READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 02-12-08 regular agenda — reading text
Part 29 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-15293-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
For The City ofFort Walton Beach
TWWOPUBO01
Hatch Matt
F
AMim-P MacDonald
Past Performance
Section 3 - Past Performance
Introduction
Wastewater management has been a cornerstone of our engineering practice since the firm was founded. Work in this
area has contributed to our success and reputation for outstanding performance ever since.
Experienced professional resources are available to meet client objectives, whether the need is immediate and specific
or complex and long -term, project -based or annual consulting agreements. Wastewater staff includes civil,
environmental, process, electrical, instrumentation, structural and mechanical engineers, building designers, CAD
operators, drafters, surveyors and construction inspectors, who are supported by other members of the firm as the
project requires. Highly qualified professionals and staff are specifically trained in the investigation, analysis,
rehabilitation and management of underground utilities including sanitary and combined sewers. As a
multidisciplinary firm, environmental scientists, hydraulic engineers, hydrogeologists and computer support services
are available to facilitate resolution of related issues that may arise on any project.
The firm is typically involved in all aspects of wastewater management, including day -to -day consultation,
troubleshooting, plant evaluation, initial planning and feasibility studies, preliminary and final design, preparation of
plans, specifications and bid documents, bid evaluation, contract administration, construction phase engineering
services, plant start-up, operator training and contract operations through Hatch Mott MacDonald Operation Services,
Inc.
Project management capabilities encompass extensive experience in grant and funding assistance, preparation of
permit applications, review of NPDES permit provisions and negotiations with governmental agencies regarding
permits and administrative consent orders, expert testimony, report and operating manual preparation, training and
start-up. In addition, the availability of inspection and field personnel makes it possible for most project aspects to be
undertaken in- house. This allows the advantages of close personal communication between project managers and
staff, as well as, Project Managers and clients, key factors in successful project implementation.
We enjoy an excellent reputation for successfully completing projects on time and within budget. All projects receive
the same close, personal service and attention to detail from the firm' s staff. The high level performance of the firm is
reflected in the record of its continuous engagement as Consulting Engineer for many clients - some for decades. The
firm' s excellent record of low construction cost overruns on completed projects is indicative of the staff's experience
and attention to detail - a most important but often overlooked qualification.
Over the past five (5) years, the Hatch Mott MacDonald team has completed many important municipal wastewater
projects covering many aspects that will be relative to the City of Ft. Walton Beach's proposed assignment, but the
following three projects are most representative of the types of services and expertise that will most benefit the City.
The City of Marianna project is unique in that during the planning phases
of that project, many of the same issues were being addressed including
growth projections, capacity analysis and, ironically, work with Jackson
County, whom themselves were faced with a decision to either build a
separate plant and pull out of the City System or stay with the City who
was in the process of expanding their facility. Hatch Mott MacDonald
engaged Public Resources Management Group ( PRMG) on this
assignment also. Ultimately, the studies and rate evaluation led Jackson
County to a decision to continue to pump their sewer to the City of
Marianna. The projects contained in this section for the Escambia County
Wastewater Treatment Evaluation
For The City ofFort Walton Beach
TWWOPUBO01
Hatch Mott
MacDonald
Past Performance
Utility Authority and the City of Tallahassee are also representative of major studies and project implementation
assignments related to the complete relocation of the downtown treatment plant in the case of Escambia County and a
Master Sewer Plan Study for the City of Tallahassee.
The Escambia County project required substantial study of cost impacts, considerations for decommissioning of the
old plant and many phases of implementation which have provided us with a good basis for recent bid costs. The City
of Tallahassee project incorporated a total evaluation of the City's existing system and preparation for a move into a
second phase that will incorporate growth projections and systematic plans to accommodate such growth.
The project descriptions of these referenced projects are as followed:
Marianna Wastewater Treatment Facility Upgrade
11arianna, Florida
In 2001, HMM was selected by the City of Marianna to upgrade its
existing facility from 2. 7 MGD to 4.0 MGD. The key components of
the project include a new plant pump station, headworks facility,
including influent screening and degritter, CarrouselTM oxidation
ditches, clarifiers, 10 miles of 30 -inch treated effluent force main, and a
960 -acre sprayfield.Existing structures were utilized, in addition to
existing sludge handling components, to enhance sludge treatment as
Class B" sludge. The project also included the construction of a new
operations building, new chlorine dosing facility, and back -up generator
power.
