READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 2, 2014 — Change Order #4 - Admin Bldg — reading text
Part 2 of 5. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 152-Change Order _4 - Admin Bldg.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Abatement Project-Okaloosa County Admin. Building .
Yes. I'm the one that found it. Dj and | measured it.
Sent from my iPhone
> On May 20, 2014, at 11:30 AM, Dave Burleson <dave@lordandson.com> wrote:
>
>
> Shane,
> Can you confirm this for me?
>
> Dave Burleson
> Project Manager
> {Lord Son Logo Small Format]
> P.O. Box 1808
> Fort Walton Beach, FL 32549
> dave@lordandson.com<mailto:dave@lordandson.com>
> (850) 863-5158 PH
> (850) 862-4904 FAX
>
>
> From: Michael Brown [mailto:aresmbrown@bellsouth.net]
> Sent: Tuesday, May 20, 2014 11:06 AM
> To: Dave Burleson
> Subject: RE: Abatement Project-Okaloosa County Admin. Building
>
> Thank you Dave, we are proceeding with this work.
>
> Also, | just spoke with DJ on the site and they have uncovered 684 SF of sheet vinyl under carpet that was not within
the areas indicated under the basé bid. Shane George | believe has confirmed this.
>
> Using the unit price for the sheet vinyl, 684 SF @ $1.95/SF = $1,333.80 + $273.60 ($0.35/SF for carpet removal) =
$1,607.40 total add for this additional RACM. Please review and let me know if we are approved to proceed with this as
well.
>
> Thanks again.
>
> Michael J. Brown
> President
> ARES CONTRACTING, INC.
> 5000A Rangeline Road
> Mobile, AL 36619
> 251-379-7038 CELL
> 251-375-2139 OFFICE
> 251-375-2100 FAX
>
> "Seagull, you fly, across the horizon
> Into the misty mornin’ sun
> Nobody asks you where you are going
> Nobody knows where you're from
>
> Now you fly through the sky, never asking why And you fly all around
> ‘til somebody, Shoots you down
>
> Seagull you fly, seagull you fly away
> And you fly away today,
> And you fly away tomorrow
> And you fly away, leave me to my sorrow"
>
> For Benjamin Brown, fly free my son, fly free
>
>
>
> "It is better to remain silent and be thought a fool, than to speak up and remove all doubt!"
>
>
> From: Dave Burleson [mailto:dave@lordandson.com]
> Sent: Monday, May 19, 2014 1:55 PM
> To: Michael Brown
> Cc: Steve Christopher; 'Shane George (Sgeorge @soearth.com<mailto:sgeorge@soearth.com>)'; Todd Powell; ‘Donald
Turner (dturner@co.okaloosa.fl.us<mailto:dturner@co.okaloosa.fl.us>)'
> Subject: RE: Abatement Project-Okaloosa County Admin. Building
>
> Michael,
> We have confirmed the information below and would like for you to. proceed with abatement of the additional ACM
prior to breaking down the containment that is currently in place, as this will save time and money. Please let this email
serve as notice of intent for Lord and Son Construction to issue a change order to your subcontract for $3,023.75, and
add 3 days to contract time, for the abatement of additional ACM as detailed below. Let me know if there are any
questions or concerns.
> Thanks,
>
> Dave Burleson
> Project Manager
> [Lord Son Logo Small Format]
> P.O. Box 1808
> Fort Walton Beach, FL 32549
> dave@lordandson.com<mailto:dave@lordandson.com>
> (850) 863-5158 PH
> (850) 862-4904 FAX
>
>
> From: Michael Brown [mailto:aresmbrown@bellsouth.net]
> Sent: Thursday, May 15, 2014 2:13 PM
> To: Dave Burleson
> Subject: RE: Abatement Project-Okaloosa County Admin. Building
>
> Dave,
>
> According to DJ Sacramona who {is the abatement supervisor/competent person for ARES on this project, there is
approximately 72 LF of joint compound/fire stop on the metal deck along walls and 4 areas where it is on ductwork in
Building B and approx. 8 LF of joint compound/fire stop on the metal-deck along walls and 10 areas where it is on
ductwork in Building A. DJ walked through all the buildings and believes this is all of it. | think we should have Shane
George with SES confirm.
>
> If this is.all of it, ARES will abate it for an additional $2,950 plus bond cost ($73.75) = $3,023.75.
>
> Michael J. Brown
> President
> ARES CONTRACTING, INC.
