res 07. 15 09/19/ 07
25. 00 Der submittal SFD $ 50.00
Revisions to approved permit, per submittal n/
a Der submittal MF $ 75.00 Der Res 07. 15 09/19/ 07
submittal Com
Penalty for commencement prior to 300% of Dermit fee or $ 250. whichever is
n/
a Res 07- 15 09/ 19/07
permitting ( Sec. 3.02.07) oreater
Change of contractor, transfer of permit
Sec. 3. 02. 10)
Prorate balance of work No Change
I Res 2003- 01 1/ 28/03
Res 07. 15 09/19/07
Expired permit ( Sec. 3. 02.08) DeJ38ABS SA J3e"~ it far "' srll Re- issuance reouires fee to be Daid
Conditional' no work has commenced and
Refund of permit fee ( Sec. 3. 02. 11) n/
a Dermit has not eXDired: reouires written Res 07- 15 09/ 19/ 07
notice to the BO
Construction Permit Fees I
No permit required for cosmetic work onlv.
such as camet. tile. Daintino. landscaDino.
500 or less No permit required etc. ExceDtions include anv structural Res 07- 15 09/19/ 07
chanoe or anv work that requires an
insDection Der the FBC.
for the first thousand, plus ~ $ 36. 00 for the first thousand, plus $ 6.00
501 to $50, 000 for each additional thousand or fraction for each additional thousand or fraction Res 07- 15 09/19/07
Permit based on thereof, to and including $ 50, 000 thereof, to and including $ 50, 000
value of work,
includes labor. ~ 7&
for first $50,000 plus $+. for $ 330. 00 for first $50,000 plus ~ for
materials. site work. $ 50, 001 to $ 100,000 each additional thousand or fraction each additional thousand or fraction Res 07- 15 09/ 19/07
and desion fees thereof to and including $ 100,000 thereof to and including $ 100,000
8eO,OO for the first $ 100, 000 plus ~ $ 572. 50 for the first $ 100, 000 plus $ 3.70
100, 001 to $ 500, 000 for each additional thousand or fraction for each additional thousand or fraction Res 07- 15 09/19/07
thereof to and including $ 500,000 thereof to and including $ 500,000
for the first $ 500,000 plus ~ $ 2. 052. 50 for the first $500,000 plus $ 2. 50
500, 001 and up for each additional thousand or fraction for each additional thousand or fraction Res 07. 15 09/ 19/07
thereof thereof
12eFffiiI Radon Fees. a 1% radon fee may be added, per F. S. 553. 721 and F. S. 468. 631 ( based on so. It. of oross floor area for new construction) I
PlaA Re' 'ie" J Plan check fee ( new
construction only}
50% of building fee ( Sec. 3. 02.06) No Change
I Res 2003-01 1/ 28/03
Threshold building transmittaVprocessing 200.00 + International Code Conference
n/
a $ Res 07- 15 09/19/07
fee/ ICC review fee
Moving Fee ~ $ 110.00 Res 07. 15 09/ 19/07
8,
plus $ 4Q per 2, 000 sq It above $ 55. 00 plus $ 8.60 per 2, 000 sq It above Res 07- 15 09/19/07
Demolition Fee ~
20,000 sq It or fraction thereof 20, 000 sq It or fraction thereof
First - $35. 00
Re. lnspection.. Fee ~ Second - $ 35. 00 Res 07. 15 09/19/07
Third and more - $ 105. 00
ReinsDection means the buildino insDector returns to the iob site to review corrected work denied on the Drevious insDection for the same violation. I
Cert~icate of Occupancy ~ $ 35. 00 Res 07- 15 09/ 19/07
Cert~icate of Completion ~ $ 35. 00 Res 07. 15 09/ 19/ 07
Temporary Certificate of Occupancy $ 250. 00 No Change I Res 2003-01 1/ 28/03
Mechanical Permits and Inspection I
Permit Fee Base ~ $ 36. 00 Res 07. 15 09/19/07
