READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 02-12-08 regular agenda — reading text
Part 22 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-15293-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
complete) to identify the design /permit capacity in relation to the City's current and future
requirements.
2. Identify probable capital costs to complete the planned WWTP improvements.
3. Identify estimated annual operation and maintenance costs should the City elect to proceed
with planned WWI? improvements.
4. Offer recommendations for alternatives to the cur-rent effluent disposal method. Currently,
the City land- sprays effluent on an adjacent 490 -acre field leased from the Department of
ini
the Air Force. The City desires to ire the footprint of the existing lease area to reduce
future costly lease fees. Any effluent disposal recommendations offered by the consultant
should also contain estimated
operating expenses and capital costs for
construction /implementation and comparative analysis to current operations.
5. Identify future sprayfield lease costs and impacts on annual operating costs.
C. Phase I —Project Deliverables
1.
The consultant shall provide a preliminary assessment report of the County's Draft
Wastewater Service Agreement inclusive of the items identified in the Phase I Evaluation.
2.
The consultant shall attend one meeting with County and City representatives prior to
submitting the preliminary assessment report to determine if any points of the Wastewater
Service Agreement are deemed non -negotiable by either party.
3. Prior to proceeding with the remainder of the Phases identified in this RFP, the consultant
shall confirm the County' s willingness to negotiate for wastewater treatment services.
Purchasing Department Page: 5
Engineering Services for Wastewater Treatment Evaluation Request for Proposal 08 -109
D. Phase iI —
Comtiarison of Both Options:
1. Prepare a Present Worth Analysis to compare the long -term impacts of both options: " stay
the course"
or executing a Wastewater Service Agreement with the County, or some other
option for wastewater treatment with the County.
2.
Identify the estimated cost savings related to a reduction in force should the City elect to
pursue the County's Wastewater Service Agreement, including the costs for interconnection.
3. Identify the estimated capital costs associated with abandoning and /or " mothballing" the
City's existing WWIP should the City elect to pursue the County' s offer for wastewater
treatment.
This analysis shall include any costs associated with ceasing sludge disposal
operations at the City's Agricultural Use Site.
4.
Review the City' s existing Real Estate License vnith the Department of the Air Force related
to use of the 490 -acre sprayfield located adjacent to the VWIP. The consultant shall
provide a cost estimate to restore the property as outlined in the current License in the event
the City elects to pursue the County's offer for a Wastewater Service Agreement.
5.
Review and assess real estate issues relating to easements for transmission mains and transfer
of ownership of City -owned property. The consultant shall determine if it is in the City's
best interest to: transfer ownership of the tertiary system to the County, retain ownership
E and operation of the tertiary system, or lease the tertiary system back to the County for
operation.
6.
Review and evaluate the City's current rate structure and financial data and current debt load
taking into account any future rate increases necessary to satisfy existing and possible future
debt service for capital improvements to the existing VVWIP.
7.
Evaluate the County's current rate structure and relate the structure to the City's current rate
structure. Offer alternatives to revising the rate structure to optimize the rates if the City
were to continue wastewater treatment services or if the agreement with the County is
executed.
8.
Provide an analysis of the City retaining ownership and operational responsibility, of the
City's. existing tertiary system versus leasing this facility back to the County and /or the
County assuming ownership and operational responsibility ofthe tertiary system. This shall
include an analysis of future costs concerning the expansion and increased demand of the
reuse water system.
Purchasing Department Page: 6
Engineering Services for Wastewater Treatment Evaluation Request for Proposal 08 -109
9. Review and evaluate growth projections for the City and determine the impacts growth may
have from a system capacity perspective. The treatment and disposal capacities of the WRF
and RIB system shall be taken into consideration.
10. Identify the fixed rate ( per 1, 000 gallons) of both the City and County for the cost of
wastewater treatment assessed to the City.