> 5000A Rangeline Road
> Mobile, AL 36619
> 251-379-7038 CELL
> 251-375-2139 OFFICE
> 251-375-2100 FAX
>
> "Seagull, you fly, across the horizon
> Into the misty mornin’ sun
> Nobody asks you where you are going
> Nobody knows where you're from
>
> Now you fly through the sky, never asking why And you fly all around
> 'til somebody, Shoots you down
>
> Seagull you fly, seagull you fly away
> And you fly away today,
> And you fly away tomorrow
> And you fly away, leave me to my sorrow"
>
> For Benjamin Brown, fly free my son, fly free
>
>
>
> "It is better to remain silent and be thought a fool, than to speak up and remove all doubt!"
>
>
> From: Michael Brown [mailto:aresmbrown@bellsouth.net]
> Sent: Wednesday, May 14, 2014 12:48 PM
> To: 'Dave Burleson’
> Subject: Abatement Project-Okaloosa County Admin. Building
>
> See attached pictures of the "joint compound” which appears to have been used as a fire stop between the sheetrock
and metal deck or where ductwork passed through a wall. From what I've been told it tested positive for ACM. Thanks.
>
> Michael J. Brown
> President
> ARES CONTRACTING, INC.
> 5000A Rangeline Road
> Mobile, AL 36619
BASE BID
EXHIBIT 'b"
Report Date: 8/25/2014 4:53 PM
JOB: Okaloosa County Administration Building - Sitework
BID DATE: 28 August 2014
ESTIMATOR: Dale E, Whitaker
BID (TEM OR ALTER: 8B
WTAX- LB PLUGS Status
ISUBS TOTAL (LSG)-——--—__-___ = $0 $0 PLUGS GOOD
$0: $0 $0
$0 $0.
$0 $0
MULTIPLIER - SALES TAX -—— 6.06%
MULTIPLIER - LABOR BURDEN - 45.00%
MULTIPLIER - SUBS ——-——-— 0.00%
BUILDING SF- 0.00)
I
BASE BID
BASE BID
SUB/VENDER QUOTES:
PLUG$
|
DESCRIPTION | SUB/VNDR #1 [
UNADJUSTED COST — $0
< {ORIGINAL 35:
SUBS TOTAL (SG) ——___-________| 0
MATERIAL TOTAL ———-—-__--—_______-} 0
LABOR TOTAL 0
UNADJUSTED COST — o
JADJUSTED SSS
SUBS TOTAL (ACTUAL) ——- 664,383
MATERIAL TOTAL — a
LABOR TOTAL o
UNADJUSTED COST --———--—---—-- =<} 664,383
O&P SEPARATE
16610)
0.02500064)
PLUGS Status
PLUGS GOOD.
CHECK IF DESIGN/BUILD $0.
CONTRACT PRICE $731,114 |
JADJUSTED TOTAL | J
Page 1 of 1
0 0 0 0 $[2}0}
0 0 %00°Sb uapang 1oge]
0 0
0 0 %00'9 XB} S9|es
0 0 0 0
jo 0 00°0 0 00°0 0
0 0 00°0 0 00'0 0 00'0 yuu Jayndwiog Jo} preg wry - Aresoduie |
0 0 00°0 0 00'0 0 00'0 yuu UUIN BU0Ud
0 0 000 0 00'0 0 00° yoke SaOSsEDdy/M BUOYd-
0 0 00°0 0 000 0 00'0 sdiy JeBeuey yoololg - esuadxy jane]
0 0 00°0 0 00° 0 00'0 yuu Jeo yesH-Ajayeg - esuedx3 Bula]
0 0 00'0 0 000 0 00'0 yyuu JW OD - esuedxg BUA)
0 0 00'0 0 00° 0 00'0 uw juepueyuadng - esuedxg Buia
0 0 000 0 000 0 000 yuu JeBeuey] yoa[oig - Juatuasinquiloy ojny|
jo 0 00'0 0 00'0 0 00° qquu Joo UleeH-Ajejes ~ juswiesunquulay oyny|
0 0 00'0 0 00° 0 000 (qua 16 OD - JUsWesINquIsY o}ny
