TASK ORDER APPROVAL FORM CONTRACT #:C22-3246-WS TASK ORDER #: 8 TASK ORDER AMOUNT: $235,780 OFFERED BY CONSULTANT: Jacobs Engineering Group Inc. FIRM'S NAME Scott Jernigan REPRESENTATIVE'S PRINTED NAME ST SIGNATURE Principal Project Manager 9/5/2024 TITLE DATE RECOMMENDED FOR APPROVAL (Department Director) Michael Hackett SIGNATURE email=mhackett@myokaloosa.com, c=US Date: 2024.09.06 15:34:59 -0500" Michael Hackett, Water & Sewer Director TITLE DATE Digitally signed by John Hofstad John Hofstad vaie-5024.00.10 10:46:56 -05'00" COUNTY ADMINISTRATOR (if applicable) DATE Revised January 21, 2020 APPROVED BY OKALOOSA COUNTY (Per Purchasing Manual) Table 1 H Digitally signed by DeRita DeRita Mason Date: 2024.09.10 Mason 06:59:53 -05'00' PURCHASING MANAGER DATE Digitally signed by Faye Faye Douglas Date: 2024.09.10 Douglas 10:11:10 -05'00" OMB DIRECTOR/DATE DATE CHAIRMAN (if applicable) DATE CONTRACT #C22-3246-WS Task Order 08 THIS TASK ORDER IS ISSUED PURSUANT TO THE AGREEMENT FOR CONSULTING SERVICES DATED SEPTEMBER 28, 2022, FOR THE BOARD OF COUNTY COMMISSIONERS OF OKALOOSA COUNTY, FLORIDA, WHICH IS INCORPORATED HEREIN BY THIS REFERENCE, WITH RESPECT TO: Shoal River Ranch Well Design, Permitting, Bidding, and Construction Services Article A. Purpose Introduction The Board of County Commissioners of Okaloosa County (the “COUNTY”) Water and Sewer Department provides drinking water to customers throughout the unincorporated areas of Okaloosa County through groundwater wells located throughout the county. Within the County’s mid-county service area, the COUNTY has six (6) wells which supply drinking water to customers around Crestview in addition to supplementing supply in the south end of the county (Garnier and County West service areas). Due to the increase in water demand in the COUNTY’s service area, a new groundwater production well (well) is needed. The COUNTY has identified the Shoal River Ranch area as the location for the proposed well. This task order (TO) was requested by the COUNTY for Jacobs Engineering Group Inc. (Jacobs) to complete the design, permitting, bidding services, and construction services for the Shoal River Ranch (SRR) Well. Article B.Scope of Services Task 1 - Project Kickoff Meeting, Site Visit, and Data Collection and Evaluation Jacobs will attend a project kickoff meeting with COUNTY staff at the COUNTY office. The purpose of this meeting will be to introduce key project team members from each organization and to discuss and gain alignment on various topics, including but not limited to the following: e Scope, procedures, and schedule for well design and wellhead design e Site access and security e Procedures for coordination among project team members e Project deliverables Following the kickoff meeting, Jacobs staff will visit the well site to collect information relevant to the well and wellhead design. As part of Task 1, Jacobs will also review existing data and reports and other information relevant to the design of the SRR Well. Data evaluation will include the review of existing water quality data, geophysical logs, well and aquifer performance testing, well completion reports, and previous reports and designs prepared by others. Jacobs will coordinate an additional meeting between FPL, COUNTY, and Jacobs to discuss power supply and delivery to the SRR Well site. Deliverables Electronic portable document format (pdf) version of the kickoff meeting agenda, and summary. Meetings One kickoff meeting at the COUNTY office attended by four Jacobs staff. One meeting at site attended by up to two Jacobs staff. Assumptions 1. The COUNTY will provide all well data, reports, and other information to support the well design within 15 working days of notice-to-proceed (NTP) issuance. 2. The COUNTY will assign a project manager to be responsible for timely coordination and decision making, as well as providing unified COUNTY direction. 3. Four Jacobs staff members will attend the kickoff meeting which will be followed by a site visit on the same day, which is assumed to last approximately 2 to 4 hours. 4. The kickoff meeting will be held at the COUNTY office. Task 2 - Permitting and Well Completion Report The scope of services for this task includes permitting assistance for the construction of the SRR well and preparation of the final well construction and testing report. Jacobs will perform the following services as part of this task: Onsite meeting with the Northwest Florida Water Management District (NWFWMD) for final approval of the new well location within the existing property and to discuss the well construction and testing approach. The onsite meeting will include up to two (2) Jacobs staff and last approximately 1 hour. As required by the NWFWMD, Jacobs will prepare a construction and testing plan for the SRR well that outlines the approach and key features of the well construction. It is expected that the key features of the plan will include the general construction/testing approach, well construction details, and testing requirements. The construction and testing plans will serve as the “roadmap” for executing the construction portion and will be used as the basis for the overall well design and construction. Jacobs will provide an electronic copy of the draft plan to the COUNTY for review prior to finalizing and submitting the plan to NWFWMD. Jacobs will prepare a hydrogeologic and engineering report following completion of the SRR well. The report will summarize regional and local hydrogeologic conditions, well construction details, well and aquifer test procedures and results, and water quality sampling results during and after well construction. Permitting assistance and one response for the permit application to a request for additional information from each agency will be provided for the following activities: - Assist the COUNTY’S well drilling contractor in preparation of the water well construction permit, including