READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — April 27, 2013 — DREDGING DESTIN HARBOR ENTRANCE — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 168-DREDGING DESTIN HARBOR ENTRANCE.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

ISSUE ALONG WITH OTHER COASTAL PROCESSES, CONTINUED EROSION OF NORRIEGO POINT HAS PRODUCED LARGE SAND SHOALS IN AND AROUND THE ENTRANCE CHANNEL TO DESTIN HARBOR, DECREASING THE WIDTH AND DEPTH OF THE CHANNEL AND MAKING NAVIGATION OF THE AREA DIFFICULT AND DANGEROUS SHORT TERM EMERGENCY SOLUTION DREDGE THE AFFECTED AREA TO THE MAXIMUM DEPTH AND WIDTH ALLOWABLE BY PERMIT IN ADVANCE OF TOURIST SEASON PROJECT COST •T O T A L C O S T – N O T T O E X C E E D $ 2 0 0 , 0 0 0 FUNDING 1 ST P E N N Y O F T H E T O U R I S T D E V E L O P M E N T T A X (TDT) PLUS CITY OF DESTIN CONTRIBUTION •Unencumbered funds available in 1st penny reserves total $4,060,170 (Department 1175/Account 599010, as of March 4, 2013) LONG TERM SOLUTION THE CITY OF DESTIN IS IN THE PROCESS OF ACQUIRING A PERMIT TO ALLOW THE PROTECTION OF NORRIEGO POINT ONCE THIS PROJECT IS COMPLETED, THE MAJORITY OF MOVEMENT OF SAND FROM THE POINT INTO THE CHANNEL WILL BE CONTROLLED

Download this text file with its original spacing ↓