Okaloosa County BOCC — February 16, 2016 — ajax co2 full — reading text

Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

ajax co2 full — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Y’AIA Document G701/CMa™ - 1992 Change Order - Construction Manager-Adviser Edition PROJECT (Nante and address): CHANGE ORDER NUMBER: 002 v OWNER: [X] Okaloosa Cty Courthouse addition and INITIATION DATE: 02/08/16 CONSTRUCTION MANAGER: [X] renovation ARCHITECT: X Crostview Fl. CONTRACTOR: [] TO CONTRACTOR (Name and address): PROJECT NUMBERS: 201423 / FIELD: [ Ajax Building Corporation (C14-2177-FM) OTHER: [] 1080 Commerce Blvd CONTRACT DATE: 5/6/14 Midway, Florida 32343 CONTRACT FOR: Construction Management THE CONTRACT IS CHANGED AS FOLLOWS: Perform additional Pre-Construction Design and Administrative Services as further described in Exhibits B and C attached hereto. ) 1,296,000.00 The original Contract Sum was $ ,296, Net change by previously authorized Change Orders $ 1,170,340.00 The Contract Sum prior to this Change Order was $ 2,466,340.00 The Contract Sum will be increased by this Change Order in the amount of $ 0,00 $ 2,466,340.00 The new Contract Sum including this Change Order will be The Contract Time will be increased by one hundred eighty-two (182) days. The date of Substantial Completion as of the date of this Change Order therefore is July 15, 2016. NOTE: This summary docs not reflect changes in the Contract Sum, Contract Time or Guoranteed Maximum Price which have been authorized by Construction Change Directive.. NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. Ajax Building Corporation Sam Marshall Architects CONSTRUCTION MANAGER (Firm name) ARCHITECT (Firm nante) Midyway, Fl. 32343 325 S. Pfitafox Strect, Pensaloll, Fi. 32502 ADDRESS ~ BY (Si;un; ) William P, Byrne, Pregident David Alsop (Typed name) DATE: February 8, 2016 (Typed name) DATE: 2.9 |6 Ajax Building Corporation Okaloosa County Board of County Commissioners CONTRACTOR (¥irm narme) OWNER (Firm name) m , Midway, Fl. 32343 302 N. Wilson St. Suite 302, Crestview, Fl, 32536 ADD ADDRESS BY (Skenature) * / Z BY (Signature) William P. Byrne, Presjtient (Typed name) U DATE: February 8, 2016 (Typed name) DATE: AIA Document G701/CMa'™ — 1992, Copyright © 1992 by The American Institute of Architects. All rights reserved. WARNING: This AJA”™ Document is pratected by U.S. Copyright Law and International Treatlos. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe clvil and criminal penalties, and will be prosecuted to the maximum extent possiblo under the law. This document was produced by AIA software at 13:40:27 on 02/09/2016 under Order No.7103294866_1 which expires on 10/26/2016, and is not for resale User Notes: (1146241865) 1 CHANGE ORDER FORM Date: 2/8/16 Contract No.: __C14-2177-FM Change Order No.: __ 02 Owner: _OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS Contractor: Ajax Building Corporation " CHANGE TO CONTRACT PRICE | DESCRPTON [ ~AMOUNT_ Original Contract Price: $1,296,000.00 Net change by previously authorized Change Orders: $1,170,340.00 Present Coniract Price: ‘ $2,466,340.00 This Change Order will {add/deduct): $ 0.00 New Contract Price: $2,466,340.00 T T CHANGETO CONTRAGTTIME 17 iy T T DRCRMON T T T [ DA GTUBR e BT Original Contract 'fifne: 365 Original Substantial Completion Date: May 5, 2015 Net change by previously authorized Change Orders: 255 This Change Order will (add/deduct): 182 New Contract Time: 802 New Substantial Completion Date: July 15, 2016 APPROVALS REQUESTED BY: W W A /MlharQ P. Byme, President DATE: _February 8, 2016 PROJECT ENGINE | \v/ ! DATE: _ L / o [{ lb CONTRACTOR: el illiam P. Byme, President DATE: _February 8, 2016 OWNER: ' DATE: v This Change Order is an amendment to the Contract/Agreement between Contractor and the Owner, and all other contract provisions shall remain in full force and effect unless specifically amended in writing, signed