jo 0 000 0 00°0 0 000 yuu Jedng umo} Jo }No - JusWESINq.UIsY SBE)
0 0 000 0 00°0 0 00°0 qyuu juspuejupedng - juowesinquiey ojny
0 0 00'0 0 00'0 0 00°0 yoem (yeam Jed sXepe) seBeueyy yolold
0 0 000 0 000 0 00°0 oom Jeo WeeH-Ajayes|
0 0 00'0 0 000 0 00'0 yeem| JeBeuey joquod Ayjendy
0 0 00'0 0 00°0 0 00'0 yoem juspuayupedng jueysissy
0 0 00°0 0 000 0 00'0 yoam juspuejuyedng|
0 0 0 0 SUOIPUOD [eleues) - | UORISS
[eJOL Joqe] aya [eL9e;e win qns sin yun | juend yond iaseq
syjuoWw Z| 7 SyeOM ZG skep g9¢ uoneing uojonijsucg
syjuow Z) SyIOM ZS skep g9¢ iuoeing 398fo1d
SNOILIGNOS IVWYSNA9
22S) pLozisze : eq
L4o | eBeg
JOHEHUMA “A ele -YOLVINILSA
voz isnBny gz ‘Siva ald
oma} - BuIpjing uoHeysiulWpy Aung esoojeyo ‘aor
£13)
yo
r=13)
09
99
39
99
99
99
09
09
99
09
99
99
99
99
g 40 ¢ o6eq
0 0 00°0 0 (00'0 0 00°0 qol} dn-yooH ue | Bujpioy ft)
0 0 00°0 0 00'0 0 00°SZ1 yuu yue | BuipjoH soyyes - Aresodwel] YS
0 0 (00°0 0 00°0 0 00001 qui (€9 1) }91-0-Hod - Aresodwie|] yd
0 0 (00°0 0 00°0 0 00'Ov yyuus Jayndwiog 19 pie uly - Aeioduiei] YO
0 0 00'0 0 00°0 0 00°09 yuu UU BUOY [[99 - Aresodweif YO
0 0 00°0 0 00'0 0 00'00¢ yoee SELOSSsOoy/M BUOYA-| [199 - Aesodwalf YO
0 0 00°0 0 00°0 0 o0'0sh qu Alyjuoyy euoyd - Areiodwet} YS
0 0 (00'0 0 00'0 0 00°0 wins| dnyooH suoyd - Aesodwel} YO
0 0 00'0 0 00°0 0 00°0SS qns dp JOOH Jomas =P sa}ej4 - Aeiodwai] YO
0 0 00°0 0 00°0 0 00°0S yuu Jeyem - Areiodwelf} uo
0 0 00'0 0 00°0 0 00'0 uuu Jomod {eu|] YO
0 0 00'0 0 00'0 0 00'00S't qns [l0q 4omog jeoujoely - Alelodwiaj] YO
0 0 00'0 0 00'0 0 00'0s) (qu jeooa|y - Aesodwel] Yd
0 0 00°0 0 00°0 0 00°0 uuns| (Kieaap) Xog eBerojs nowy] | YD
0 0 00°0 0 00°0 0 00°0 qquus xog dog e6e10}SF YD
0 0 00°0 0 00'0 0 00'0 qu SOUBUAIULEW| - O21] SOYJO] YO
0 0 00'rrS 0 o0'0S2 0 00°0 uins| sdajg - 19211 BOWO] YO
0 0 00'0 0 00'0 0 (00'002'1 ulns| Ul = Jee, SOYJQ] YO
0 0 000 0 00'0 0 oo'ose (yuu Xe /SOURINSUI/JEIELL SOO] YD
0 0 00'0 0 00'0 0 00'0 wins} ears - Buse} YS
0 0 00'0 0 00'0 0 000 uins| siiog - Suysel] YO
0 0 00°0 0 00°0 0 00°0 uins| ayos0u0g - BuyseL} YO
0 0 00°0 0 00°0 0 00°0 yuu 80}0Ud SUS Gor] YO
0 0 00'0 0 00°0 0 00°0 yore - soyepdn - seinpeyos] YD
0 0 00'0 0 00°0 0 00'0 yore ~ sjeqlul - seinpeyog] YD
lo 0 00'0 0 00°0 0 00'0 dnoy suogmed - jokey] YO
0 0 00'0 0 00'0 0 00'0 Inoy speq Suipiing -ynodeT] YO
0 0 00'0 0 000 0 00'0 dnoy - Aening jeuld] YO
0 0 00°0 0 00°0 0 00°0 dnoy Jofaning -nokey UO
0 0 00'0 0 (00'0 0 00°0 yuu sayddng - esuedxy e0yjo] YO
0 0 00°0 0 (00'000'L 0 00°0 yowe yaidog - B00] YO
0 0 00°0 0 00°02 0 00°0 yoke sWelBolg IU “JEINdWOD - eo] YO
0 0 00'0 0 00'0 0 00'0 uins| 18S Bulppig - soadg 9 sueid] UO
0 0 00'0 0 00'0 0 00'0 uins| soads 9 Sueld| YO