This project represents the largest single project the City of Marianna
has ever undertaken with total costs near $ 27 million. The project
received funding assistance through the Florida Department of
Environmental Protection's Small Disadvantaged Community Grant
Program, the Community Development Block Grant Program, and
FDEP' s State Revolving Grant/ Loan Funding Program. HMM provided
assistance to the City in helping to secure these funds and also provided
a Water and Wastewater Study through its financial subconsultant
Public Resource Management Group) to assist in evaluating the rate
structure adjustments the City would need to implement to fund the
project.
The project is currently under construction with an anticipated
completion date in late 2008.
Contact Information
City of Marianna
Joe Richey
City Manager
850. 526. 3801
Wastewater Treatment Evaluation
For The City ofFort Walton Beach
TWWOPUBO01
Hatch Mott
MacDonald
Past Performance
Main Street Wastewater Treatment Plant Relocation
Esc ambia County, Florida
Regional wastewater and water supply authority for Escambia County,
Florida. HMM' s has provided continuous water and wastewater
consulting engineering services to ECUA for over 20 years as the
authority' s Principal Consulting Engineer.
HMM' s role included land surveying, design, construction documents,
regulatory permitting, and contractor prequalification for 22 miles of
16 " -48" DIP force main and 24 " -36" effluent pipelines in urban to rural
areas. This included public streets and cased Jack and Bore crossings of
railroads, state and interstate highways. Project also included 3-
wetwellldrywell pump stations with dry pit VFD Sub. Pumps. Pump
stations have architectural buildings.
Project is currently approaching 80% design for construction- contract
bidding in summer 2007 and completion of construction and facilities
begin by fall 2009. The total construction cost is $ 316m.
Contact Information
96&
t, Mr,.R tt.1 COAST
UTILITIES AUTHORITY
ECUA
Steve Sorrell
850- 969 -3300
City of Tallahassee Sewer Masterplan
Tallahassee, H' 1,
The 201 Facilities Plan was performed in 1977 and was utilized to
qualify the City of Tallahassee for federal grants to construct
wastewater treatment facilities. The project looked at infiltration- inflow,
performed an environmental inventory and presented a detailed
technical comparison and cost effective analysis of various treatment
and disposal options. The report recommended a spray irrigation facility
in the southeast along with a new treatment plant in the northeast.
In 1986, an evaluation of the options available to replace the concrete
trunk was performed. A determination of the capacity of the main lines
serving the northeast was made along with a recommendation for
replacing the concrete trunk, upgrading Springhill Road Pump Station
and Pump Station No. 12.
The 1988 Master Sewer Plan looked at the overloaded interceptor
system and plant capacity vs. flows to the year 2010. The report
recommended a new force main along Capital Circle to serve the
northeast. A 7. 5 MGD expansion to the T.P. Smith Wastewater
Treatment Plant was recommended along with other interceptor
improvements.
Wastewater Treatment Evaluation
For The City ofFort Walton Beach
TWWOPUBO01
Hatch Mott
MacDonald
Past Performance
r
In 1992, an update to the Master Sewer Plan was initiated. It looked at
several options for the NE wastewater treatment plant service area. It
also evaluated treatment and disposal options for the NE plant. The
study also performed preliminary design for sewering eight unsewered
areas. The City and County could not agree on a policy regarding septic
tanks and the project was terminated
In 2005, a master sewer plan was started. It is only looking at the
sewage collection system, including pump stations. Phase I is the
development of a computer simulation model that will be used in
developing the master plan.
Contact Information
Mr. Jim Oskowis, P.E.
Manager
Water Utility
300 S. Adams St
Tallahassee, Florida
Active contracts with Okaloosa County
HMM' s Pensacola office currently has a contract with Okaloosa County. However, it is in a different department than
the Water /Sewer Department. The active contract is as follows:
2nd
Name of Project: Street Drainage Improvements
Scope of service: The project consists of construction of an underground stormwater drainage system from Sixth
Avenue going south for 1, 500 liner feet to a natural drain outfall located between Second and Third Avenue. The
project includes the removal of existing pavement and structures, installation of drainage pipe and structures, and the
reconstruction of the roadway.
HMM Services: Environmental, surveying, design and contract management services according to federal, state and
county guidelines.
Total Project cost: $ 498, 868. 00
Expected Completion Date: December 2008
Wastewater Treatment Evaluation