READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 13, 2015 — Presentation Proposed Project List — reading text
Part 2 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Presentation Proposed Project List — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
FWB Landing Waterfront 7
Improvements Phase 1
∗ Amount Requested: $1,099,463
∗ Proposer: City of Fort Walton Beach
∗ Project Summary:
∗ Goals for the project: enhance park for community events; improve
park for residents; make park a destination and focal point for land
and water related activities, services, and facilities
∗ Phase I includes construction of a new seawall, dock, boardwalk,
retaining walls/stairs, covered band shell and sidewalks. There will
also be a coastal ecology demonstration area which will include sea
grass plantings and oyster reefs, providing an educational
opportunity for local schools and environmental groups
∗ Economic impact of Phase I: jobs created during construction and the
future charter boats and passive waterfront activity rental booths
∗ The Chamber of Commerce has adopted a Resolution of Support for
this project along with the Downtown Merchants Association
8
Gulfarium C.A.R.E. Center
∗ Amount Requested: $89,580
∗ Proposer: Gulfarium Marine Adventure Park
∗ Project Summary:
∗ Phase 1 of the C.A.R.E. (Conserve, Act, Rehabilitate, Educate)
Center will comprise of six pools: one 20 ft diameter, one 12 ft
diameter, and four 6 ft diameter.
∗ This phase will cost approx $240,000.00
∗ The requested Direct Component Funds will provide the
funding necessary to refurbish fiberglass pools and to purchase
and install state-of-the-art Life Support Systems (filtration)
∗ Future phases of the Center include additional pools, hospital,
classrooms, lab space, natural history educational
opportunities, outreach programs, etc.
∗ Gulfarium C.A.R.E. Foundation is a 501(c)(3)
9
C.W. Ruckel STEM Class
∗ Amount Requested: $16,500
∗ Proposer: C.W. Ruckel Middle School
∗ Project Summary:
∗ Ruckel Middle School currently has a STEM (Science,
Technology, Engineering, and Math) class where students work
in groups of two on various computer-based modules
∗ Modules are designed to experience in STEM activities and
explore various careers related to the module topic
∗ Requested funds will cover the purchase and shipping of the
modules
∗ Long-term cost are minimal and related strictly to purchasing
refills of consumable materials; long-term cost will be covered
using lead teacher money, Adopt-a-Class program, and small
grants such as the Hurlburt Air Force Association grant
Project: Student-Led Habitat 10
Restoration in Okaloosa County
∗ Amount Requested: $90,000
∗ Proposer: Choctawhatchee Basin Alliance of Northwest Florida
State College
∗ Project Summary:
∗ Student led restoration and protection of property that belongs: City
of Fort Walton Beach, City of Valparaiso, State of Florida, City of
Destin, Okaloosa County
∗ CBA holds permits for the Choctawhatchee Bay shoreline restoration
sites in Valparaiso's Florida Park, Fred Gannon Rocky Bayou State
Park, and Okaloosa's Longwood Park
∗ Project will train AmeriCorps education team, provide hands-on
education component, lead student field trips to restore habitat at
selected sites, produce student-developed outreach materials and
compile monitoring data
∗ CBA will use the results of this project (both education and
restoration components) to leverage future activities such as college
and high school student monitoring of sites and community volunteer
The NeighborWood at Emerald 11
Coast Science
∗ Amount Requested: $89,999
Center
∗ Proposer: Emerald Coast Science Center
∗ Project Summary:
∗ The NeighborWood is a habitat restoration and expansion project designed to
improve 30,000 SF owned by ECSC for wildlife, citizens, & tourists of all ages
∗ This naturalized outdoor learning environment is designed to offer
integrated experiential education on many levels
∗ Restoration of the NeighborWood will improve nonpoint source pollution
that affects Gulf marine habitats by creating bioswales, contouring the trails
with the land and reducing the amount of loose sediment in the runoff
∗ The project will be monitored and evaluated by the biological community by
volunteers (Audubon Society, The Center for Snake Conservation, The
Orianne Society, and the North American Amphibian Monitoring Project)
∗ Horticulture classes will be offered by Okaloosa County Master Gardeners
and Okaloosa County Cooperative Extension Service
∗ The strategic plan will be implemented in three phases: (1) the pavilion and
the trail; (2) bog environment and native plant area; (3) interactive play areas
∗ Revenue generated through rental of the NeighborWood pavilion will help
sustain this project and ensure funds will be available for upkeep
Multi-use Outdoor Community 12
Facility
∗ Amount Requested: $83,000
∗ Proposer: Niceville Valparaiso Chamber of Commerce
∗ Project Summary:
∗ The proposed facility will provide a beautiful, environmentally friendly place
to hold community functions
∗ Provides fully accessible outdoor area for: residents of Twin Cities Pavilion
(County-owned assisted living facility); Disabled American Veterans Facility;
Children’s Advocacy Center; Sharing and Caring of Niceville; Emergency
Management Station; the Chamber of Commerce
∗ Chamber of Commerce will manage and monitor use of the facility
∗ Improvement of this property will have a positive economic impact on the
neighboring business, residential, and non-profit properties
