The Hatch Mott MacDonald Team has prepared a
standpoint. This Team will also assess the existing projected timeline of general activities to
facilities from the perspective of necessary accomplish the specified tasks outlined in the
modifications ( i. e. plant decommissioning, scope of services and described herein in order to
sprayfield decommissioning, County tie -ins, etc.) meet the specified milestone event dates outlined
should the City elect to consider further the in Section 3F of the Request for Proposals
possibilities of joining the County's Wastewater
Treatment System. With proper attention on the part of the City,
County, and the Project Team, the following
While these evaluations are being run concurrently, schedule can be accomplished:
Mr. Goin will be coordinating with the Financial
Team. The Financial Team will perform the
necessary cost/benefit analysis and rate
Februaa 12, 2008 Sta Recommendation to City Council
Gather/Dispense all Available Data to Team
Conduct Team Reviews on All Available Data
Project Team Prepares Memorandum ofAdditional Information Needs to Both City and
CounLy
February 29, 2008 Notice to Proceed rom City
March 3, 2008 Pro 'ect Kick -O Meetin
March 4, 2008 Begin Concurrent Review ofOkaloosa Agreement and Current City Ex anion Plans
March 10, 2008 County Provided
All Requested Information of CitylCounty
City/
March 17, 2008 Meeting/Phone Conference with City staff to discuss issues / tndin s
March 21, 2008 Complete Initial Assessment of Okaloosa Agreement and Current CiLy Ex ansion Plan
March 24, 2008 Meet with City to Discuss Prelimina2 Findings with Interlocal A reement
March 27, 2008 Meet with Ci Lc_
ounty to Discuss Proposed Interlocal A reement
March 31, 2008 Submit Prelimina2 Assessment Report
April 4, 2008 Receive Ci Direction on Continued Pursuit /Evaluation o Okaloosa A reement
April 11, 2008 Telephone Conference with City Discuss Issues/Findings)
April 18, 2008 Telephone Con erence with Ci Discuss Issues/Findings)
April 25, 2008 Refine and Complete Comprehensive Reviews of Options to " Stay the Course" versus
Join the Coun "
A ril 29, 2008 Meet with County and City to Review Draft Agreement Modi ications
April 30, 2008 Present Final Drat Report to Sta
Ma 6, 2008 Receive Commenisfrom City Staffon Drat Report
M21 13, 2008 Present Final Report to City Commission
Wastewater Treatment Evaluation 13
For The City ofFort Walton Beach
TWWOPUBO01
Hatch Mott
Experience
P with municipal
p type
a services
MacDonald
Section 6 - Experience with municipal type services
Municipal Wastewater Management
Innovative, fast track and cost -effective ideas are the basis of the firm' s project management approach. Work has
included extensive modifications, expansions and upgrades, as well as design of new facilities and retirement of old
facilities. All aspects of wastewater management are addressed from day -to -day consultation to all phases of project
development and execution.
General Municipal Utility Services,
011, of pallaina 011
Although the City of Panama City elected several years ago to advertise
all of their municipal engineering projects, as opposed to selecting a
general engineering consultant, Hatch Mott MacDonald has been
successful in being selected and performing many of the City's utility
projects over the past five years. Since opening our Panama City office
in October of 20001 we have performed studies such as the
Inflow /Infiltration study for the City's Millville sewer service area and
the water /sewer service evaluation of the Lisenby Avenue, Old Forest
Park, Pretty Bayou, and Kings Point service areas. In addition, HMM
has performed services for the evaluation of retrofitting and/ or
reconstructing several of the City's major sewer lift stations and
ultimately prepared construction bid documents and assisted in the
construction of these improvements. Other services have included
assistance with maintenance of the City' s wastewater treatment systems
facilities. A list of successful projects include:
Lift Station 41 Renovations
Token Road
St. Andrews WWTF Influent Screens
Wilson Avenue
I/I Study (Millville Service Area)
Lift Station 44
Lisenby Avenue Water /Sewer
Water /Sewer Service Area Evaluation (Lisenby, Old Forest
Park, Kings Point, and Pretty Bayou)
Lift Station 75
Repair Sewer Lines Millville Area
30th Ct. Utilities
19th Street Improvements
Contact Information
City of Marianna
Mr. Ron Morgan
City Manager
850. 526. 3801
Wastewater Treatment Evaluation 14
For The City ofFort Walton Beach
TWWOPUBO01
Hatch Matt
FAM_
MacDonald Experience with municipal type services
General Municipal Utility Services,
City of M
' arianna
Hatch Mott MacDonald has provided general municipal engineering
services for the City of Marianna since opening its Panama City office
in 2000. Our services have included evaluations and studies, as well as
final design and construction implementation of many projects for the
Public Works Department
Contact Information
City of Marianna
Mr. Joe Richey
Public Works Director
850. 526. 3801
City of Panama City Beach Sewer Modeling
Panama Qy Beach, Florida
HMM was tasked to add remaining pumping stations ( 20 +) to an
existing SewerCad sanitary sewer model for the City of Panama City
Beach. Addition of all gravity sewer and setting up the model to run as
an extended period simulation. The tasks involved data collection,
verification and input for the various model components. The current
model contains 82 miles of pressure force main, 23 miles of gravity
sewer, and 93 pumping stations.
