READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — 2013 meeting #1182 (date undetermined) — NPDES Annual Report 2013 — reading text
Part 2 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 25-NPDES Annual Report 2013.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
illegal 2. Document and report
dumping. the number of Request number — 7479
complaints investigated. Request number — 7528
http:/Awww.co.okaloosa.fl.us/deptpw_roadscontact. Request number — 7557
htnil Request number - 8421
; Fit Di. 7... | 1. Document and report
3d | 01 Tein County? Staton Mieke Diseharge Detection: the number of staff Year 1 8 Staff performed In-House Training on Importance of
Provide training or coordinate with existing training | trained. Stormwater Maintenance, Sediment Control on Construction
efforts to educate relevant staff on proper detection Sites and Installing Erosion and Turbidity Controls.
and reporting for illicit discharge.
Page 6 of 16 of Phase II MS4 Annual Report
Phase Il MS4 Annual Report Guidance Form
NPDES ANNUAL REPORT
Phase II MS4 Permit ID # FLRO4E073
SECTION II. SUMMARY OF STORMWATER MANAGEMENT PROGRAM ACTIVITIES
Indicate the Phase II MS4 status of compliance in terms of progress toward each of the measurable goals described in the generic permit. Refer to the NOI for a list of the specific BMPs and
Measurable Goals the Phase II MS4 committed to perform and track. Changes which will result in deviation from the NOI should be listed in Section III of this form. Include activities for all
reporting periods (permit years) in this section. A summary of results is expected for the current reporting period but may be added to results from previous annual report periods. A summary of
results is not expected for future reporting periods, but the anticipated BMPs, measurable goals and schedules for future reporting periods should be provided in this section.
Element A B B (03
Measurable Goal Schedule
ID/BMP # BMP Description for Summary of Results
Implemen
tation/Co
mpletion
Inform Public, Employees, and Business Of 1. Document and report . ;
3d 02 hazards associated with Illegal Discharges and the number hits the web | Year 1 Visits to site # 17,297
Improper Disposal of Waste — The County Web site receives. :
Page Features information on clean boating, http:/Awww.co.okaloosa.fl.us/dept_pw_resources_recycle_haz.h
location of boat pump out stations, stormwater tml
education information, recycling information, green
building, hazardous waste, electronics recycling
and proper disposal, as well as Kids Recycling
Education Pages.
http:/Avww.co.okaloosa.fl.us/deptjiw clean.html
Erosion and Sediment Control Ordinance — 1. Document and report
4a 01 Section 6.06.08 of the Okaloosa County Land any changes to the Year 1 No amendments have been made to the Land and
Development Code as amended requires the ordinance or Development Code. Board of County Commissioners adopted
proper implementation of sediment and erosion amendments, if an Illicit Discharge Ordinance on Nov 1, 2011
controls and construction materials applicable.
management for construction sites with a land
disturbance greater than or equal to one acre. An
online copy of the LDC is available at:
http://www.co.okaloosa.fl.us/deptgrowtlmgmt_land
dev code. html
Page 7 of 16 of Phase II MS4 Annual Report
Phase Il MS4 Annual Report Guidance Form
NPDES ANNUAL REPORT
Phase II MS4 Permit ID # FLRO4E073
SECTION II. SUMMARY OF STORMWATER MANAGEMENT PROGRAM ACTIVITIES
Indicate the Phase II MS4 status of compliance in terms of progress toward each of the measurable goals described in the generic permit. Refer to the NOI for a list of the specific BMPs and
Measurable Goals the Phase II MS4 committed to perform and track. Changes which will result in deviation from the NOI should be listed in Section III of this form. Include activities for all
reporting periods (permit years) in this section. A summary of results is expected for the current reporting period but may be added to results from previous annual report periods. A summary of
results is not expected for future reporting periods, but the anticipated BMPs, measurable goals and schedules for future reporting periods should be provided in this section.
Element A B B (o}
Measurable Goal Schedule
ID/BMP # BMP Description for Summary of Results
Implemen
tation/Co
mpletion
Erosion and Sediment Control on Construction | 1. Document and report
4b 01 Sites — The County requires all construction sites | the number of Year 1 July 9, 2012 to July 8, 2013
to implement effective erosion and sedimentation | construction sites
controls per Section 6.06.08 of the Okaloosa | operation under the 21 Private construction sites.
County Land Development Code erosion and
sedimentation control 49 County construction sites.
requirements.
, + ai 1. Track and report the
Provide Web Based Information on Training for phate
4p 02 Construction Operators .- Provide information on number of web site hits. | Year 1 .
local training available to construction operators on BMP was removed January 30, 2012 per email from DEP
how to install and maintain effective erosion and
sediment controls, and how to comply with the
ordinance.
Construction Material Management for | 1. Document and report
4c 01 Construction Sites — County Ordinance Section | the active construction Year 1 July 9, 2012 to July 8, 2013
9.02.0Q-D of the Okaloosa County Land | sites operating under
Development Code requires all construction site | the material
operators to provide material management | management ordinance. 21 Private construction sites.
practices. An online copy of the LDC is available at:
49 County construction sites.
http:/Awww.co, okaloosa.fl.us/deptgrowthmgmtjandjl
ev code.html
Page 8 of 16 of Phase II MS4 Annual Report
Phase Il MS4 Annual Report Guidance Form
NPDES ANNUAL REPORT
Phase II MS4 Permit ID # FLRO4E073
SECTION II. SUMMARY OF STORMWATER MANAGEMENT PROGRAM ACTIVITIES
Indicate the Phase II MS4 status of compliance in terms of progress toward each of the measurable goals described in the generic permit. Refer to the NOI for a list of the specific BMPs and
Measurable Goals the Phase II MS4 committed to perform and track. Changes which will result in deviation from the NOI should be listed in Section III of this form. Include activities for all
reporting periods (permit years) in this section. A summary of results is expected for the current reporting period but may be added to results from previous annual report periods. A summary of
results is not expected for future reporting periods, but the anticipated BMPs, measurable goals and schedules for future reporting periods should be provided in this section.
