READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — December 16, 2014 — State Funding Opportunties — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 105-State Funding Opportunties.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
State Funding Opportunties – Draft
North County
• PJ Adams expansion and improvements: The four lane widening project, specifically
from Highway 85 to Interstate 10.
• Lake Silver Park: Installation of playground, swimming, and camping areas near the
creek.
• Widening of Highway 85 from current four lanes to six lanes, north from Duke Field
off-ramp to PJ Adams.
• Bob Sikes Airport (CEW) expansion: add 45,000 square foot hangar; utilities; 7,000
square foot office space; 150 parking stalls.
• Shoal River Off-line Reservoir & Surface Water Treatment Plant – no funding
needed now, but $40M - $60M in the future
This is a long-term project that would provide future water supply to the area via
conjunctive use – where drinking water would either come from existing groundwater
(wells) or new surface water treatment plant (water from the off-line reservoir and/or
direct withdrawal from Shoal River). We are currently in the land acquisition stage and
believe we have enough funding for that. At some point in the future, when the need is
there (either demand increases or regulatory mandate), we will look to construct the
reservoir, water treatment plant, and other associated infrastructure, such as roads and
utilities to it. Needless to say, we do not need any construction money right now for this
project, but certainly will be looking for funding in the future. We have been working
closely with the Mobile office of the U.S. Army Corps of Engineers for several years on
feasibility studies for the proposed Shoal River Offline Reservoir and Treatment Plant.
The Corps has come through with several grants under their Planning Assistance to States
(PAS) funding and the NWFLWMD has also invested significant financial resources
towards this project.
• Bob Sikes WRF Absorption Bed Expansion - $1.5M
Expand effluent disposal capacity from 0.38 MGD to 1.117 MGD to match that of the
WWTP, better posturing for growth at the BSIP & other areas of unincorporated
Crestview, such as Hwy 90 East (Shoal River Ranch area) or areas north of Airport Road.
• Bob Sikes Industrial Park Lift Station & Force Main Replacement/Upgrade - $0.9M
Replacing and upgrade this infrastructure would better posture the Bob Sikes Industrial
Park (BSIP) for future growth. There is currently a small lift station & force main that
collects and transmit takes everything west of the runway. For the area west of the
airport to develop (Adora Teal & John Givens), this lift station & force main really need
to be larger.
• Water & Sewer Main Extensions to the Shoal River Ranch - $2.1M
These water/sewer line extensions would possibly help to spur economic growth to Hwy
90 East. Estimate is for main extensions to the intersection of Hwy 90 & Jericho Rd.
South County
• Supplemental Reclaimed Water Project - $8M
Project consists of constructing infrastructure to transmit up to 4 million gallons per day
of reclaimed water from Okaloosa County Water & Sewer’s wastewater plant in Ft.
Walton Beach to the City of Niceville and Eglin Air Force Base to use for irrigation.
Proposed infrastructure consists of approximately 10 miles of 20” pipe, 1 mile of 12”
pipe, and equipment at the Arbennie Pritchett Water Reclamation Facility. The Eglin
Community Partnership Initiative ranks this as one of the top projects in NW Florida, as
evidenced by a Memo of Understanding that was recently executed by Eglin AFB
(General Harris), the County, and the City of Niceville. We have recently applied to NW
Florida Water Management District (NWFWMD) for a community assistance grant to
complete all design and environmental work to get the project shovel ready. The state
categorizes Reclaimed Water as Alternate Water Supply projects. This project meets
both immediate and long-term needs by re-using an available resource to keep our
potable water supply and environment sustainable. This project is currently unfunded,
but we hope to obtain the NWFWMD grant, and then obtain appropriations/grants
incrementally to complete the construction. We have been working closely with the
Mobile of the U.S. Army Corps of Engineers
• Lake Pippin Area Sewer Improvements Project - $2M
The Lake Pippin Area consists of 125 single-family homes directly on the north shore of
Choctawhatchee Bay. Currently, these homes are on septic tanks with drain fields that
discharge into the watershed of Lake Pippin and Choctawhatchee Bay. This project,
estimated at $4M, would design and install public sewer to the 125 homes by upgrading
backbone infrastructure and installing new mains, lift stations, and services. The estimate
also includes payment of the Capacity Expansion Charges, land acquisition, and
installation of plumbing from homes to the services in the public right-of-way. The
project improves the environment in terms of water quality – instead of septic tank
effluent discharging into the Lake Pippin/Choctawhatchee Bay watershed, where
wildlife lives and the public enjoys recreation, it would be centrally collected and
transmitted to our state-of-the-art Arbennie Pritchett Water Reclamation Facility for
treatment and disposal. During the 2014 legislative session, we received a state
appropriation of $2M, administered via a FDEP Grant Agreement. Therefore, another
$2M is needed to complete the project.
• East County Sewer Transmission Main - $4.0M
This sewer force main will divert all the wastewater from the East County Area
(Bluewater Bay) from the current regional wastewater treatment plant to OCWS’
Arbennie Pritchett Water Reclamation Facility. For OCWS, it is less expensive for
operations & maintenance to treat our own wastewater than pay the regional plant. In
addition, with the County’s flow diverted from this plant, capacity at the regional plant is
now available for the City of Niceville, allowing for more development to occur.
• Meigs-Seminole Lift Station and Associated Force Mains - $1.6M
This lift station pumps all the wastewater from the East County Area (Bluewater Bay) to
Rocky Bayou Lift Station and ultimately on to a regional wastewater treatment plant.
Rocky Bayou Lift Station is aging and has serious capacity and odor problems; it is also
located at a precarious location, adjacent to a canal off of Rocky Bayou. Rocky Bayou
Lift Station can be eliminated by upgrading Meigs-Seminole Lift Station installing two
associated force mains.
• Poquito Bayou Water Main & Sewer Force Main Directional Bores - $0.3M
OCWS has a 10” water main and a 8” sewer force main under Poquito Bayou, which
connects the Poquito/Longwood Area to the rest of the water/sewer system. These mains
are aging cast iron pipes laying on the bottom of the bayou in places. This represents a
significant risk to the environment, particularly with the sewer force main. This project
will replace both lines with new directional bores (high density polyethylene pipe).
• South Avenue Stormwater Pipe Replacement and Upgrade: Replace approximately
1,300 linear feet of stormwater piping (typically 60” diameter) that is failings due to
corrosion. Failures are leading to significant sediment deposit into Cinco Bayou.
Additional water quality improvements could be made by installing a stormwater
separator structure prior to the system outfall. Approximate construction costs are
$750,000 for materials and labor for installation.
• Cinco and Poquito Bayou Stormwater Separator Structures: At 5 locations along
Cinco and Poquito Bayous outfalls are depositing significant amounts of sediment and
debris. Installation of stormwater structures either at the water’s edge or the adjacent
right-of-way would improve the quality of runoff entering into the bayous. Each
structure costs approximately $100,000.
• Matthew Boulevard Turn Lane Improvements: With the growing traffic in the Destin
area Commons Drive has become heavily traveled by locals and tourists. Recent
modifications along Commons Drive has improved traffic flow to the point where
Matthew Boulevard often backs up into the adjacent round-about. Installation of a
second left turn lane would double the storage capacity and even offer shorter red times
along the adjacent arterial Highway 98. Improvements are estimated to cost
approximately $400,000.