by both parties. Exhibit “B” February 8, 2016 Okaloosa County Courthouse Crestview, Florida Design Build Scope Change The original scope was for a construction budget of $8,000,000 based on a solution that did not meet projected needs as determined through programming efforts and schematic design based on data collected and input from the courts personnel, users groups, and county staff. In February of 2015 the scope was revised to one that met the needs for a 10 to 20 year projection, and likely suitable for 25 to 30 years. That revised scope included the addition of approximately 36,000 square feet in a 3 story building for the courts, judges and the holding areas, and the relocation and expansion of security for a south side entrance. Also included in the revised scope was the renovation of approximately 42,000 square feet in the existing 3 story building to accommodate the complete court support functions required. The revised scope indicated construction budgets of $12,000,000 for new construction and $5,000,000 for renovation/remodeling. The design fees and preconstruction services completed to date for that scope were credited to the project. The current scope (February 2016) is based on the demolition of the existing courthouse due to environmental conditions present in the facility and the construction of a new 3 story, approximately 68,040 design gross square footage courthouse to meet the programmed needs for 25 to 30 years, and likely suitable for longer. The savings in efficiencies of the new layout indicate cost savings for new construction of roughly 13% over renovation reuse and addition cost projections. The increased design fees and the preconstruction costs are adjusted to meet the new scope as accepted by the county. See EXHIBIT C as revised for fees breakdown. It should be noted that while the revised EXHIBIT C clearly indicates an increase in projected overall fees of $777,487.00 this Change Order #2 is for $0.00 additional dollars. Exhibit C contains both Design phase Fees (needed now) and Construction Phase Fees (needed later). In the interest of not requiring the County to encumber additional current dollars for an item of cost which only has meaning when there is an agreed upon Guaranteed Maximum Price (GMP). We are requesting, via this Change Order, to re-allocate existing previously approved funds to cover the increase in Design Fees ($542,409) by reducing the Construction Phase Fee by this amount and deferring any increase in Construction Phase Fees until the acceptance, by the Board, of a future GMP proposal. This reallocation of funds is illustrated in the proposed new Schedule of Values (SOV) which will be used in all future billings in this Phase (copy attached). EXHIBIT C Fee Basis Construction Budget = $21,000,000 Phase | - Preconstruction (Pre-GMP) Basic AE Design Fee (based on DMS sliding scale, Complexity C 6.55%) 76% S 1,245,380 Schematic Design (15%) plus $200,000 in re-design to one building S 406,325 $ - Design Development (18%) $ 247,590 $ Construction Documents (40%) S 550,200 Bidding/Negotiations (3%) S 41,265 Additional Design Services: $ 408,327 Civil Survey of existing facility/campus by Owner (+/-) Geotech Investigation (soil borings) by Owner Civil Design Services S 31,500 Programming Services for Court Facility s 33,000 $ Conceptual Design $ 30,000 $ Security Planning S 50,000 Interior Design $ 83,214 Landscape Design S 22,000 Measured Drawings of existing building S 18,000 $ Facility Analysis $ - incl. in Programming Voice, Data, Telecom S 29,000 AV Design $ 38,000 Demolition Plans and Specifications S 20,000 Reimbursable Expenses (Travel, Lodging, printing, etc.) $ % Owner FF& E $ 53,613 Existing Furniture & Equip. Inventory S 9,461 Preliminary Design $ 18,922 Final Design S 25,230 Bidding S 3,154 Incl.in CM Serv. Installation S 6,307 Incl.in CM Serv. Construction Management Services Pre-Con Phase (1%) S 