CHANGE ORDER FORM
Date. 8/26/2014 contract No... _€12-1995-FM Change Order No.:_14-04
Owner: __ OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS
Contractor: Lord & Son Construction, Inc.
CHANGE TO CONTRACT PRICE
DESCRIPTION AMOUNT
Original Coniract Price: $ 904,667.00
Net change by previously authorized Change Orders: 908,519.23
Present Contract Price: 1,813,186.23
This Change Order will (add/dedvet): 4,024,754.21
New Contract Price: $5,837,940.44
CHANGE TO CONTRACT TIME
DESCRIPTION DATE or NUMBER OF DAYS
Original Contract Time: TBD TBD
Original Substantial Completion Date: TBD
Net change by previously authorized Change Orders: N/A
This Change Order will (add/deduct}: N/A
New Contract Time: N/A
New Substantial Completion Date: N/A
mt APPROVALS
REQUESTED BY: eh (Sones DATE: & lez(2o 4
PROJECT nae DATE: ele (2oid
en D. EO DATE: 8/26/2014
CONTRACTOR:
OWNER: DATE:
This Change Order is an amendment fo the Contract/Agreement between Contractor and the
Owner, and all other contract provisions shall remain in full force and effect unless specifically
amended in writing, signed by both parties. .
CHANGE OWNER
o
ORDER ARCHITECT o
CONTRACTOR a
FIELD Oo
AIA DOCUMENT G701 (Modified) OTHER oO
PROJECT: Shalimar Courthouse Annex Repurpose CHANGE ORDER NUMBER: _ Four (4)
(name, address) 1250 Eglin Parkway DATE 26 August 2014
Shalimar, FL 32579
TO CONTRACTOR: ARCHITECT'S PROJECT NO: 12009
(name, address)
Lord & Son Construction, Inc. CONTRACT DATE: October 16, 2012
Post Office Box 1808
Fort Walton Beach, FL 32549 CONTRACT FOR: CM @ Risk Services
The Contract is changed as follows:
Additional work to complete sitework, concrete, masonry and structural steel packages; additional work to
remove ACM's that were not discovered during the initial Asbestos Survey; and additional monitoring
required that was not included in original proposal for the existing courthouse structure (see attached
breakdown and Exhibits A - G).
Not valid until signed by the Owner and Contractor.
The original (Contract Sum) Was...........-...00ccccs ces eeecee cee ceeeeeeeeeeeaeeeeeeseeeeressnrennees $904,667.00
Net change by previously authorized Change Orders...............:cccecseeceee $908,519.23
The (Contract Sum) prior to this Change Order was ................c0:0::20ceecee eee eeneeeeeees $1,813,186.23
The (Contract Sum)) will be (increased) by this Change Order in the amount of $4,024,754.21
The new (Contract Sum) including this Change Order will be ............-.0:0:esceeees $5,837,940.44
The Contract Time will be changed by: N/A
The date of Substantial Completion as of the date of this Change Order therefore is: Per Contract
NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized
by Construction Change Directive.
DAG Architects, Inc. Lord & Son Construction, Inc. Okaloosa County BOCC
Architect Contractor Owner
4223 Airport Road Post Office Box 1808 1804 Lewis Turner Bivd., Ste. 100
Destin, FL 32541 Fort Walton Beach, FL 32549 Fort Walton Beach, FL 32547
oot - 2
By. yy, y Py fuk fA By
Chefles W. Clary Ill, FAIA\ Leven D. Lord IF~ Kelly Windes
Architect /; C Hf ob President Chairman
Date: vA Z / Date: 2 ZG f Date: ‘
AIA DOCUMENT G701 » CHANGE ORDER « 1987 EDITION » AIA + 1987 * THE AMERICAN INSTITUTE OF ARCHITECTS
1755 NEW YORK AVE, NW., WASHINGTON, DC. 20006 G701-1987 (Modified)
Breakdown
Change Order 4
Complete sitework, concrete, masonry, and structural steel packages for the new
Administration Building; additional work to remove ACM’s that were not discovered
during the initial Asbestos Survey and additional monitoring required that was not
included in original proposal for the existing Shalimar Courthouse Complex.