Element A B B Cc
Measurable Goal Schedule
ID/BMP # BMP Description for Summary of Results
Implemen
tation/Co
mpletion
Training Plan Reviewers and Field Inspectors — | 1. Document and report
4c 02 Provide training, or coordinate with existing training | the number of staff Year 1 No new/additional staff. Existing staff previously trained.
efforts to educate plan reviewers and _ field | trained.
inspectors in construction materials management.
Review Stormwater Management Plans for Erosion | 1. Document and report
4d 01 and Sediment Controls —Review stormwater | the number of Year 1 30 Construction Plans reviewed
management plans prior to construction to ensure | stormwater
that they include erosion and sediment controls, | management plans
construction materials management, and post- | reviewed.
construction controls in compliance with local
ordinances. NPDES requires that all construction
sites greater than one disturbed acre be subject to
plan review.
Receive Information from the Public —Publish the 1. Document and report
4e 01 address of the “Citizen Request for Services” the number of requests | Year 1 One request received and turned over to Code Enforcement.
website to receive information from the public on received.
construction site runoff issues. Requests for
services are directed to the road department and a
district supervisor will inspect the complaint and
notify the proper authorities.
http:/Awww.co.okaloosa.fl.us/deptpwioadscontact.ht
ml
Page 9 of 16 of Phase II MS4 Annual Report
Phase Il MS4 Annual Report Guidance Form
NPDES ANNUAL REPORT
Phase II MS4 Permit ID # FLRO4E073
SECTION II. SUMMARY OF STORMWATER MANAGEMENT PROGRAM ACTIVITIES
Indicate the Phase !I MS4 status of compliance in terms of progress toward each of the measurable goals described in the generic permit. Refer to the NOI for a list of the specific BMPs and
Measurable Goals the Phase Il MS4 committed to perform and track. Changes which will result in deviation from the NOI should be listed in Section III of this form. Include activities for all
reporting periods (permit years) in this section. A summary of results is expected for the current reporting period but may be added to results from previous annual report periods. A summary of
results is not expected for future reporting periods, but the anticipated BMPs, measurable goals and schedules for future reporting periods should be provided in this section.
Element A B B Cc
Measurable Goal Schedule
IDIBMP # BMP Description for Summary of Results
Implemen
tation/Co
mpletion
Inspect Construction Sites — Inspect all | 1. Document and report
4f 01 construction sites during the construction period | the number of Year 1 83 Private and 31 County inspections performed with 55
that are regulated by the ordinance adopted in | construction site enforcement action taken from 7/9/12 to 7/8/13.
BMP Number 4d 01. inspections.
Fleet Operation and Maintenance Plan — Continue | 1. Document and report
6a 01 to implement the fleet operation and maintenance | the number of fleet Year 1 0 Incident spills in Fleet Department from 7/9/2012 to 7/8/2013.
plan to prevent and clean-up any spills at fleet | incidents that have
operations. occurred.
Parks and Open Space Maintenance — Continue | 1. Document and report
6a 02 to maintain stormwater systems and remove trash | the number of county Year 1 52 Parks a week are actively inspected for trash and drainage
at county parks. park stormwater maintenance.
systems maintained.
Page 10 of 16 of Phase Il MS4 Annual Report
Phase II MS4 Annual Report Guidance Form
NPDES ANNUAL REPORT
Phase II MS4 Permit ID # FLRO4E073
SECTION II. SUMMARY OF STORMWATER MANAGEMENT PROGRAM ACTIVITIES
Indicate the Phase Il MS4 status of compliance in terms of progress toward each of the measurable goals described in the generic permit. Refer to the NOI for a list of the specific BMPs and
Measurable Goals the Phase II MS4 committed to perform and track. Changes which will result in deviation from the NOI should be listed in Section III of this form. Include activities for all
reporting periods (permit years) in this section. A summary of results is expected for the current reporting period but may be added to results from previous annual report periods. A summary of
results is not expected for future reporting periods, but the anticipated BMPs, measurable goals and schedules for future reporting periods should be provided in this section.
Element A B B c
Measurable Goal Schedule
ID/IBMP # BMP Description for Summary of Results
Implemen
tation/Co
mpletion
Operation and Maintenance Plan — Continue to 1. Document and report
6a 03 implement the operation and maintenance plan to the number of county Year 1 40 County construction sites.
prevent or reduce pollutant runoff from county construction projects
construction that implement correct As of 10/1/11 all County construction sites will be inspected by
erosion control County Inspectors who are FDEP Sedimentation and Erosion
methods. Control Certified.
County Stormwater System Maintenance — 1. Document and report
6a 04 Continue to clean out county catch basins, and the volume Year 1 July 9, 2012 to July 8, 2013
maintain county swales and stormwater ponds. (cubic yards) of material
removed from catch
basins. 1.) 11,658 cubic yards of fill was removed from channels
2. Document and report and basins.
number of swale
maintenance activities 2.) 561 swale sediment load tickets documented.
performed.
3. Document and report
the number of 3.) 185 Stormwater ponds under Okaloosa County