210,000 I |Total Preconstruction Phase Fees and Services: S 1,863,707 | Phase Il - Construction (Post-GMP) Basic AE Design Fee (based on DMS sliding scale, Complexity C 6.55%) Construction $ 330,120 Administration (24%) konstruction Management Services Construction Phase Fee(5%) 1,050,000 | |Tota| Construction Phase Fees and Services: 1,380,120 | Total Fees Phases 1 and 2 Less Original Fees: (2,466,340) |Total this Change Order: s $ $ 3,243,827 $ $ 777,487 | Phase | - Preconstruction (Pre-GMP) Schedule New Duration New Completion Date: 15-Jul-16 Less Current Duration Original Completion Date: 15-Jan-16 802 Calendar Days 620 Calendar Days |Total added duration this Change Order: 182 Calendar Days | Phase Il - Construction (Post-GMP) Schedule - TBD at GMP Attachment to Change Order #2 Ajax Building Corporation 2/9/2016 CONTINUATION SHEET AIA DOCUMENT G703 PAGE 1 OF 2 PAGES AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. APPLICATION NO Preconstruction Phase No. 05 APPLICATION DATE: January 13, 2016 PERIOD TO: January 1, 2016 Use Column I on Contracts where variable retainage for line items may apply. AJAX'S PROJECT NO: 201423 A B C D E F G H I NO DESCRIPTION OFWORK SETRED | SCTDILED PRE\];IS:T!;LY THIS PERIOD | STORED (NOT IN | STORED TODATE | * /) [ piNisH (c-6) | VARIABLE RATE) LLE D ORE) MD+E+F) PRECONSTRUCTION PHASE SERVICES BASIC A/E DESIGN FEES SCHEMATIC DESIGN 92,400.00 406,325.00 184,400.97 221,924.03 = 406,325.00 | 100% - - DESIGN DEVELOPMENT 110,880.00 247,590.00 154,896.81 - - 154,896.81 63% 92,693.19 - CONSTRUCTION DOCUMENTS 246,400.00 550,200.00 - - - - 0% 550,200.00 - BIDDING / NEGOTIATIONS 18,480.00 41,265.00 - - - - 0% 41,265.00 - MISC. EXPENSES (TRAVEL, PRINTING, POSTAGE, MEETINGS) - - - - - #DIV/0! - - ADDITIONAL DESIGN SERVICES CIVIL SURVEY OF EXISTING FACILITY / CAMPUS 8,000.00 - - - - - #DIV/0! - - CIVIL DESIGN SERVICES TBD 31,500.00 PROGRAMMING SERVICES FOR COURT FACILITY 33,000.00 33,000.00 33,000.00 - - 33,000.00 | 100% - - CONCEPTUAL DESIGN 30,000.00 30,000.00 30,000.00 - - 30,000.00 | 100% = - SECURITY PLANNING 15,000.00 50,000.00 - 7,500.00 - 7,500.00 15% 42,500.00 - INTERIOR DESIGN 24,000.00 83,214.00 - - = - 0% 83,214.00 - LANDSCAPE DESIGN 22,000.00 22,000.00 - s = = 0% 22,000.00 - MEASURED DRAWINGS OF EXISTING BUILDING 18,000.00 18,000.00 18,000.00 - - 18,000.00 | 100% - - FACILITY ANALYSIS (INCLUDED IN PROGRAMMING) INCL INCL VOICE / DATA / TELECOM 21,000.00 29.000.00 - 16,080.00 - 16,080.00 55% 12,920.00 - AN DESI(;N 29,000.00 38,000.00 - - - - 0% 38,000.00 - DEMOLITION PLANS and SPECIFICATIONS - 20,000.00 OWNER FF & E - 53,613.00 CONSTRUC{‘ION MANAGER FEES _|CM PRECONSTRUCTION PHASE SERVICES 80,000.00 210,000.00 62,067.00 22,479.00 - 84,546.00 | 40.26% 125,454.00 - PRECONSTRUCTION PHASE SERVICES 748,160.00 1,863,707.00 482,364.78 267,983.03 - 750,347.81 | 40.26%| 1,008,246.19 AIA DOCUMENT G703 - CONTINUATION SHEET FOR G702 - 1992 EDITION - AIA® - © 1822 67031992 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW., WASHINGTON, D.C. 200055232 CONTINUATION SHEET AlIA DOCUMENT G703 PAGE 2 OF 2 PAGES AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. APPLICATION NO: APPLICATION DATE : January 13,2016 PERIOD TO: January 1, 2016 : Preconstruction Phase No. 05 Use Column I on Contracts where variable retainage for line items may apply. AJAX'S PROJECT NO: 201423 A B c D E F G H 1 WORK COMPLETED . AJAXITEM ORIGINAL REVISED ]};ARI}ZT:;EI:\II'I/}II; COI\{P{‘;}%L‘) AND BALANCE TO RETAINAGE (IF No. DESCRIPTION OF WORK s¢ ?,ifi%w SCI‘I:,"\?:?F‘ED PREVIOUSLY | 1 onrnion | STORED (NOT IN | STORED To DATE | @ O | FINISH(C-G) | VARIABLE RATE) : e BILLED D ORE) (D+E+F) BASIC A/E DESIGN FEES BASIC A/E CONSTRUCTION ADMINISTRATION 147,840.00 295,042.00 - - - - 0% 295,042.00 - CONSTRUCTION MANAGER FEES CM CONSTRUCTION PHASE SERVICES 400,000.00 307,591.00 - - - - 0% 307,591.00 - GRAND TOTALS

Download this text file with its original spacing ↓