database management. Of these servers, 16
are more than seven years old and need to be replaced as soon as possible. A
Packet Pg. 23
2.a.A
few of these can be moved to a virtual machine (VM) environment; however,
many of these systems are not conducive to VM and must be replaced. The
number of antiquated machines grows from 16 to 21 in Fiscal Year 2014. The
cost for replacement of these aging units in Fiscal Year 2014 is estimated at
$48,000.
The current tape library is over 6 years old and parts are no longer available.
Attachment: 2013-2014 Look Ahead (1361 : Look Ahead on Staffing, Projects and Infrastructure Needs)
Staff continues to juggle tapes and this old system needs to be replaced as soon
as possible before valuable data is lost. The modern way to manage backups is
through disk storage systems. The BCC needs to backup all VM data, and
County databases and files to meet Sunshine requirements. With current
software, an estimated 100 terabytes (100,000 gigabytes) of disk space is
needed. This will meet County growth over the next three years in order to keep
60-90 days of information on hand. The cost of such a system is estimated
between $150,000 and $200,000 for a solution, depending on the section’s
ability to utilize current backup software.
Okaloosa Fiber Optic System: Implementation of the Okaloosa County Fiber
Optic project began in 2001 with the purpose of reducing the growing annual
communication cost incurred by local governments while providing for an
avenue of growth as the technical needs for bandwidth rapidly increase.
Technology continues to be the primary mechanism leveraged by departments
and constitutional offices to increase efficiency and lower the operation cost of
local government. The fiber optic project is a proactive measure taken by the
Okaloosa Board of County Commissioners that has curbed communication
costs and provided an avenue for future growth.
The fiber optic system has expanded to connect all of the departments under
the Board as well as the Sheriff’s Office, Tax Collector, Property Appraiser, Clerk
of Courts and the Supervisor of Elections. The Judiciary, State Attorney and
Public Defender also are networked utilizing the fiber optic system. The
Supervisory Control and Data Acquisition, and Traffic operations also benefit
from this system. Communication cost for each of these entities is markedly
reduced as a result of the high speed network connections. Not only does fiber
play a major role in the support of the communication lines; but all telephone
traffic is now routed across the system as well.
To offset some of the implementation costs, the County has partnered with the
military and colleges on several occasions. This partnership has helped fund the
system and created redundant routes and expanded capacity.
In as much as the fiber optic system continues to save hundreds of thousands of
dollars annually, and in order to fulfill contractual obligations that have brought
millions of dollars to the County,
Packet Pg. 24
2.a.A
it is necessary to continue to sustain the system. Maintenance on the system
warrants an estimated budget of $325,000 annually.
Public Works
Stormwater Projects
Attachment: 2013-2014 Look Ahead (1361 : Look Ahead on Staffing, Projects and Infrastructure Needs)
COMPLETION
PROJECT DESCRIPTION DATE COST
Tooke Street Emergency repair of pipe collapse 2/2010 $22,330.00
Retention pond repair/pipe
Dairy Road replacement 5/2010 $17,029.00
Repair of failed structure/gulley
Old Bethel Road repair 8/2010 $204,402.00
2010 Total $243,761.00
Auburn Road Cross drain failure 2/2011 $25,321.00
Old Bethel Road Slip lined failing cross drain 3/2011 $32,124.00
Madison Street (Baker) System repairs 4/2011 $37,922.00
6th Street Pipe replacement 4/2011 $27,464.00
Fairchild Road (FEMA) Replaced old pipe with new pipe 5/2011 $15,683.00
Removed sediment from path of
Helms Farm Road creek 5/2011 $20,612.00
De La Parisienne System repairs 6/2011 $70,091.00
Ridgewood Avenue Pipe slip lined 6/2011 $16,138.00
CR2 east of Hwy 393 Pipe slip lined 6/2011 $9,672.00
Melton Road @ #955 Replaced failing culverts 6/2011 $16,364.00
