READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2024-13 Amending Comprehensive Fee Schedule Effective 10.01.2024 — reading text

Part 6 of 13. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-41753-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Sec. 3. 01. 05) Three ( 3) times the permit fee Change of contractor, transfer of permit Prorate balance of work Res 2003- 01 1/ 28/ 03 Sec. 3. 01. 12) Notice of Commencement ( NOC) ( Sec. 713. 1? Expired permit ( Sec. 3. 01. 08) Re -issuance requires fee to be paid Res 07- 15 09/ 05/ 07 Conditional; no work has commenced and permit has Refund of permit fee ( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07 not expired; requires written notice to the BO truction Permit Fees No permit required for cosmetic work only, such as 500 or less carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07 include any structural change or any work that requires an inspection per the FBC. 1 39. 00 for the first thousand, plus $ 6. 60 for each 501 to $50, 000 Res. 2010- 25 09/ 28/ 10 Permit based on value thousand or fraction thereof, to and including $ 50, 000 Wwork, includes labor, materials, site work, 360. 55 for fust $50, 000 plus $ 5. 25 for each 50, 001 to $ 100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 and design fees $ including $ 100, 000 623. 00 for the first $ 100,000 plus $4. 00 for each 100, 001 to $ 500, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 including $500, 000 2,219. 00 for the first $500, 000 plus $2. 75 for each 500, 001 and up Res. 2010-25 09/ 28/ 10 additional thousand or fraction thereof Plan check fee 50% of building fee ( Sec. 3. 02. 06) Res 2009- 35 09/09/09 Threshold building transmittaUprocessing fee/ ICC 206. 00 Res 2008- 15 04/ 08/ 08 Moving Fee 113. 50 Res 2008- 15 04/ 08/ 08 Fee 59. 50 plus $ 9.45 per 2, 000 sq ft above 20, 000 sq ft Res. 2010- 25 09/ 28/ 10 or fraction thereof Additional Inspection Fee 38. 00 Res. 2010- 25 09/28/ 10 Additional Inspection Fee - after hours 50. 00 per hour ( 2 hour minimum) Res 2014-2 02/ 11/ 14 Re -Inspection Fee ( the building inspector returns to First - $ 38. 00 the job site to review corrected work denied on the Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10 previous inspection for the same violation) Third and more - $ 115. 50 Certificate of Occupancy 38. 00 Res. 2010-25 09/28/ 10 Certificate of Completion 38. 00 Res. 2010- 25 09/28/ 10 Temporary Certificate of Occupancy 270. 50 Res. 2010- 25 09/28/ 10 Mechanical Permits and Inspection Permit Fee Base 39. 00 Res. 2010-25 09/28/ 10 15. 00 for the first $ 1, 000 or fraction thereof of the Inspection of heating, ventilation, ductwork, air valuation of installation plus $2. 75 for each additional Res. 2010-25 09/ 28/ 10 conditioning and refrigeration systems 1, 000 or fraction thereof Inspecting repairs, alterations, and additions on 5. 80 plus $ 3. 45 for each additional $ 1, 000 or Res. 2010-25 09/28/ 10 existing systems fraction thereof 10 U:\ Finance\ Finance\ Fee Schedule\2024, September\9. 24.2024 Comprehensive Fee Schedule FY 2024-25 Marked Up Department 1 and/ or 1Enacting Resolution Description Current ate O Service Inspecting Boilers Boiler Inspections 40. 00 Res. 2010-25 09/28/ 10 Reinspection of a heating, ventilation, air First - $38. 00 conditioning or refrigeration system, or boiler Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10 inspection (reinspection same as above) Third and more - $ 115. 50 Inspection for permitting temporary operation of First - $ 38. 00 heating, ventilating, refrigeration, or air condition Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10 system ( reinspection same as above) Third and more - $ 115. 50 Reduced by 501/o housing, unless permit is for Rehabilitation of substandard minimum of $5. 00. Repairs, alterations and additions Res 2003- 01 1/ 28/ 03 to an existing system under $500. 00 Plumbing and Gas Permits Base Permit Fee $ 39. 00 Res. 2010- 25 09/ 28/ 10 Plus, per plumbing fixture, floor drain or trap, 3. 45 Res. 2010- 25 09/ 28/ 10 including water and drainage pipe Plus, per sewer connection $ 12. 00 Res. 2010- 25 09/ 28/ 10 Plus, per water heater and/ or vent $ 3. 15 Res. 2010- 25 09/ 28/ 10 For installation, alteration or repair of water piping $ 6.05 Res. 2010- 25 09/28/ 10 and/ or water treating equipment For repair/ alteration of drainage or vent piping 6.05 Res. 2010- 25 09/28/ 10 For vacuum breakers or backflow protective 1 to 5 - $ 3. 15 devices subsequent to the installation of the piping Res. 2010- 25 09/28/ 10 over 5, each - $ 2. 05 or equipment served First - $ 38. 00 Reinspection for faulty materials, equipment, Second - $ 38.00 Res. 2010- 25 09/28/ 10 apparatus or workmanship Third and more - $ 115. 50 Electrical Permits Base Permit Fee 39. 00 Res. 2010-25 09/28/ 10 Plus, per circuit 1. 85 Res. 2010-25 09/28/ 10 Temporary pole 18. 50 Res. 2010-25 09/28/ 10 First - $ 38. 00 Reinspection for

Download this text file with its original spacing ↓