∗ Maintenance on the existing stormwater system will have a positive impact
on the environment
∗ Major features: gazebos; benches; sidewalk network; wooden bridge;
parking improvements; fencing; landscaping; stormwater area; signage
∗ Labor will be provided as an in-kind investment by the City of Niceville
(estimated value of $13,000)
Life Center of Gregg Chapel 13
African Methodist Episcopal Church
∗ Amount Requested: $90,000
∗ Proposer: Gregg Chapel African Methodist Episcopal Church
(GCAMEC)
∗ Project Summary:
∗ GCAMEC is transforming the former Chester Pruitt Rec Center to a
community center to serve a diverse, low-to-moderate income
neighborhood
∗ Will create new jobs, implement workforce development
programming, and allow for the acceleration of the
refurbishment/renovation
∗ The Life Center houses one of the Okaloosa Head Start Programs—
has increased families served as well as the number of employees
∗ RESTORE Act funding requested to complete 4th phase of the building
retrofit in a single year, rather than in the projected three years
∗ Renovations include: air conditioning; parking lot; windows; flooring;
technology required to enhance conferences and meetings
Enhancing the STEM Biomedical 14
Sciences
∗ Amount Requested: $11,038
Program
∗ Proposer: Fort Walton Beach High School
∗ Project Summary:
∗ Receiving this grant will allow the FWBHS BioMedical Sciences
Program to offer a more intense professional program enabling
students to have success in the workplace and to meet industry
demand for our local area
∗ Primary objective of program is to prepare students to investigate
the roles of biomedical professionals as they study the concepts of
human medicine, physiology, genetics, microbiology, and public
health
∗ Once students complete the program, they will be prepare to take
and pass industry certification exam offered by the Center of
Excellence for Regenerative Health Biotechnology (Univ of Florida)
∗ Project expenditures include a series of required items to remain on
the leading edge of education (Durastill Water Distiller, MakerBot
Replicator Desktop 5th Generation 3D Printer; etc)
15
Choctawhatchee High School
Workforce Development Program
∗ Amount Requested: $89,995
∗ Proposer: Choctawhatchee High School
∗ Project Summary:
∗ Goal is to increase the current Engineering, Aerospace, and
Science Department’s capabilities to produce workforce and
college ready through the upgrade of programs while building
community partnerships
∗ Increasing and upgrading program assets with the grant will
allow for the increased participation in various programs,
leading to increased opportunities to earn college credit and
industry certifications while at CHS
16
Okaloosa Lane Bridge Conversion
∗ Amount Requested: $90,000
∗ Proposer: Okaloosa County Board of Commissioners
∗ Project Summary:
∗ Okaloosa Lane (between Aplin Rd and Serenity Dr) is a dirt roadway with
significant relief; two culverts serve as a creek crossing. Heavy rainfall
commonly overwhelms the culverts and causes damage to the roadway
(usually resulting in closures) and sediment deposit into the creek
∗ The County's current capital improvement plan has $1.5M to make
improvements to this segment of Okaloosa Lane; project scope includes
acquisition of right of way to accommodate sidewalks (for school
access), paving the roadway, and a stormwater management system
∗ In conjunction with this work, County forces will replace the existing
culverts in favor of a new, single-span, concrete bridge; permits have
been obtained from the NWFWMD and the Army Corps of Engineers
∗ Installation of the single span bridge will allow the existing creek to be
reestablished to conditions similar to what would exist if the culverts had
never been placed there
17
Preservation Trail
∗ Amount Requested: $90,000
∗ Proposer: Ruckel Properties (partnering with City of Niceville)
∗ Project Summary:
∗ The Preservation Trail (Phases 1 & 2) is the first 1.6 mile section of a trail
system that will be built in phases in conjunction with the development of
approx. 1,100 acres
∗ The trail system will provide healthy, recreational, and educational activities
in the natural setting of a native Xeric Hammock forest area within the
Niceville city limits
∗ The trail system will include exercise stops, flora and fauna educational
information, and peaceful vistas; the general public will be able to experience
nature whether walking, jogging, biking, pushing a stroller or by wheel chair
∗ Project cost is $343,000 ($90,000 direct component funds and $253,000
developer funds) for clearing, grading, paving, wayfinding/signage, benches,
art, etc. Continuing maintenance will be partnership w/ City of Niceville
∗ The project does not have any risks to implementation and will provide short
term jobs for construction and landscape workers
∗ The trail system amenity will draw retail tenants and other businesses to
planned town center and commercial/light industrial area, thereby creating
jobs
Environmental/Ecological 18
Science Fair Projects
∗ Amount Requested: $36,862
∗ Proposer: Northwood Art and Science Academy Team
∗ Project Summary:
∗ Northwood Arts and Science Academy is seeking to expand the current
science curriculum by means of a school-wide, ongoing science fair
project focusing on the environment and ecology. This real-life project
enables teachers to better prepare and motivate students to pursue
careers in science, technology, engineering and mathematics (STEM