Aaron Baker Install drop box and repair swale 7/2011 $37,439.00
Dorchester Place Holding
Pond Repair and enlarge holding pond 7/2011 $24,716.00
Oak Hill @ #6101 Replaced two culverts 8/2011 $49,901.00
Okaloosa Lane Spillway Repair cross drain and spillway 8/2011 $13,719.00
Earl Campbell Road (Assist Repaired washout/const rip rap
City of Laurel Hill) basin 9/2011 $18,636.00
Hwy C4A Ditch repair 9/2011 $66,133.00
New Ebeneezer Road Replace failed cross drain 9/2011 $16,619.00
Facility Maintenance
Holding Pond Construct new holding pond 10/2011 $11,398.00
PJ Adams Construct new headwall 11/2011 $9,135.00
Install inlet boxes and pipe to
Lunnie Barns retention area 11/2011 $12,579.00
1st Avenue Pipe replacement and install inlets 11/2011 $58,046.00
Packet Pg. 25
2.a.A
Old Ebeneezer Road Construct swale 12/2011 $20,623.00
2011 Total $610,335.00
Springhill Road Replaced structures & inlets 1/2012 $44,372.00
Gibson Pond (Joint proj w/
FWB) Install structures/upgrades/outfall 2/2012 $134,268.00
Attachment: 2013-2014 Look Ahead (1361 : Look Ahead on Staffing, Projects and Infrastructure Needs)
Replaced structures & pipe slip
Stonebridge lined 3/2012 $26,879.00
Atwell Road Pipe replacement 3/2012 $37,873.00
Vinson Ray Road Replaced driveway culverts 4/2012 $22,383.00
Emergency repair to blow out in
East Williams road 4/2012 $75,720.00
Tanglewood Pond Install new overflow structure 5/2012 $15,551.00
Bay Cove Lane @ #5 Repair failing pipe and outfall 6/2012 $21,714.00
10th Avenue @ library Construct swale and pave area 6/2012 $21,571.00
Emergency repair of failing cross
Monahan Drive drain 7/2012 $46,721.00
Lake Ella Road Pipe replacement 9/2012 $11,812.00
Pocahantas Pipe replacement 10/2012 $11,073.00
2012 Total $469,937.00
Gap Creek Grant Match Grant total $1M In progress $300,000.00
6th Street (btwn 5th & 6th Pipe replacement (Materials on
Ave. Shalimar) order) Materials Est. $35,000.00
Captial Improvement Projects 2014 – 2017
Regional Improvement - phased
Port Dixie - Phase 1 approach 2014 $150,000.00
Regional Improvement - phased
Northern Pines - Phase 1 approach 2014 $150,000.00
Regional Improvement - phased
Port Dixie - Phase 2 approach 2015 $150,000.00
West County Regional - Regional Improvement - phased
Phase 1 approach 2015 $150,000.00
West County Regional - Regional Improvement - phased
Phase 2 approach 2016 $250,000.00
Hunington Subdivision Stormwater System inadequate 2016 $150,000.00
West County Regional - Regional Improvement - phased
Phase 3 approach 2017 $250,000.00
Lancaster Regional - Phase Regional Improvement - phased
1 approach 2017 $250,000.00
* all dates are expressed in Fiscal Year
Packet Pg. 26
2.a.A
Road Projects
Fiscal Year 2011
Attachment: 2013-2014 Look Ahead (1361 : Look Ahead on Staffing, Projects and Infrastructure Needs)
Preserved/treated hot mix roads (resurface list), $516,000
Preserved/treated cold mix roads (Yellow Bluff S/D, Bob Brooks Rd) $309,000
1 Mile dirt to pave, Keyser Mill Road Phase 1, $841,000
Fairchild Road Bridge Replacement, $115,000
Fiscal Year 2012
Preserved/treated hot mix roads (resurface list), $500,000
Preserved/treated cold mix roads, $200,000
Buck Ward Road, Fairchild/General Bond FDR & widen, $1.4M
Foxwood Phase 1, stormwater improvements and overlay, $250,000
West Plympton Road, dirt to pave, $200,000
Clear Creek, dirt to pave, $115,000
General Bond, FDR, $200,000
Keyser Mill Road, dirt to pave, $150,000
Hwy 393 Phase 1, Hwy 90 to Poverty Creek, widen and FDR, $1.5M
Hwy 393 Phase 2, $550,000
Lake Ella Bridge Replacement, $170,000
Millside Road Bridge Replacement, $200,000
Millings (dirt to Asphalt Millings Surface) $154,000
Fiscal Year 2013
Preserve/treat hot mix roads (resurface list), $500,000
Preserve/treat cold mix roads, $200,000
Millings (dirt to Asphalt Millings Surface) $175,000
Foxwood Phase 2, stormwater improvements and overlay, $250,000
Fairchild Road, dirt to pave $1M (Total project cost $2.5M)
Okaloosa Lane, dirt to pave from Aplin to Serenity Lane $1.4M (Total project
cost $2M)
Green Acres Blvd, $50,000 (total project cost $1M)
MLK FDR $100,000 (total