Contact Information
City of Panama City Beach
Mr. Al Shortt, PE
City Engineer
850. 233 -5116 ext. 2404
General Municipal Utility Services,
Cite of'.ilarl F.sther
Hatch Mott MacDonald has provided general municipal consulting
services to the City of Mary Esther since opening its Panama City office
in 2000. Services provided have included an assortment of tasks for the
Water and Sewer Utility Departments. The following projects have
been completed or are currently ongoing under this contract:
Construction Management —City in -kind Sewer Replacement
Project
Library addition civil site design
Disinfection By-products monitoring plan
Assistance with Sewer Consent Order Milestones
Design/ Construction Management of Lift Station No. 6
Sewer Rehabilitation —Oak Tree Park/Mary Esther Heights
Subdivision
Potable Water Well No. 4 Treatment Options
Rosewood Subdivision Water Project
WWTP Upgrade
WWTP Permit Renewal Assistance
Contact Information
City of Mary Esther
Mr. John Lulue
City Manager
850.243. 3566
Wastewater Treatment Evaluation 15
For The City ofFort Walton Beach
TWWOPUBO01
Hatch Mott
FAMN.-Is MacDonald Experience with municipal type services
City of Panama City - Pretty Bayou /Old Forest Park Sewer
Panama City, I l'orida
Analysis and design of gravity sewer system to serve approximately
365 single -family homes in fully developed older neighborhoods in the
City of Panama City, Florida. The project involved four (4) new
pumping stations, replacement of one ( 1) existing pumping station, and
approximately eight ( 8) miles of gravity sanitary sewer.
Contact Information
City of Panama City
Mr. Ron Morgan
Director of Utilities
850. 872. 3000
Mary Esther Wastewater Treatment Facility
alary Esther, Florida
The City of Mary Esther Wastewater Treatment Facility was placed into
operation prior to 1950. Over the years, two significant upgrades were
made, with the last major upgrade in 1992. The existing Mary Esther
WWTF is permitted for 1. 1 million gallons per day ( MGD). Due to the
age of the facility, especially the equalization tanks and conventional
activated sludge treatment plant, difficulties have been encountered for
operational staff during high flow conditions. Considering the
occasional high flow conditions and to increase the operational
flexibility and reliability of the WWTF during the high flow conditions,
the City has retained the services of Hatch Mott MacDonald to provide
engineering services to upgrade its WWTF.
The proposed upgrade, once completed, will add approximately 0. 3
MGD biological treatment capacity. The process train for the upgraded
Mary Esther WWTF will include screening, flow equalization, brush
aerator type oxidation ditch, clarifier, chlorine disinfections, aerobic
biosolids digestion, and plastic media drying beds.
Contact Information
City of Mary Esther
Mr. John Lulue
City Manager
850.243. 3566
City of Marianna - Sunland / Industrial Park Sewer System
Alurirann a, ] gorilla
HMM was retained by the City of Marianna to evaluate the sewer
system from the Marianna Industrial Park area to the Wastewater
Treatment Facility. The study area, referred to as the
Sunland/ Industrial Park Sewer System," was constructed during three
periods of time. The initial construction provided service to Graham
Air Force Base ( currently Sunland Training Center), the second