READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — Project breakdown — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 86-Project breakdown.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
ITEM
NAME OF PROJECT:
CONTRACTORS NAME:
ADDRESS:
SUBSTANTIAL COMPLETION DATE:
FINAL COMPLETION DATE:
JOB NO. 41-444
DESCRIPTION
Furnish and install all materials and labor for
pre-inspection cleaning in 8" gravity sewer
pipe prior to in situ point repairs as described
in the specifications
Furnish and install all materials and labor for
pre-inspection cleaning in 10" gravity sewer
pipe prior to in situ point repairs as described
in the specifications
Furnish and install all materials and labor for
pre-inspection cleaning in 12" gravity sewer
pipe prior to in situ point repairs as described
in the specifications
Furnish and install all materials and labor for
CCTV inspection in 8" gravity sewer pipe
prior to in situ point repairs as described in
the specifications
Furnish and install all materials and labor for
CCTV inspection in 10" gravity sewer pipe
prior to in situ point repairs as described in
the specifications
2011 Gravity Sewer Rehab
Insituform Technologies, LLC.
17988 Edison Ave.
Chesterfield, MO 63005
Annual Contract thru May 24, 2014
As Bid Quantities
2,203 LF
3,264 LF
1,685 LF
2,203 LF
3,264 LF
NIT
IC
Additional
Total Contract
Bid Total "Quantities Additional Cost Revised Cost
E sid total rr (CO #1) (Bid + Change
or) — Orders)
150 $ 330450 44674 $ 67,006.50 70,311.00
2.00 $ 6,528.00 $ - 6,528.00
2.00 $ 3,370.00 732 $ 4,464.00 4834.00
100 $ 2.20300 44671 = «$44,674.00 46,874.00
150 $ 4,896.00 $ : 4,896.00
Page 1 of 3
- ee Total Contract
Additional Cost Revised Cost
Additional
ITEM . wg UNIT . : Fcgege |
‘NO. DESCRIPTION As Bid Quantities PRICE Bid Total : OSH 2 (CO#) (Bid + Change
6 Furnish and install all materials and labor for ae |
CCTV inspection in 12" gravity sewer pipe
prior to in situ point repairs as described in | Aine ee
the specifications 1,685 LF $ 1.50 $ 2,027.90 732) $ 1,098.00 $ 3,625.50
7 Furnish and install all materials and labor for | ee
in-situ point repairs in 8" gravity sewer pipe 1 EA $ 1,900.00 $ 1,900.00 oe $ a = $ 1,900.00
8 Furnish and install all materials and labor for a ee oe
in-situ point repairs in 10" gravity sewer pipe 93 EA $ 2000.00 $ 46,000.00 os os : 3 Q 8 gg 46,000.00
aoe ee Ld I
9 Furnish and install all materials and labor for
in-situ relining of 8" gravity sewer pipe as
described in the specifications 2,203 LF $ 25.00 $ 55,075.00 “40S ———S=«0,250.00§ 65,325.00
10 Furnish and install all materials and labor for uh ae a a
in-situ relining of 10" gravity sewer pipe as
described in the specifications 3,264 LF $ 26.00 $ 84,864.00 Ce Ge eg 84,864.00
11 Furnish and install all materials and labor for ose :
in-situ relining of 12" gravity sewer pipe as
described in the specifications 1,685 LF $ 29.00 $ 48,865.00 . 200 $5800.00 $ 54,665.00
12 Furnish and install all materials and labor for ee ee
service re-connections in 8" gravity sewer
pipe as described in the specifications 3 EA $ 200.00 $ 600.00 | ogee _-. = 600.00
13 Furnish and install all materials and labor for hs
service re-connections in 10" gravity sewer
pipe as described in the specifications 5 EA $ 200.00 $ 1,000.00 ee Cbs $ 1,000.00
14 Furnish and install all materials and labor for He ee!
point repairs in 8" gravity sewer pipe (if
needed and directed by Engineer) as Loe ae ee
described in the specifications 1 EA $ 5,500.00 $ 550000 § 9) 0B eo $ 5,500.00
Page 2 of 3
ITEM
NO.
15
19
20
20
21
DESCRIPTION
Furnish and install all materials and labor for
point repairs in 10” gravity sewer pipe (if
needed and directed by Engineer)
Furnish and install all materials and labor for
point repairs in 12" gravity sewer pipe (if
needed and directed by Engineer) as
described in the specifications
Complete Mobilization and Demobilization for
original project and any subsequent Task
Order greater than $25,000
Emergency Mobilization and Demobilization
for Task Order less than or equal to $25,000
Mobilization and Demobilization for
Tuberculation Removal
Furnish and install all materials and labor for
tuberculation removal from 12" gravity sewer
pipe as described in the specifications
Furnish and install all materials and labor for
tuberculation removal from 8" gravity sewer
pipe as described in the specifications
Furnish and install all materials and labor for
root removal in 8" gravity sewer pipe prior to
relining as described in the specifications
As Bid Quantities
| EA
| EA
1 LS
| LS
LS
LF
LF
LF
5,750.00
6,000.00
3,500.00
6,500.00
7,000.00
82.00
71.00
1.50
Totals
Additional
Total Contract
"Additional Cost
Page 3 of 3
. Re Revised Cost
a OS*«COHA).«=SSCSs(Bid + Change
{CO #1) pe ae Orders)
$ 5,750.00 $ 5,750.00
$ 6,000.00 5. 6,000.00
$ 3,500.00 47 -$ ~~ 3,500.00 7,000.00
$ 6,500.00 See 6,500.00
§ - 1 $ 7,000.00 7,000.00
$ , 200 $ 16,400.00 16,400.00
$ , 190. $13,490.00 13,490.00
§ ; 15427“ (ss SS~S*«8 140.50 23,140.50
$ 288,383.00 $193,820.00 $ —-482,203.00
