READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 12, 2013 (meeting #1122) — reading text
Part 22 of 25. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
Goal 1 Maintain all Okaloosa County Parks and facilities (buildings and
play structures) to meet or exceed safety standards and guidelines, are
structurally sound, and in compliance with state and county regulatory
codes.
Objective To be proactive by inspecting parks and facilities, making
minor repairs immediately, generating work orders for repairs or service,
and keeping grounds clear and free of potential hazards or risks.
Action/Strategies
a) Provide in-house training of grounds keeping staff on all
proper guidelines as it relates to grounds keeping duties, allow
staff time to attend classes to obtain CEU’s for maintaining
Lawn and Ornamental Spray License; maintain all Parks
Groundskeepers personnel with active Limited Lawn and
Ornamental Pest Control licenses
b) Grounds equipment maintenance costs will be tracked by
work order; these costs will be used to prioritize replacement
c) Reduce vandalism by implementing a “Park Host Program” at
2 rural County parks (Wilderness Landing, Garden City)
d) Provide adequate park lighting that will provide for night time
observation of the property but will deter unapproved after
hours use.
e) Provide periodic visual inspections of all play structures in
county parks, minimum of 3 times a year. Provide in depth
inspections on a minimum of 2 play structures a year,
inspections performed by an in-house Certified Playground
Safety Inspector (CPSI)
f) Increase ADA features for accessibility in parks amenities to
include: play structures, picnic tables, water fountains, urinals,
hand rails, sidewalks, parking, etc. When older non-accessible
amenities require replacement, replacement will be with new
ADA compliant components.
62
Packet Pg. 102
4.a.A
Goal 2 Maximize park availability countywide.
Objective To efficiently utilize funds and resources throughout the
County
Action/Strategies
a) Identify possible land purchases for the construction of one
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
new park in areas not meeting the National Recreation and
Parks Association (NRPA) guidelines for service areas. Utilize a
rotational system whenever possible in the development of
new parks
b) Research through cooperative partnerships, areas that could
provide the potential construction of County parks. These
partnerships include the Military, School Board, Division of
Forestry, Northwest Florida Water Management, residential
developments and others
Goal 3 Reduce the demand for energy, lower monthly utility costs and
utilize environmentally safe cleaning products for park facilities
Objective To decrease operating expenses in County and
Unincorporated Parks, and to promote sustainability
Action/Strategies
a) Encourage all sports associations, sports organizations, or
groups using County facilities schedule as many activities as
possible in daylight hours to help reduce the electrical
charges at the facilities. Provide each
association/organization with information outlining historical
energy consumption at these facilities.
b) Reduce the daily lighting usage at the Baker Area
Recreational Association’s covered arena. Work together with
the association on reducing energy consumption by 10%
c) Install motion activated sensors for lighting in 4 park restrooms
d) Install photo cells for outdoor parking lot lighting at 2 beach
access ways
e) Monitor all monthly utility bills including: gas, water, sewer and
electricity. Maintain historical information on these costs for
potential future cost savings and future years budgeting
f) Replace the use of non-environmentally safe products with
products that reduce the health and environmental impacts
at parks facilities
63
Packet Pg. 103
4.a.A
Goal 4 Implement a comprehensive Playground Management Plan to
provide information relating to playground amenities for management
of long term replacement goals.
Objective To provide documentation and justification of the needs and
usage of allocated funding
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
Action/Strategies
a) Gather information on play structures, rubber surfacing,
buildings, boat ramps, lighting, fencing, sod, pavilions, etc.
