READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 4, 2014 — Project breakdown — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 86-Project breakdown.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

ITEM NAME OF PROJECT: CONTRACTORS NAME: ADDRESS: SUBSTANTIAL COMPLETION DATE: FINAL COMPLETION DATE: JOB NO. 41-444 DESCRIPTION Furnish and install all materials and labor for pre-inspection cleaning in 8" gravity sewer pipe prior to in situ point repairs as described in the specifications Furnish and install all materials and labor for pre-inspection cleaning in 10" gravity sewer pipe prior to in situ point repairs as described in the specifications Furnish and install all materials and labor for pre-inspection cleaning in 12" gravity sewer pipe prior to in situ point repairs as described in the specifications Furnish and install all materials and labor for CCTV inspection in 8" gravity sewer pipe prior to in situ point repairs as described in the specifications Furnish and install all materials and labor for CCTV inspection in 10" gravity sewer pipe prior to in situ point repairs as described in the specifications 2011 Gravity Sewer Rehab Insituform Technologies, LLC. 17988 Edison Ave. Chesterfield, MO 63005 Annual Contract thru May 24, 2014 As Bid Quantities 2,203 LF 3,264 LF 1,685 LF 2,203 LF 3,264 LF NIT IC Additional Total Contract Bid Total "Quantities Additional Cost Revised Cost E sid total rr (CO #1) (Bid + Change or) — Orders) 150 $ 330450 44674 $ 67,006.50 70,311.00 2.00 $ 6,528.00 $ - 6,528.00 2.00 $ 3,370.00 732 $ 4,464.00 4834.00 100 $ 2.20300 44671 = «$44,674.00 46,874.00 150 $ 4,896.00 $ : 4,896.00 Page 1 of 3 - ee Total Contract Additional Cost Revised Cost Additional ITEM . wg UNIT . : Fcgege | ‘NO. DESCRIPTION As Bid Quantities PRICE Bid Total : OSH 2 (CO#) (Bid + Change 6 Furnish and install all materials and labor for ae | CCTV inspection in 12" gravity sewer pipe prior to in situ point repairs as described in | Aine ee the specifications 1,685 LF $ 1.50 $ 2,027.90 732) $ 1,098.00 $ 3,625.50 7 Furnish and install all materials and labor for | ee in-situ point repairs in 8" gravity sewer pipe 1 EA $ 1,900.00 $ 1,900.00 oe $ a = $ 1,900.00 8 Furnish and install all materials and labor for a ee oe in-situ point repairs in 10" gravity sewer pipe 93 EA $ 2000.00 $ 46,000.00 os os : 3 Q 8 gg 46,000.00 aoe ee Ld I 9 Furnish and install all materials and labor for in-situ relining of 8" gravity sewer pipe as described in the specifications 2,203 LF $ 25.00 $ 55,075.00 “40S ———S=«0,250.00§ 65,325.00 10 Furnish and install all materials and labor for uh ae a a in-situ relining of 10" gravity sewer pipe as described in the specifications 3,264 LF $ 26.00 $ 84,864.00 Ce Ge eg 84,864.00 11 Furnish and install all materials and labor for ose : in-situ relining of 12" gravity sewer pipe as described in the specifications 1,685 LF $ 29.00 $ 48,865.00 . 200 $5800.00 $ 54,665.00 12 Furnish and install all materials and labor for ee ee service re-connections in 8" gravity sewer pipe as described in the specifications 3 EA $ 200.00 $ 600.00 | ogee _-. = 600.00 13 Furnish and install all materials and labor for hs service re-connections in 10" gravity sewer pipe as described in the specifications 5 EA $ 200.00 $ 1,000.00 ee Cbs $ 1,000.00 14 Furnish and install all materials and labor for He ee! point repairs in 8" gravity sewer pipe (if needed and directed by Engineer) as Loe ae ee described in the specifications 1 EA $ 5,500.00 $ 550000 § 9) 0B eo $ 5,500.00 Page 2 of 3 ITEM NO. 15 19 20 20 21 DESCRIPTION Furnish and install all materials and labor for point repairs in 10” gravity sewer pipe (if needed and directed by Engineer) Furnish and install all materials and labor for point repairs in 12" gravity sewer pipe (if needed and directed by Engineer) as described in the specifications Complete Mobilization and Demobilization for original project and any subsequent Task Order greater than $25,000 Emergency Mobilization and Demobilization for Task Order less than or equal to $25,000 Mobilization and Demobilization for Tuberculation Removal Furnish and install all materials and labor for tuberculation removal from 12" gravity sewer pipe as described in the specifications Furnish and install all materials and labor for tuberculation removal from 8" gravity sewer pipe as described in the specifications Furnish and install all materials and labor for root removal in 8" gravity sewer pipe prior to relining as described in the specifications As Bid Quantities | EA | EA 1 LS | LS LS LF LF LF 5,750.00 6,000.00 3,500.00 6,500.00 7,000.00 82.00 71.00 1.50 Totals Additional Total Contract "Additional Cost Page 3 of 3 . Re Revised Cost a OS*«COHA).«=SSCSs(Bid + Change {CO #1) pe ae Orders) $ 5,750.00 $ 5,750.00 $ 6,000.00 5. 6,000.00 $ 3,500.00 47 -$ ~~ 3,500.00 7,000.00 $ 6,500.00 See 6,500.00 § - 1 $ 7,000.00 7,000.00 $ , 200 $ 16,400.00 16,400.00 $ , 190. $13,490.00 13,490.00 § ; 15427“ (ss SS~S*«8 140.50 23,140.50 $ 288,383.00 $193,820.00 $ —-482,203.00

Download this text file with its original spacing ↓