Remove 684 SF Carpet and Sheet Vinyl with ACM $__ 1,607.40
Exhibit A Dated May 20, 2014
Remove Additional Joint Compound @ Duct and Decking $ 3,023.75
Exhibit B Dated May 15, 2014
Add 5 Days Abatement Monitoring @ $450/day $ 2,250.00
Exhibit C Dated May 28 and June 24, 2014
Deduct 3 Clearance Tests @ $125/Test $ (375.00)
Exhibit C Dated May 28 and June 24, 2014
Complete Sitework Package $ 731,114.00
Exhibit D
Complete Concrete Package $_ 758,518.00
Exhibit E ;
Complete Masonry Package $1,054,888.00
Exhibit F
Complete Structural Steel Package $1,473,663.00
Exhibit G
Subtotal: $4,024.689.15
Bond - 1% (for Asbestos work only) $ 65.06
Total Change Order4 $ 4,024,754.21
Exist A
TE ORCI IOT TTS
P.O. Box 1808
Fort Walton Beach, FL 32549
dave@lordandson.com
(350) 863-5158 PH
{850) 862-4904 FAX
From: Michael Brown [mailto:aresmbrown @bellsouth.net]
Sent: Tuesday, May 20, 2014 11:06 AM
To: Dave Burleson
Subject: RE: Abatement Project-Okaloosa County Admin. Building
Thank you Dave, we are proceeding with this work.
Also, I just spoke with DJ on the site and they have uncovered 684 SF of sheet vinyl
under carpet that was not within the areas indicated under the base bid. Shane George I
believe has confirmed this.
Using the unit price for the sheet vinyl, 684 SF @ $1.95/SF = $1,333.88 + $273.60
($@.35/SF for carpet removal) = $1,607.48 total add for this additional RACM. Please
review and let me know if we are approved to proceed with this as well.
Thanks again.
Michael J. Brown
President
ARES CONTRACTING, INC.
5000A Rangeline Road
Mobile, AL 36619
251-379-7038 CELL
251-375-2139 OFFICE
251-375-2100 FAX
"Seagull, you fly, across the horizon
Into the misty mornin’ sun
Nobody asks you where you are going
Nobody knows where you're from
Now you fly through the sky, never asking why
And you fly all around ‘til somebody,
Shoots you down
Seagull you fly, seagull you fly away
And you fly away today,
And you fly away tomorrow
And you fly away, leave me to my sorrow”
For Benjamin Brown, fly free my son, fly free
"Tt is better to remain silent and be thought a fool, than to speak up and remove alf doubt!"
Exnai’ B
From: Dave Burleson [iiailto:dave@lordandson.com)
Sent: Monday, May 19, 2014 1:55 PM
To: Michaei Brown ‘
Cc: Steve Christopher; 'Shane George (sgeorge@soearth.com)'; Todd Powell; ‘Donald Turner (dturner@co.okaloosa_fl.us)
Subject: RE: Abatement Project-Okaloosa County Admin. Building
Michael,
We have confirmed the information below and would like for you to proceed with abatement of the additional ACM
prior to breaking down the containment that is currently in place, as this will save time and money. Please tet this email
serve as notice of intent for Lord and Son Construction to issue a change order to your subcontract for $3,023.75, and
add 3 days to contract time, for the abatement of additional ACM as detailed below. Let me know if there are any
questions or concerns.
Thanks,
Dave Burleson
Project Manager
COREE INE
P.O. Box 1808
Fort Walton Beach, FL 32549
dave@lordandson.com
(850) 863-5158 PH
(850) 862-4904 FAX
from: Michaei Brown {maiito:aresmbrown@beilsouth.net]
Sent: Thursday, May 15, 2014 2:13 PM
To: Dave Burleson
Subject: RE: Abatement Project-Okaloosa County Admin. Building
Dave,
According to DJ Sacramona who is the abatement supervisor/competent person for ARES on
this project, there is approximately 72 LF of joint compound/fire stop on the metal deck
along walls and 4 areas where it is on ductwork in Building B and approx. 8 LF of joint
compound/fire stop on the metal deck along walls and 1@ areas where it is on ductwork in
Building A. DJ walked through all the buildings and believes this is all of it. I think
we should have Shane George with SES confirm.
Lf this is all of it, ARES will abate it for an additional $2,95@ plus bond cost ($73.75)
= $3,023.75. ‘
Michael J. Brown
President
4 RES CONTRACTING, INC.
5000A Rangeline Road
Mobile, AL 36619
251-379-7038 CELL
251-375-2139 OFFICE
251-375-2100 FAX
esi
MELB.
SOUTHERN €ARTH SCIENCES, INC.
a ae
“Se
Southern Earth Sciences, Inc.