E. Phase II —
Project Deliverables and City Council Presentation:
1. The consultant shall attend at least one meeting, in addition to the meeting identified in
Phase I, with City and County staff for the purpose of reviewing and refining the Draft
Wastewater Service Agreement provided by the County. Contact above and beyond the two
specified meetings may be conducted through telephone conference.
2. The consultant shall provide a detailed rate analysis and Present Worth Analysis comparing
the two wastewater treatment options: " stay the course" or " Wastewater Service Agreement
with County."
3. The consultant shall provide an Extreme Wet Weather (EWW) flow analysis and a Reuse
Water Rate analysis to support the consultant's final recommendation.
4. The consultant shall provide a summarized analysis of the City's current engineering and
design project for WW'I'P renovation work along with engineering recommendations for
alternative effluent disposal options (this is not a requirement to provide engineering and
design plans). This element should include any estimated capital cost information for
alternative effluent disposal options; along with any estimated cost savings resulting from
Value Engineering recommendations related to the City's planned WWI? renovation work.
5. The Consultant shall provide a marked up copy of the County' s draft agreement using the
track changes" feature for staff review prior to preparing a final report
G. The consultant shall prepare and deliver ten (10) copies of a final report detailing all of the
information referenced above
along with the consultant' s final conclusions and
recommendations. The final report must include the consultant' s recommendation on the
most prudent and cost -effective method for providing future wastewater services to the
citizens of Fort Walton Beach.
7. The consultant shall attend one regularly scheduled meeting of City Council at the
completion of the project to present and defend final recommendations.
Purchasing Department Page: 7
Engineering Services for Wastewater Treatment Evaluation Request for Proposal 08 -109
F. Project Schedule: The following identifies the various milestone events and project schedule
to completion.
MILESTONE
RFQ Solicitation Issued December 18, 2007
Proposals Due
anuary 15, 2008
Short-Listing and Selection Committee Interviews january 17 -18, 2008
Staff Recommendation to Council for Award February 12, 2008
Execute Contract and Issue Notice to Proceed February 29, 2008
Submit Preliminary Assessment to Determine Feasibility of March 31, 2008
Proceedin with Negotiations
Draft Final Report to Staff for Review Aril 30, 2008
Final ReTort and Recommendations to Council for Approval Ma 13, 2008
4. PROPOSAL DUE DATE:
Sealed proposals in an original and six (6) complete copies shall be received at the City Clerk's
Office no later than 2: 30,p.m.. Tuesday, January 15, 2008. Proposals will not be accepted after
this time. Proposals shall be addressed as follows:
4. 1 For Regular U.S. Mail Delivery
City Clerk
City of Fort Walton Beach
P. O. Box 4009
Fort Walton Beach, FL 32549
4.2 For Hand/Express Mail/tJPS Delivery
City Clerk
City of Fort Walton Beach
107 Miracle Strip Parkway SW
Fort Walton Beach, FL 32548
4.3 Submitted envelopes shall be marked "
Evaluah'on' , RFP 08 -109.
Eneineerine Services for Wastewater Treatment
Purchasing Department Page: 8
Engineering Services for Wastewater Treatment Evaluation Request for Proposal 08 -109
5. SUBMISSION OF PROPOSALS:
5. 1 Incurred Expenses:
The City is not responsible for any expenses which proposers may incur in preparing and
submitting proposals called for in this Request for Proposals.
5. 2 Interviews:
The City reserves the right to conduct personal interviews or require presentations of any
or all proposers prior to selection. The City will not be liable for any costs incurred by
the proposer in connection with such interviews /presentations ( i.e., travel,
accommodations, etc.).
5. 3 Request for Modification:
The City reserves the right to request that the proposer modify his proposal to more fully
meet the needs of the City.
5. 4 Request for Additional Information:
g
The proposer shall furnish such additional information as the City ofFort Walton Beach
may reasonably require. The City reserves the right to make investigations of the
qualifications of the proposer as it deerns appropriate.
5. 5 Acceptance /RejeciCton/ Modification to Proposals:
The City reserves