READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 02-12-08 regular agenda — reading text
Part 24 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-15293-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
for Proposal 08 -109
Proposers must submit a Statement of Understanding which clearly details their level
of comprehension ofthe tasks detailed in this proposal. Proposers should be detailed
on their level of experience in similar work and the knowledge it has provided them-
6. 5. 10 Any other information which the proposer believes will assist the City in making its
selection.
7. EVALUATION OF PROPOSALS:
7. 1 An evaluation committee will be established to review and evaluate each proposal. The
information provided in response to paragraphs 6. 5. 1 through 6. 5. 10 will be rated, utilizing a
system. Proposers may be required to make a brief presentation to City staff and/ or City
Council subsequent to which a short list will be developed from' such ratings.
7.2 Proposers may be ranked for inclusion on a short list. IF so, proposers selected for the short
list may be required to mare a brief (15 to 20 minutes) oral presentation to the City Council
in open session for final selection. The proposer should be prepared to discuss, at a
minimum, the items presented in paragraphs 6. 5. 1 through 6.5. 10, as well as any related
issues as may be posed by the City Council or City Manager.
Note: Proposers selected to make presentations will be notified in writing in advance
of the presentation date. At the end of the presentation the City may rank, in order of
preference, the top three (3) firms.
8. SELECTION OF PROPOSALS:
Negotiations may be conducted with the top ranked firm(s). Ifno agreement can be reached with
the top ranked firm, that firm shall be dismissed and the City shall proceed with discussions with
the second firm. The procedure may be repeated as many times as necessary until an agreement
can be negotiated that is satisfactory to both parties.
9. DISCUSSIONS WITH RESPONSIBLE PROPOSERS AND REVISIONS TO
PROPOSAL:
Discussions may be conducted with responsible proposers who submit proposals determined to
be reasonably acceptable ofbeing selected for award for the purpose ofclarification and to assure
full understanding of, and responsiveness to, the solicitation requirements. Proposers shall be
ity for discussion and revision of
accorded fair and equal treatment with respect to any opportunity
proposals and such revisions may be permitted after submission prior to award for the purpose of
obtaining best and final offers. In conducting discussions, there shall be no disclosure of any
information derived from proposals submitted by competing proposers except as may be required
by the Florida Public Records Law, Chapter 119, Florida Statutes.
Purchasing Department Page: 14
Engineering Services for Wastewater Treatment Evaluation Request for Proposal 08 -109
10. OUESTIONS REGARDING SPECIFICATIONS OR PROPOSAL PROCESS:
10. 1 To ensure fair consideration for all proposers, the City prohibits communication to or
with any department, bureau or employee during the submission process, except as
provided in paragraph 10. 5. Additionally, the City prohibits communications initiated by
a proposer to the City Official or employee evaluating or considering the proposals prior
to the time an award decision has been made. Any communication between proposer and
the City will be initiated by the appropriate City Official or employee in order to obtain
information or clarification needed to develop a proper, accurate evaluation of the
proposal.
10. 2 Such communications initiated by a proposer may be grounds for disqualifying the
offending proposer from consideration for award of the proposal and/or any future
proposal.
10. 3 Any questions relative to interpretation of specifications or the proposal process shall be
addressed to the Director ofPurchasing in writing, in a timely manner, prior to the period
set for the receipt and opening ofproposals. Inquiries, received within ten ( 10) days of
the date set for receipt of proposals shall not be given any consideration. Any
interpretation made to prospective proposers will be expressed in the form of an
addendum to the specifications which, if issued, will be conveyed in writing to all
prospective proposers no later than five ( 5) days prior to the date set for receipt of
proposals.
10.4 It will be the responsibility ofthe proposer to contact the Purchasing Department prior to
submitting a proposal to ascertain if any addenda have been issued, to obtain all such
addenda, and to return executed addenda with the proposal.
10. 5 Direct inquiries to:
Jeff Hyde, .Buyer
City of Fort Walton Beach
PO Box 4009
143 Hollywood Blvd NW
Fort Walton Beach, Florida 32549
850) 833 -9526
Fax (850) 8339643
Website: http: / www.fwb.org
/
Contact with any other City representative or elected official may be grounds for
disqualification.
Purchasing Department Page: 15
Engineesing Services for Wastewater Treatment Evaluation Request for Proposal 08 -109
11. CONDITIONS OF PROPOSALS:
11. 1 Late Proposals: - Proposals received by the City after the time specified for receipt will
not be considered. Proposers shall assume full responsibility for timely delivery of the
proposals to the location designated for receipt of proposals.
11. 2 Completeness - All information required by the Request for Proposal must be supplied to
constitute a legitimate proposal.
11. 3 Public Opening - All proposals will be publicly opened at the time and place specified
and made available for public inspection within ten (10) days after the proposal opening
or when an award decision is made, whichever is earlier.
11. 4 Award Presentation. - The Utilities Director will present to City Council for acceptance
and final award, one of the proposals, or will reject all proposals, within ninety ( 90)
calendar days from the date of opening of proposals.
12. TERMS AND CONDITIONS OF AGREEMENT:
The Agreement to be entered into with the successful proposer will include, but not be limited to,
the following terms and conditions.
12. 1 The proposer shall agree to indemnify and save harmless the City, its officers, agents, and
employees, from and against any and all liability, claims, demands, damages, fines, fees,
expenses, penalties, suits, proceedings, actions and costs of action, including attorney's
fees for trial and on appeal, of any kind and nature arising or growing out of or in any
way connected with the performance ofthe Agreement whether by act or omission ofthe
proposer, its agents, servants, employees or others, or because of or due to the mere
existence ofthe Agreement between the parties.
12. 2 The proposer shall pay all royalties and assume all costs arising from the use of any
invention, design, process materials, equipment, product or device which is the subject of
patent rights or copyrights. Proposer shall, at its own expense, hold harmless and defend
the City against any claim, suit or proceeding brought against the City which is based
upon a claim, whether rightful or otherwise, that the goods or services, or any part
thereof, furnished under the contract, constitute an infringement or any patent or
copyright of the United States. The Proposer shall pay all damages and costs awarded
against the City.
12. 3 An understanding and agreement, by and between the proposer and the City, that the
completion time as specified in proposer's submission is an ESSENTIAL CONDITION
OF THE CONTRACT. The proposer shall agree that all work shall be prosecuted
Purchasing Department Page: 16
Engineering Services for Wastewater Treatment Evaluation Request for Proposal 08 -109
regularly, diligently, and uninterrupted at such rate of progress as will ensure full
completion thereof within the time specified.
12. 4 Assignment
The successful Proposer shall not enter into subcontractors, retain consultants, or assign,
transfer, convey, sublet, or otherwise dispose ofthe ensuing Contract, or any or all of its
rights, title or interest herein, or its power to execute such Contract to any person,
company or corporation or transfer more than fifty percent (50 %) of its ownership to a
third party without prior written consent of the City.
12. 5 Termination for Convenience
The City may at any time, at its sole discretion, without cause, terminate this Contract for
its convenience by written notice to the successful Proposer. The City will calculate the
outstanding payments due the Proposer. The City will notify the successful Proposer of
the amount owed by the City, which will be immediately be remitted to the Proposer.
12. 6 Termination for Default
Consultants will be in default under the Contract ifthey commit a breach ofthe Contract
deemed material to the City. Where such a default occurs the City may terminate the
contract and suspend the Contractor from consideration for other work for a period not
less than one ( 1) year. The City may also require the contractor to reimburse the City for
the reprocurement cost incurred by the City as a result of reawarding or completing the
Contract.
The City may at its sole discretion waive a default by the contractor, but no such waiver,
and no failure by the City to take action shall be deemed a waiver of any subsequent
default.
13. EXECUTION OF AGREEMENT:
The successful proposer shall, within fifteen ( 15) calendar days after Notice ofAward.is issued
by the City ofFort Walton Beach Purchasing Department, enter into a contract with the City for
the performance of work awarded him and shall simultaneously provide any required bonds,
indemnities and insurance certificates. Failure to comply with the established deadline for
submittal of required documents may be grounds for cancellation of the award.
Purchasing Department Page: 17
Engineering Services for 'Wastewater Treatment Evaluation Request for Proposal 08 -109
14. RIGHT TO AUDIT RECORDS:
The City shall be entitled to audit the books and records ofa contractor or any sub -contractor to
the extent that such books and records