such as: year constructed, type and brand of equipment
installed, manufacture contact information, inspections,
repairs, projected life expectancy, and anticipated
replacement
b) Utilize computer related software with a Parks component to
manage data gathered during periodic visual playground
inspections to create detailed reports that can be used for
component replacement
c) Respond to external and internal complaints within 24hrs, and
create a work order, prioritizing for safety related issues, and
for other issues providing appropriate minor repairs within 5
working days
d) Review collected infrastructure data for budgeting of
projected funding in the most efficient and beneficial manner
ROADS DIVISION
GOALS, OBJECTIVES & STRATEGIES
Goal 1 Increase the mileage of roads that receive preservation
treatments and start a rehabilitation program for base stabilized roads
Objective To extend the lifespan of existing improved roads
Action/Strategies
a) Rehabilitate base stabilized roads exploring various methods
b) Implement pavement preservation techniques
c) Stripe paved roads
64
Packet Pg. 104
4.a.A
Goal 2 Pave 7.78 miles of dirt road
Objective To reduce the number of unpaved roads by 15% over the
next five years by a combination of road paving and base stabilization
Action/Strategies
a) Pave Okaloosa Lane (0.38 miles)
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
b) Pave a portion of Keyser Mill Road (1.8 miles)
c) Pave Fairchild Road North (1.8 miles)
d) Pave Robinson, State Line, Davis and Gilmore Roads (3.8 miles)
Goal 3 Implement a methodical program of replacing inefficient
construction equipment with modern, economical equipment that will
maximize productivity
Objective To optimize reduced personnel and improve processes by
obtaining more efficient construction equipment
Action/Strategies
a) Review and assess processes that are impacted by inefficient
equipment
b) Determine and evaluate efficiencies to be gained by
purchasing vs. leasing new equipment
c) Develop a program to determine the best use of existing
funding to purchase or lease equipment
ARTIFICIAL REEF DIVISION
GOALS, OBJECTIVES & STRATEGIES
Goal 1 Deplete current inventory of Materials of Opportunity for reef
construction and deployment
Objective To decrease the inventory of Materials of Opportunity
through the construction of Artificial Reefs
Action/Strategies
a) Aggressively pursue funding sources for reef construction
b) Review and submit grant opportunities
c) Visit local municipalities to market benefits of reef
construction
d) Solicit additional funding through the TDC
65
Packet Pg. 105
4.a.A
Goal 2 Increase the probability of securing Florida Fish and Wildlife
Conservation Commission (FWC) grants for artificial reef construction
and monitoring
Objective To update repetitive content in the FWC application
package
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
Action/Strategies
a) Update 5-Year Plan
b) Solicit Community Support Letters
Goal 3 Increase involvement with the newly formed Marine Advisory
Board
Objective To use the MAB as a productive pool of technical support for
the artificial reef program
Action/Strategies
a) Set up communications strategy between MAB members
b) Encourage participation by elected officials
c) Attend meetings with a prepared agenda
d) Develop reef program promotional/educational flyers
e) Develop reef program PowerPoint presentation showing
past, present and future reef program goals
Goal 4 Reauthorize 5-Year Large Area Artificial Reef Site (LAARS) Permit
Objective To reauthorize the United States Army Corps of Engineers
(USACE) LAARS permit by March 31, 2013
Action/Strategies
a) Communicate with USACE
b) Respond to Requests for Additional Information
c) Complete Reef Density Calculations
d) Promote LAARS for Natural Resource Damage Assessment
(NRDA) Projects
66
Packet Pg. 106
4.a.A
SOLID WASTE DIVISION
GOALS, OBJECTIVES & STRATEGIES
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
Goal 1 Meet or exceed regulatory requirements for landfills
Objective To achieve full compliance with long-term care permits and
remediation plan criteria
Action/Strategies
a) Institute project controls that will provide appropriate
planning, scheduling and budgeting of project activities to
ensure regulatory compliance
b) Use work orders to accurately account for remediation and
compliance work tasks
c) Improve and reinforce positive cooperation relationships
between stakeholders
d) Provide training for staff on importance of work
accountability and its impact on regulatory compliance
e) Execute work elements in a timely fashion to avoid schedule
conflicts
Goal 2 Achieve optimal performance of remediation