P.O. Box 160745
Mobile, AL 36616-1745
251-445-4354
LORD & SON CONSTRUCTION, INC
P.O. BOX 1808
FORT WALTON BEACH, FL 32549
DAVE BURLESON
Se wey
(| orostS
\ Yat Sel
Invoice number P140057A-02
Date 05/28/2014
Project P14-0057A SHALIMAR ANNEX -
ABATEMENT
For Professional Services provided through May 28,2014
SUBCONTRACT 1217SC04
Cost Code 01054-S
INVOICE FROM 4/1/14 TO 5/27/14
A. Abatement Monitoring; 16 days @ $ 450/day $ 7200.00
(5/5/14 to 5/27/14)
B. Clearance Testing by TEM;
Three samples @ $ 125/each $ 375.00
Current
Description Billed
SHALIMAR ANNEX - ABATEMENT 7,575.00
Total 7,575.00
Invoice total 7,575.00
All charges are due and payable 15 days following the date of this invoice, unless otherwise arranged. A periodic rate of 1.5%
monthly, as a finance charge, will be added on the balance over 30 days. This isan ANNUAL PERCENTAGE OF 18 PERCENT. You
will be responsible for the payment of a reasonable Attorney’s fee and ail expenses we may incur in connection with the collection of
this obligation.
Please Remit Payment to: P.O. Box 160745, Mobile, AL. 36616 Ph 251-445-4354
*“"We accept Master Card, Visa, and American Express***
LORD & SON CONSTRUCTION, INC
Inveice number P140057A-02
Page 1
Invoice date 05/28/2014
yalin ae
uf
F/1INS prog § 6616
amet yd?
SOUTHERN EARTH SCIENCES, INC. —
VAL so
SE Ee”
Southern Earth Sciences, Inc.
P.O. Box 160745
Mobile, AL 36616-1745
281-445-4354
LORD & SON CONSTRUCTION, INC Invoice number P140057A-03
P.O, BOX 1808 Date 06/24/2014
FORT WALTON BEACH, FL 32549
DAVE BURLESON Project P14-0057A SHALIMAR ANNEX -
ABATEMENT
For Professional Services provided througt. June 24,2014
SUBCONTRACT 1217SC04
Cost Code 01054-S
INVOICE FROM 5/28/14 to 6/42/14
A. Abatement Monitoring; 9 days @ $ 450/day $ 4050.00
(5128/14 to 6/12/14)
B. Clearance Testing by TEM;
Four samples @ $ 125/each $ $00.00
Current
Description Billed
SHALIMAR ANNEX - ABATEMENT 4,550.00
Total 4,550.00
Invoice total 4,550.00
All charges are due and payable 15 days following the date of this invoice, unless otherwise arranged. A periodic rate of 1.5%
monthly, as a finance charge, will be added on the balance over 30 days. This is an ANNUAL PERCENTAGE OF 18 PERCENT.
You will be responsible for the payment of a reasonable Attorney's fee and all expenses we may incur in connection with the
collection of this obligation.
Please Remit Payment to: P.O. Box 160745, Mobile, AL. 36616 Ph 251-446-4354
*We accept Master Card, Visa, and American Express***
LORD & SON CONSTRUCTION, INC Invoice number P140057A4-03 Invoice date 06/24/2014
Dave Burleson
From: sgeorge@soearth.com
Sent: Monday, May 19, 2014 8:10 AM
To: Dave Burleson
Ce: Steve Christopher
Subject: RE: FW: Abatement Project-Okaloosa County Admin. Building
I have checked all of the measurements and they are accurate. The samples that I took in Building A confirmed
the duct mastic material was asbestos. I have told DJ that the material needed to be removed in both the
southern portion of building B and all off building A.
Shane
woseesene Original Message ---------
Subject: FW: Abatement Project-Okaloosa County Admin. Building
From: "Dave Burleson" <dave@lordandson.com>
Date: 5/15/14 12:18 pm ,
To: "Shane George (sgeorge@soearth.com)" <sgeorge@soearth.com>
Ce: "Steve Christopher" <steve@lordandson.com>
Shane,
Would you please confirm the statements below and respond back to me?
Thanks,
Dave Burleson
Project Manager
[Lord Son Logo Small Format]
P.O. Box 1808
Fort Walton Beach, FL 32549
dave@lordandson.com<mailto:dave@lordandson.com>
(850) 863-5158 PH
(850) 862-4904 FAX
From: Michael Brown [{mailto:aresmbrown@bellsouth.net]
Sent: Thursday, May 15, 2014 2:13 PM
To: Dave Burleson
Subject: RE: Abatement Project-Okaloosa County Admin. Building
_ Dave,
. According to DJ Sacramona who is the abatement supervisor/competent person for ARES on this
project, there is approximately 72 LF of joint compound/fire stop on the metal deck along walls and 4
1
Dave Burleson
caaeneuens
From: : Shane George <sgeorge@soearth.com>
Sent: Tuesday, May 20, 2014 11:38 AM
To: Dave Burleson
Subject: Re: