READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 24, 2015 — I. g. City of FWB Interlocal for Landing — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
I. g. City of FWB Interlocal for Landing — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
and
uses.
• Increase park usage & intensity and reduce vagrancy.
• Provide water related activities and opportunities that
enhance visitor’s experiences and encourage them to stay
longer.
• Enhance the magnitude of events that can be held at the
Landing, bringing visitors back again and again.
Packet Pg. 22
1.d.a
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
MASTER PLAN DIRECTIVES
• Preserve & enhance the western portion of the
Landing.
• Preserve the mature trees throughout the park.
• Enhance the performance stage.
• Renovate the boardwalk and seawall.
• Preserve the existing playground and restroom
facility.
• Relocate the trash receptacles on the western side.
• Strategize the redevelopment of the Science
Center building.
Packet Pg. 23
PRELIMINARY CONCEPT
DESIGNS
1.d.a
Packet Pg. 24
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
PROPOSED DESIGN
1.d.a
Packet Pg. 25
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
1.d.a
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
IMPROVEMENT PLAN
• Phase 1: Waterfront Improvements
• Estimated Cost = $1.6 Million
• Primary elements include performance stage, seawall, boardwalk,
dock improvements, and coastal ecology demonstration area
• Phase 2: Upland Interior Improvements
• Estimated Cost = $1.0 Million
• Primary elements include interactive water feature, park signage,
picnic areas, and parking area improvements
• Phase 3: Street Frontage Improvements
• Estimated Cost = $0.4 Million
• Primary elements include on street parking and pedestrian crossing
improvements
Packet Pg. 26
1.d.a
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
PHASE 1 IMPROVEMENTS
• Phase 1: Waterfront Improvements (Estimated Cost =
$1.6 Million)
• “The Bowl” Event Lawn
• Seating Terraces
• Renovated Boardwalk & Seawall
• Covered Performance Stage
• “Passive” Boat Launch Area
• Coastal Ecology Demonstration Area
• Design & Permitting
• Site Demolition
• Design & Permitting completed in FY 2015-16
• Demolition & Construction to begin in late FY 2015-16 with
completion in FY 2016-17
Packet Pg. 27
1.d.a
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
PHASE 1 COST BREAKDOWN
• Phase 1: Waterfront Improvements (Estimated Cost =
$1.6 Million)
• Engineering Design = $100,000
• Permitting = $25,000
• Site Demolition = $170,000
• Covered Performance Stage = $450,000
• Seating Terraces = $250,000
• Seawall = $320,000
• Boardwalk = $285,000
Packet Pg. 28
1.d.a
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
PHASE 1 FUNDING
• Phase 1: Waterfront Improvements (Estimated Cost =
$1.6 Million)
• City of Fort Walton Beach FY 2015-16 CRA Revenues = $125,000
• Engineering Design = $100,000
• Permitting = $25,000
• FDEP NRDA Grant Funding = $285,000
• Boardwalk = $285,000
• Request for FY 2015-16 Okaloosa County TDC Funding =
$450,000
• Covered Performance Stage = $450,000
• Request for 2015 RESTORE Act Funding = $740,000
• Seating Terraces = $250,000
• Site Demolition = $170,000
• Boardwalk = $320,000
Packet Pg. 29
1.d.a
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
TDC FUNDING REQUEST
• Request for FY 2015-16 Okaloosa County TDC Funding =
$450,000
• Covered Performance Stage = $450,000
• A New Centralized Covered Performance Stage
enhances the Landing:
• Provides the ability to host larger events and festivals,
bringing in more visitors to the area
• Makes the Landing the Cultural Hub of the area
• Enhances the opportunities for visitors to return and stay
longer
• Allows the opportunity to expand events into surrounding
areas
Packet Pg. 30
QUESTIONS & DISCUSSION
1.d.a
Packet Pg. 31
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach
N
O N
I
J Q
M P
H K R M
L
A
G
C D
B
C
A. “The Bowl” Event Lawn J. Shade Structure & Picnic Seating
B. Seating Terraces K. Interactive Children’s Water Feature E
C. Renovated Boardwalk & Seawall L. Reconfigured Parking Lot
D. Covered Stage M. Relocated Trash Enclosure
E. Non-motorized Boat Launch N. Reconfigured Brooks Street Alignment PHASE 1 F
F. Coastal Ecology Demonstration Area O. Existing Entry Pavilion PHASE 2
G. Amphitheater P. Existing Playground
H. Event Staging Area Q. Existing Restrooms PHASE 3
I. Park Signage R. Redevelopment Opportunity
FORT WALTON BEACH LANDING
March 9, 2015
Packet Pg. 20
1.d.a
Attachment: I. d. FWB Landing Master Plan_PHASING (4118 : City of Fort Walton Beach Restore Act Matching Fund Request (Michael Beedie))
