Y’AIA Document G701/CMa™ - 1992
Change Order - Construction Manager-Adviser Edition
PROJECT (Nante and address): CHANGE ORDER NUMBER: 002 v OWNER: [X]
Okaloosa Cty Courthouse addition and INITIATION DATE: 02/08/16 CONSTRUCTION MANAGER: [X]
renovation ARCHITECT: X
Crostview Fl. CONTRACTOR: []
TO CONTRACTOR (Name and address): PROJECT NUMBERS: 201423 / FIELD: [
Ajax Building Corporation (C14-2177-FM) OTHER: []
1080 Commerce Blvd CONTRACT DATE: 5/6/14
Midway, Florida 32343 CONTRACT FOR: Construction
Management
THE CONTRACT IS CHANGED AS FOLLOWS:
Perform additional Pre-Construction Design and Administrative Services as further described
in Exhibits B and C attached hereto. )
1,296,000.00
The original Contract Sum was $ ,296,
Net change by previously authorized Change Orders $ 1,170,340.00
The Contract Sum prior to this Change Order was $ 2,466,340.00
The Contract Sum will be increased by this Change Order in the amount of $ 0,00
$ 2,466,340.00
The new Contract Sum including this Change Order will be
The Contract Time will be increased by one hundred eighty-two (182) days.
The date of Substantial Completion as of the date of this Change Order therefore is July 15, 2016.
NOTE: This summary docs not reflect changes in the Contract Sum, Contract Time or Guoranteed Maximum Price which have been
authorized by Construction Change Directive..
NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR.
Ajax Building Corporation Sam Marshall Architects
CONSTRUCTION MANAGER (Firm name) ARCHITECT (Firm nante)
Midyway, Fl. 32343 325 S. Pfitafox Strect, Pensaloll, Fi. 32502
ADDRESS ~
BY (Si;un; )
William P, Byrne, Pregident David Alsop
(Typed name) DATE: February 8, 2016 (Typed name) DATE: 2.9 |6
Ajax Building Corporation Okaloosa County Board of County Commissioners
CONTRACTOR (¥irm narme) OWNER (Firm name)
m , Midway, Fl. 32343 302 N. Wilson St. Suite 302, Crestview, Fl, 32536
ADD ADDRESS
BY (Skenature) * / Z BY (Signature)
William P. Byrne, Presjtient
(Typed name) U DATE: February 8, 2016 (Typed name) DATE:
AIA Document G701/CMa'™ — 1992, Copyright © 1992 by The American Institute of Architects. All rights reserved. WARNING: This AJA”™ Document is
pratected by U.S. Copyright Law and International Treatlos. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may
result in severe clvil and criminal penalties, and will be prosecuted to the maximum extent possiblo under the law. This document was produced by AIA
software at 13:40:27 on 02/09/2016 under Order No.7103294866_1 which expires on 10/26/2016, and is not for resale
User Notes: (1146241865)
1
CHANGE ORDER FORM
Date: 2/8/16 Contract No.: __C14-2177-FM Change Order No.: __ 02
Owner: _OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS
Contractor: Ajax Building Corporation
" CHANGE TO CONTRACT PRICE |
DESCRPTON [ ~AMOUNT_
Original Contract Price: $1,296,000.00
Net change by previously authorized Change Orders: $1,170,340.00
Present Coniract Price: ‘ $2,466,340.00
This Change Order will {add/deduct): $ 0.00
New Contract Price: $2,466,340.00
T T CHANGETO CONTRAGTTIME 17 iy T
T DRCRMON T T T [ DA GTUBR e BT
Original Contract 'fifne: 365
Original Substantial Completion Date: May 5, 2015
Net change by previously authorized Change Orders: 255
This Change Order will (add/deduct): 182
New Contract Time: 802
New Substantial Completion Date: July 15, 2016
APPROVALS
REQUESTED BY: W W A /MlharQ P. Byme, President DATE: _February 8, 2016
PROJECT ENGINE | \v/ ! DATE: _ L / o [{ lb
CONTRACTOR: el illiam P. Byme, President DATE: _February 8, 2016
OWNER: ' DATE:
v
This Change Order is an amendment to the Contract/Agreement between Contractor and the
Owner, and all other contract provisions shall remain in full force and effect unless specifically
amended in writing, signed by both parties.
Exhibit “B”
February 8, 2016
Okaloosa County Courthouse
Crestview, Florida
Design Build Scope Change
The original scope was for a construction budget of $8,000,000 based on a solution that did not
meet projected needs as determined through programming efforts and schematic design based on
data collected and input from the courts personnel, users groups, and county staff.