0 0 0 0 SUOHIPUOD [eIeUES - | UOHOES
1230.5 Jogey Nn felsay2 win ang sin wun | juend uondlioseq
7 syjuow |Z} 7 syoom|ZS shepigg¢ ruoleung uoHoONysuOD
sujuow |Z, syoom|ZS shep|gge ruoeing yoefold
SLNAWSYINOAY WHANs9
JOYEPUM “3 O1eC “YO.LVINILLSS
zz:SL pLozise/s|: oed poz isnbny gz ‘aLvad alg
10 L/abed ylomeyls - Buipjing uoBesysiuwpy Ajuno5 esoojeyxo ‘gor
Wd €c:€v L0c/s7/8 ‘OU| ‘UOONysUOD UOS PsO7 jenuapyuog Auedwog
Gyo y abe
0 0 0 0 |e}0}
Q 0 %00'SP ueping Joqe|
0 0
0 0 %00°9 xB} sales
0 0 0 0
0 0 00'0 0 00'0 0
0 0 000 0 00'0 0 00°0SZ wins} s6ulmeig piooey] YD
0 0 00°0 0 00°0 0 00°0 wins| sepeoweg / sesuedxy Ajeyes] UD
0 0 00're 0 00°0 0 00°0 inoy Qib+d9) -ysr1 young] YD
0 0 00°87 0 00'0 0 00°0 sunoy WO! dn-uee| feud] YO
lo 0 00'0 0 00'0 0 000 ybs soles - dn-uee|9 feul4] YS
0 0 00'0 0 00'002 0 00'0 $8em sejqeunsuog/sjoo| FeWS] YO
0 0 00'0 0 00'099 0 00'0 yore ubig gor] uD
0 0 (00'0 0 00'0 0 00'S2z dy pAno og - a}sduing] 4S
0 0 00'0 0 00'0 0 00'0 uuu seg Buypuey levee Yd
0 0 00'09¢ 0 00'0 0 00'0 yeom (pL oyu Op) - Buypuey feuerenp YO
0 0 o0'09e 0 00'0 0 (00'0 eam IWSLS » HALY ye dnuea|y Aieq] YD
0 0 00'0 0 (00'0 0 00°0 sjes ous Jo} seje@ | YO
0 0 00'0 0 00°0 0 00°0 yu] eoued - Areiodwel] Yd
0 0 00°0 0 00°0 0 00°0 wins| wPyosnojul | YO
0 0 00°0 0 00'0 0 00°0 inoy auel - jeuey dinbay YD
0 ( 00°0 0 00'0 0 00°0 yuu wen iy seg | Yd
0 0 00'0 0 00'0 0 00'0 wins} ueW Ng | YO
0 0 00°0 0 00°0 0 00°0 yjutw 199} OF HIUEW - [euey dinbay yD
0 0 00'0 0 000 0 00007 (qu 10 10} S29 | YO
0 0 00'0 0 00'0 0 00'0 wins} wIPHOS NOyU| | YO
0 0 00'0 0 00°0 0 00°0 wquul WPuOS - eyuey dinbaf yO
0 0 00'0 0 00°0 0 00°00r qu 80yyoRd 10} s2) | YO
0 0 00°0 0 00°0 0 00°0 wins| soyyoeg nou | YO
0 0 00°0 0 00'0 0 00'0 (qu soujoeg - jejuey dinba] UD
0 0 00'0 0 00'0 0 00'0 wins| “OSI - [yey dinba] YO
0 0 00'0 0 00'0 0 00°6S qui suowers yseM pueH: Aresodwet] Yd
Wd €2:er Loz/sz/8 “oul ‘UOHONASUOD Ug P1o7 jequepyuog Auedwiog
Okaloosa County Administration Building
Concrete Work
Date: 08/13/2014
SEQ NUM
DESCRIPTION OF WORK
TOTALS
la
GENERAL CONDITIONS
ib
GENERAL REQUIREMENTS
SITEWORK
664,383
CONCRETE
MASONRY
METALS
WOOD AND PLASTICS
THERMAL AND MOISTURE PROTECTION
DOORS AND WINDOWS
FINISHES
10
SPECIALTIES
1
EQUIPMENT
12
FURNISHINGS
13
SPECIAL CONSTRUCTION
14
CONVEYING
15
MECHANICAL
16
ELECTRICAL
17
COMMUNICATIONS
uncategorized =
SUBTOTAL 664,383
~~ fF wf wm 6 8 © HB HH |ABBea lol [oo fees jo, je, fey fel fe] perme jel jm) ley [el Cle] je
LIABILITY INSURANCE 332
CONTINGENCY 23,265
BUILDERS RISK 4,255
TOTAL COST + INSURANCE 692,235
FEE (4.5%) 31,151
TOTAL COST + O&P 723,386
BUILDING PERMIT -
ADD FOR BOND 7,729
CONTRACT PRICE 731,114
BASE BID ExXUTBI ME: Report Date:
