READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 12, 2013 (meeting #1122) — reading text
Part 21 of 25. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
The Public Works Department’s mission is to provide infrastructure and
quality of life related services to the residents and visitors to Okaloosa
County. The Department accomplishes this mission through its six divisions:
Engineering, Traffic Operations, Roads, Stormwater, Environmental
Services, Parks and Administrative Services.
VISION STATEMENT
Over the next five years the Public Works Department will continue to
monitor operational efficiencies and mission effectiveness in the face of
declining resources. The challenges presented to the department will be
met through innovative solutions to common infrastructure issues; along
with a strong commitment to maximizing the revenue sources available to
support departmental initiatives.
OPERATIONS PHILOSOPHY
We believe in being helpful, reliable, open, honest, accessible, responsive
and well informed. We will solve problems and will pay attention to cost-
effectiveness and fiscal responsibility. We have respect for and
appreciation of the public and are dedicated to providing the highest
quality services for all who live in and visit our community.
56
Packet Pg. 96
4.a.A
ENGINEERING DIVISION
GOALS, OBJECTIVES & STRATEGIES
Goal 1 Monitor the quantity and quality of construction level
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
documents produced by in-house staff
Objective To maintain the most effective drafting standards to be
utilized by the Engineering Division
Action/Strategies
a) Utilize drafting standards based on accepted engineering
practices
b) Draft and inventory approved standard details and drawing
criteria
c) Maintain the QA/QC protocol for the development and
release of construction documents
d) Require all document requests be provided to and scheduled
through the design engineer
Goal 2 Monitor the effectiveness of recently amended minimum
standards related to construction and development with respect to the
financial constraints of the development community while providing an
acceptable level of standards for the citizens of Okaloosa County
Objective To ensure that development standards are reasonable to
allow for continued growth while maintaining acceptable levels of
standards
Action/Strategies
a) Participate in regular Governmental Affairs committee
meetings with the BIA
b) Identify codified language that becomes problematic to the
development process
c) Obtain input from staff related to the proposed changes
d) Conduct periodic workshops with interdepartmental staff and
the building community to discuss recent revisions and any
proposed changes
57
Packet Pg. 97
4.a.A
Goal 3 Maximize the efficiency of available staff and reduce overall
project design duration
Objective To minimize the amount of time projects are in design when
construction funding is available determine which projects are best
suited for in-house versus external design
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
Action/Strategies
a) Assess each individual project timeline and budget
constraints to determine which projects shall be completed
by in house staff or an on board consultant
b) Coordinate with utility entities at no later than the 60% design
effort
c) Utilize concise boilerplate specifications for all Public Works
led projects
d) Work with partnering agencies to streamline the planning,
design and permitting process for alternatively funded
projects to ensure timely completion
e) Participate in monthly area utility coordination meetings to
provide utility providers with as much advance notice as
possible of upcoming projects
Goal 4 Maintain intradepartmental coordination standards to ensure
projects comply with all applicable federal, state and local standards
for design and construction from concept to completion
Objective To ensure that all projects performed with in-house resources
comply with all applicable design and construction standards
Action/Strategies
a) Program annual budget funding to be used as grant match
for
projects supported with federal and state dollars
b) Coordinate with Purchasing and Contracts & Grants
departments to develop a pre-approval checklist to ensure
projects are approved and granted dollars are expensed to
the expiration of the grant term
c) Track staff time, tasks and expenses relative to each project
to measure the effectiveness of completing projects on time
58
Packet Pg. 98
4.a.A
MOSQUITO CONTROL DIVISION
GOALS, OBJECTIVES & STRATEGIES
Goal 1 Maintain an aggressive larviciding program through expansion
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
of gambusia fish applications and breeding sites
Objective To reduce adult mosquito populations
Action/Strategies
a) Use Vector Control Management System (VCMS) to optimize
larviciding efforts and reduce chemical usage
b) Identify and nurture additional gambusia breeding sites to
reduce travel costs and response time for application
c) Identify, document and verify mosquito breeding sites using
existing hand-held GPS and data recorder systems
d) Develop efficient multi-site treatment routes to reduce travel
costs
Goal 2 Increase efficiency of existing equipment
Objective To develop and implement a process plan to extend the
useful life of the MC equipment inventory
Action/Strategies
a) Development of Equipment Maintenance Log
b) Review State Mosquito Control Program Equipment Surplus
Offerings when available
c) Consistent response to Vehicle Maintenance notifications
from Fleet
Goal 3 Develop Mosquito Control Program assessment tools
Objective To communicate Mosquito Control Program activities and
accomplishments to stakeholders
Action/Strategies
a) Develop a process to extract VCMS data and import into
Google Earth to generate mapping of project and program
maps
b) Expand County internet website to more efficiently
communicate Mosquito Control activities, observations and
strategies
c) Develop an integration plan for VCMS and existing work order
program to maximize reporting capabilities
59
Packet Pg. 99
4.a.A
Goal 4 Maintain compliance with state grant program which funds a
portion of the Mosquito Control Program
Objective To achieve and maintain 100% compliance with state grant
criteria
Action/Strategies
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
a) Create electronic schedule of grant deliverables
b) Train supervisor and foreman for most informed awareness of
grant criteria
c) Develop a quality control process for review of grant
documents
d) Improve ability to fully utilize grant funding by establishing
communication protocol between FDACS, Contracts &
Grants Department and Mosquito Control Program
RECYCLING DIVISION
GOALS, OBJECTIVES & STRATEGIES
Goal 1 Develop a strategy for increasing recycling participation within
Okaloosa County in both the residential and commercial sector
Objective To reduce overall waste disposal as good stewards of the
environment and evaluate recycling material as a sustainable revenue
source
Action/Strategies
a) Send out promotional material to multi-family complexes and
businesses encouraging them to consider recycling options
via contract haulers
b) Work with the construction and demolition (C&D) debris
industry to institute C&D recycling
c) Work with Okaloosa Environmental Council and Okaloosa
Citizens Alliance and Greater Fort Walton Beach Chamber to
promote residential and commercial recycling opportunities
d) Continue efforts to expand enhanced recycling services
throughout the franchised areas of Okaloosa County via
1+1+1 service through contract hauler
60
Packet Pg. 100
4.a.A
Goal 2 Research a market center for the materials generated at the
Wright Yard Waste Facility and Baker Landfill
Objective To develop a revenue stream from processed yard waste
Action/Strategies
a) Establish agreements with vendors identified in the innovative
Attachment: 2013-2014 Strat Plan (1360 : Overview of Proposed FY 2014 Strategic Plan and Board Direction)
grant beneficial market analysis to purchase the by-products
of the Recycling Section’s yard waste processing operations
b) Continue to research technologies and methodologies that
can provide a more beneficial market for the end product
c) Within the rate structure, establish a fund for equipment
replacement cost
Goal 3 Manage white good and waste tires in the most efficient and
cost-effective way while maintaining regulatory compliance
Objective To develop a revenue stream to offset declining Municipal
Solid Waste (MSW) revenues and to promote proper disposal of these
items to deter illegal dumping
Action/Strategies
a) Promote existing disposal opportunities to local residents
b) Educate the public on the adverse effects of illegal dumping
of these items through events such as Earth Day and America
Recycles Day
61
Packet Pg. 101
4.a.A
PARKS DIVISION
GOALS, OBJECTIVES & STRATEGIES