the preparation of applications, exhibits, drawings, and specifications as necessary for the well construction permit application. - Prepare the Florida Department of Environmental Protection (FDEP) Public Drinking Water Facility Construction Permit application for the supply well, wellhead, and raw water piping. Jacobs will attend one meeting with FDEP staff, if necessary. - Assist COUNTY in obtaining the FDEP Certificate of Completion (COC) for the well, wellhead, raw water piping by preparing the FDEP COC. - Jacobs will respond to RFIs from FDEP and attend one FDEP field inspection, if required. Deliverables Onsite meeting minutes Draft and Final Well Construction and Testing Plan FDEP Public Drinking Water Facility Construction Permit Application for review by COUNTY and submittal to FDEP FDEP COC Application for review by COUNTY and submittal to FDEP Okaloosa County Growth Management Department Permits Application for review by COUNTY and submittal to Okaloosa County Growth Management Department Draft and final Well Construction and Testing Engineering Report Copies of all relevant correspondence related to this task Meetings Up to two Jacobs staff will attend one onsite meeting with NWFWMD and the COUNTY. One meeting with FDEP for the Public Drinking Water Facility Construction Permit Application One field inspection with FDEP for COC, if required Assumptions 1. Well siting services are not included as part of this scope. It is assumed that the new well will be located on the COUNTY identified project site. 2. Proposed well location, as presented to NWFWMD and FDEP by COUNTY and Jacobs, will be accepted by NWFWMD and FDEP for construction of the supply well. If the well site requires relocation, additional fee may be required. 3. Any private well location information will be provided by the COUNTY. Private well mitigation services are not included. 4. The SRR well is included in the COUNTY’s Water Use Permit (WUP) as Facility ID# MC-8 and therefore the existing WUP does not require modification. 5. No groundwater modeling is required. 6. This project will not impact jurisdictional wetlands. No wetland delineation or mitigation services are included as part of this scope of services. If any wetland delineation or mitigation is required, additional compensation to Jacobs will be required, or the COUNTY will provide the environmental services. 10. 11. Environmental Resource Permitting is not included in this scope of services, but can be provided as an additional service, if required. A protected tree inventory of the well site will not be required. Project does not require submittals to, nor approval of, the Okaloosa County Development Review Committee. Engineering report will be delivered electronically in pdf format. The COUNTY will provide review of the draft engineering report and will provide comments to Jacobs. Task 3 - Production Well Design Services Task 3 describes design services that will be provided for the well construction and testing. Jacobs will prepare the contract documents that contain the well construction, drilling and testing plans and technical specifications to be used for constructing the SRR well. Jacobs’s scope of services for this task is as follows: Prepare plans and technical specifications for the construction and testing of one 18-inch diameter Floridian aquifer production well. Targeted design flow for the new supply well will be 1,000 gallons per minute (gpm) or 1.44 million gallons per day (mgd). Prepare the bid table for the COUNTY to insert into a COUNTY bid form. The bid table will be prepared and delivered in Microsoft Excel. The well construction and testing plans and specifications will be packaged as a separate construction package for the COUNTY to procure a well drilling construction contractor. Submit a review set of the drilling and specification package to COUNTY for review. Incorporate review comments into drilling and specification package. Jacobs will provide an opinion of probable cost for the construction and testing of the production well. Deliverables Draft well construction and testing plans and specifications, and bid table at 30 percent completion (3 full size plans and pdf format) Draft well construction and testing plans and specifications, and bid table at 60 percent completion (3 full size plans and pdf format) Draft well construction and testing plans and specifications, and bid table at 90 percent completion (3 full size plans and pdf format) Final well construction and testing plans and specifications, and bid table at 100 percent completion (3 full size plans and pdf format) Copies of correspondence related to this task Meetings A 90% review meeting will be held at the COUNTY office and attended by up to three Jacobs staff, which is expected to last up to 2 hours. Assumptions 1. The SRR Well will be designed with approximately 100 feet of 24-inch surface casing and approximately 400 feet of 18-inch diameter final casing. Actual casing depths will be determined in the field and will be based on site-specific conditions encountered during drilling. The target capacity of the well will be 1,000 gpm, depending on the final pump and size selected; however, the specific and characteristics of the aquifer will influence the final capacity of the well. 2. The well will be located on the COUNTY identified property. 3. The COUNTY will review the draft 90 percent well design package and provide review comments to Jacobs. 4. The COUNTY will provide front-end contract documents for the plans and technical specification package produced by Jacobs and assembly final bid package. Task 4 - Wellhead Design Services Jacobs will provide design services for the SRR well wellhead and raw water piping, wellhead appurtenances, onsite building, electrical, instrumentation, and control (1&C), and site work construction package. Jacobs’s scope of services for this

Download this text file with its original spacing ↓