In February of 2015 the scope was revised to one that met the needs for a 10 to 20 year
projection, and likely suitable for 25 to 30 years. That revised scope included the addition of
approximately 36,000 square feet in a 3 story building for the courts, judges and the holding
areas, and the relocation and expansion of security for a south side entrance. Also included in the
revised scope was the renovation of approximately 42,000 square feet in the existing 3 story
building to accommodate the complete court support functions required. The revised scope
indicated construction budgets of $12,000,000 for new construction and $5,000,000 for
renovation/remodeling. The design fees and preconstruction services completed to date for that
scope were credited to the project.
The current scope (February 2016) is based on the demolition of the existing courthouse due to
environmental conditions present in the facility and the construction of a new 3 story,
approximately 68,040 design gross square footage courthouse to meet the programmed needs for
25 to 30 years, and likely suitable for longer. The savings in efficiencies of the new layout
indicate cost savings for new construction of roughly 13% over renovation reuse and addition
cost projections. The increased design fees and the preconstruction costs are adjusted to meet the
new scope as accepted by the county.
See EXHIBIT C as revised for fees breakdown.
It should be noted that while the revised EXHIBIT C clearly indicates an increase in projected
overall fees of $777,487.00 this Change Order #2 is for $0.00 additional dollars. Exhibit C
contains both Design phase Fees (needed now) and Construction Phase Fees (needed later). In
the interest of not requiring the County to encumber additional current dollars for an item of cost
which only has meaning when there is an agreed upon Guaranteed Maximum Price (GMP). We
are requesting, via this Change Order, to re-allocate existing previously approved funds to cover
the increase in Design Fees ($542,409) by reducing the Construction Phase Fee by this amount
and deferring any increase in Construction Phase Fees until the acceptance, by the Board, of a
future GMP proposal. This reallocation of funds is illustrated in the proposed new Schedule of
Values (SOV) which will be used in all future billings in this Phase (copy attached).
EXHIBIT C
Fee Basis
Construction Budget = $21,000,000
Phase | - Preconstruction (Pre-GMP)
Basic AE Design Fee (based on DMS sliding scale, Complexity C 6.55%) 76% S 1,245,380
Schematic Design (15%) plus $200,000 in re-design to one building S 406,325 $ -
Design Development (18%) $ 247,590 $
Construction Documents (40%) S 550,200
Bidding/Negotiations (3%) S 41,265
Additional Design Services: $ 408,327
Civil Survey of existing facility/campus by Owner (+/-)
Geotech Investigation (soil borings) by Owner
Civil Design Services S 31,500
Programming Services for Court Facility s 33,000 $
Conceptual Design $ 30,000 $
Security Planning S 50,000
Interior Design $ 83,214
Landscape Design S 22,000
Measured Drawings of existing building S 18,000 $
Facility Analysis $ - incl. in Programming
Voice, Data, Telecom S 29,000
AV Design $ 38,000
Demolition Plans and Specifications S 20,000
Reimbursable Expenses (Travel, Lodging, printing, etc.) $ %
Owner FF& E $ 53,613
Existing Furniture & Equip. Inventory S 9,461
Preliminary Design $ 18,922
Final Design S 25,230
Bidding S 3,154 Incl.in CM Serv.
Installation S 6,307 Incl.in CM Serv.
Construction Management Services Pre-Con Phase (1%) S 210,000 I
|Total Preconstruction Phase Fees and Services: S 1,863,707 |
Phase Il - Construction (Post-GMP)
Basic AE Design Fee (based on DMS sliding scale, Complexity C 6.55%) Construction $ 330,120
Administration (24%)
konstruction Management Services Construction Phase Fee(5%)
1,050,000 |
|Tota| Construction Phase Fees and Services:
1,380,120 |
Total Fees Phases 1 and 2
Less Original Fees:
(2,466,340)
|Total this Change Order:
s
$
$ 3,243,827
$
$
777,487 |
Phase | - Preconstruction (Pre-GMP) Schedule
New Duration
New Completion Date: 15-Jul-16
Less Current Duration
Original Completion Date: 15-Jan-16
802 Calendar Days
620 Calendar Days
|Total added duration this Change Order:
182 Calendar Days |
Phase Il - Construction (Post-GMP) Schedule - TBD at GMP
Attachment to Change Order #2
Ajax Building Corporation
2/9/2016
CONTINUATION SHEET
AIA DOCUMENT G703
PAGE 1 OF 2 PAGES
AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing
Contractor's signed certification is attached.
In tabulations below, amounts are stated to the nearest dollar.
