READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 04-24-12 regular — reading text
Part 6 of 13. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31257-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
were evaluated for the recent sidewalk projects using the unit prices of
the items that were necessary to accomplish typical sidewalk construction
projects. Through this evaluation process, Construction Services of Northwest
Florida, Inc. emerges as the apparent low bidder.
2. 6. Aker reviewing the submittals from each vendor, it was determined by the Purchasing
Division and staff that Construction Services of Northwest Florida, Inc. is the lowest
responsive, responsible bidder for ITB No. 12 -015.
3. FINANCIAL INFORMATION:
3. 1. The funding for the sidewalks and other items are programmed into the annual budget
for the Streets Division and the CRA under CIP 5306 - Sidewalk Improvement
Program.
3. 2. There is also funding within the CRA annual budget to construct the sidewalks and
curb and gutter for the Sound Side development.
4. RECOMMENDATION:
4. 1. Pursuant to City of Fort Walton Beach Code of Ordinances and the Purchasing Policies
and Procedures, Staff requests City Council award Invitation to Bid No. 12 -015 for the
Sidewalk Construction Annual Bid to the lowest responsive, responsible bidder meeting
all specifications, Construction Services of Northwest Florida, Inc. of Mary Esther,
Florida for an initial period of one ( 1) year with four (4) one ( 1) year options.
ATTACHMENTS:
ITB 12 -015 Bid, rabulation PDT)
PDF)
ITB 12 -015 Sidewalk Construction Bid Document
SIGNATURE BLOCK:
Completed 04/ 10/ 2012 9: 43 AM
Michael Beedic
Completed 04/ 17/ 2012 10: 21 AM
Finance
Completed 04/ 17/ 2012 10: 40 AM
Carole Jones
Completed 04/ 17/ 2012 1: 17 PM
City Manager
Pending
City Council
Packet Pg. 25
6. 2. a
12- 015 - Sidewalks Construction Aunael Bid - ITB 12- 1115 - Concrete Sidewalks, Curb & Gatter for
Walton Beach —
City of Po
UPDATED 04 -10 -2012 _[
Bid Opening - Annex Bldg: 03 0- 8-2012at230PM
Champion
Contraetors
IRO
pef Ro
pm5vrs
ConscrIs, afNW FI.
BASH BTU: Chit Price Unit Price
Quanit, Unit Unit Price
Description
Ram
50. 29
Concrete driveways 5" thick ( 3, 000 PSI C&28 days) SY 39 00 175. 00
1 Fiber Reinforced —
16. 00 1800
LF 1631
Rmeretr Sidcwalks( 4' Widex5 "Thick) 13. 000 PSI)
2
1800 22. 61
LP 2058
Coacrele Sidewalks ( 5 Widc x 5 ' Thick) ( 3, 000 PSI)
3
S24go 2000 2] 33
LF
Concrete Sidewalks(,- Wide x 5' Thick) (3, 000 PSI)
4
52971 52200 31. 50
LF
Concreta Sidewalks ( 7 - Wide x 5' Thick) ( 3, 000 PSI)
5
S3255 2400 3600
LF
Concrete Sldewalks( e - Wide x 5 ' Thick) ( 3, 000 PSI)
42500
6E Concrete ADA Curb Rem ( 3,000 PSI) EA
LF
886. 60
1939
425. 00
1500 1825
8 Rollback Cab& Gone, ( 3, 000 PSI) 1815
LF 519. 3] 15. 00
9 T' a' D " Curb & GoVo10000PS1) 51N25
LF 1939 IS OU
10 I e " Y" Curb & GU0er( 3, 000r )
1939 1000 14. 50
LF
Conuete Fiat Cmb( 24" Widc x F Thick)( 3, W0 PSI)
1050
II12 ConcreteDm Corb( 3000PSU LF 19. 37 SISOO
186. 01
Adjustment of Utilities ( Raising or Lowering a FA $ 31000 250, 00
13 Maximum of 6' 15. 02
11 JS 2400
SY $
14 Removal and Disposal of Exist,, Concrete 1425
SY $ 11] 8 24. 00
15 Removal and Dt,-. 1 of FxrstingA halt 2000 10. 50
SY $ 18. 60
16 Removal cad Disposal of Excavated Material 150. 00 30000
FA 531000
17 ADA Detectable Warning Deviee 1250 800
CY 81936
18 Sub ode 50. 55
SF $ 038 0. 40
19 Sod 122R 8F
Tonal Bid Price 5$ 1, 82536 1250, 90
BIIINOFES.
ALL HEMS QUOTED MUST BE IN COMPLIANCE WITH IHE SPECIFICATIONS ON THIS PAGE_ IF YOU ARE
I FAKING EXCEPTION- INDICATE' fHOSE EXCEPTIONS ON COMPANY LETTERHEAD AND ATTACH TO THIS
INVITATION TOBID. _ — —
SIGNS AND TRAFFIC CONTROL MEASURES AS PER FOOT' S
CONTRACTOR SHALL PROVIDE
MANUAL ON TRAFFIC CONTROL PROPER
AND SAFE PRACTRFS FOR STREETS AND HIGHWAY CONSFRUCTON,
2