APPLICATION NO
Preconstruction Phase No. 05
APPLICATION DATE: January 13, 2016
PERIOD TO: January 1, 2016
Use Column I on Contracts where variable retainage for line items may apply. AJAX'S PROJECT NO: 201423
A B C D E F G H I
NO DESCRIPTION OFWORK SETRED | SCTDILED PRE\];IS:T!;LY THIS PERIOD | STORED (NOT IN | STORED TODATE | * /) [ piNisH (c-6) | VARIABLE RATE)
LLE D ORE) MD+E+F)
PRECONSTRUCTION PHASE SERVICES
BASIC A/E DESIGN FEES
SCHEMATIC DESIGN 92,400.00 406,325.00 184,400.97 221,924.03 = 406,325.00 | 100% - -
DESIGN DEVELOPMENT 110,880.00 247,590.00 154,896.81 - - 154,896.81 63% 92,693.19 -
CONSTRUCTION DOCUMENTS 246,400.00 550,200.00 - - - - 0% 550,200.00 -
BIDDING / NEGOTIATIONS 18,480.00 41,265.00 - - - - 0% 41,265.00 -
MISC. EXPENSES (TRAVEL, PRINTING, POSTAGE, MEETINGS) - - - - - #DIV/0! - -
ADDITIONAL DESIGN SERVICES
CIVIL SURVEY OF EXISTING FACILITY / CAMPUS 8,000.00 - - - - - #DIV/0! - -
CIVIL DESIGN SERVICES TBD 31,500.00
PROGRAMMING SERVICES FOR COURT FACILITY 33,000.00 33,000.00 33,000.00 - - 33,000.00 | 100% - -
CONCEPTUAL DESIGN 30,000.00 30,000.00 30,000.00 - - 30,000.00 | 100% = -
SECURITY PLANNING 15,000.00 50,000.00 - 7,500.00 - 7,500.00 15% 42,500.00 -
INTERIOR DESIGN 24,000.00 83,214.00 - - = - 0% 83,214.00 -
LANDSCAPE DESIGN 22,000.00 22,000.00 - s = = 0% 22,000.00 -
MEASURED DRAWINGS OF EXISTING BUILDING 18,000.00 18,000.00 18,000.00 - - 18,000.00 | 100% - -
FACILITY ANALYSIS (INCLUDED IN PROGRAMMING) INCL INCL
VOICE / DATA / TELECOM 21,000.00 29.000.00 - 16,080.00 - 16,080.00 55% 12,920.00 -
AN DESI(;N 29,000.00 38,000.00 - - - - 0% 38,000.00 -
DEMOLITION PLANS and SPECIFICATIONS - 20,000.00
OWNER FF & E - 53,613.00
CONSTRUC{‘ION MANAGER FEES
_|CM PRECONSTRUCTION PHASE SERVICES 80,000.00 210,000.00 62,067.00 22,479.00 - 84,546.00 | 40.26% 125,454.00 -
PRECONSTRUCTION PHASE SERVICES 748,160.00 1,863,707.00 482,364.78 267,983.03 - 750,347.81 | 40.26%| 1,008,246.19
AIA DOCUMENT G703 - CONTINUATION SHEET FOR G702 - 1992 EDITION - AIA® - © 1822 67031992
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW., WASHINGTON, D.C. 200055232
CONTINUATION SHEET
AlIA DOCUMENT G703
PAGE 2 OF 2 PAGES
AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing
Contractor's signed certification is attached.
In tabulations below, amounts are stated to the nearest dollar.
APPLICATION NO:
APPLICATION DATE
: January 13,2016
PERIOD TO: January 1, 2016
: Preconstruction Phase No. 05
Use Column I on Contracts where variable retainage for line items may apply. AJAX'S PROJECT NO: 201423
A B c D E F G H 1
WORK COMPLETED .
AJAXITEM ORIGINAL REVISED ]};ARI}ZT:;EI:\II'I/}II; COI\{P{‘;}%L‘) AND BALANCE TO RETAINAGE (IF
No. DESCRIPTION OF WORK s¢ ?,ifi%w SCI‘I:,"\?:?F‘ED PREVIOUSLY | 1 onrnion | STORED (NOT IN | STORED To DATE | @ O | FINISH(C-G) | VARIABLE RATE)
: e BILLED D ORE) (D+E+F)
BASIC A/E DESIGN FEES
BASIC A/E CONSTRUCTION ADMINISTRATION 147,840.00 295,042.00 - - - - 0% 295,042.00 -
CONSTRUCTION MANAGER FEES
CM CONSTRUCTION PHASE SERVICES 400,000.00 307,591.00 - - - - 0% 307,591.00 -
GRAND TOTALS