water ops at 833- 9630
7. Submit energy forms
8. Plans shall be approved by the hotel and restaurant commission prior to submission for
permitting review.
9. Show termite treatment procedure.
10. Engineer shall perform hunicane connector inspection and send letter of approval to this
office. .
191
4/25/ 06
Regular Council Meeting
SITE PLAN APPROVAL-STARBUCKS ( CONT)
11. Architect shall submit final letter of approval for building construction.
If/
Io...
IIII'
12. An as-built survey shall be submitted after slab inspection.
13. A compaction test shall be submitted.
14. Show bonding of all water, gas, steel in foundation.
15. Street number shall be Installed by final Inspection.
16. Water heater shall have a switched disconnect.
17. Mechanical units shall be physically secured.
Engineering Division Comments:
1. The address for this project will be 95 Eglin Parkway NE.
2. Stormwater management p1an must meet the City' s storrnwater regulations (Article VII of
the Land Development Code). Stormwater runoff from the entire site must be treated,
including runoff from the driveways.
3. Notice of approval from FDEP for the stormwater management plan must be provided
prior to the City' s approval for a building permit.
4. Must meet FDEP environmental regulations and FDOT standards for sediment and soil
erosion control.
5. Will need a utility easement for the storm drain.
Fire Insoection Comments:
1. Install key box.
2. Address numerals shall be a minimum of six inches on the building.
2) Prior to granting a Certificate of Occupancy:
a. The applicant will provide documentation of easements that allow for
continued vehicular
access in perpetuity through the property from the Uptown Station Shopping Center.
Mr. Patterson seconded motion and It carried unanimously with Holmes, Patterson, Campbell,
Tucker, Pullen, and Minich In favor (Hartwell absent).
SITE PLAN APPROVAL- ALCONESE TERRACE. 107/ 109 BROOKS STREET SE
Consideration of a request by applicant AI Rogerson, on behalf of owner Sawdog, LLC for site plan
include 21
approval of Alconese Terrace, consisting of the construction of two buildings to
residential/resort condominiums with 3, 000 SF of office space, to be built in two phases located at 107/ 109
Brooks Street SE. Building A, to be built in Phase I is located closer to the Santa Rosa Sound, is a five-
be built in Phase II
story building with ten ( 10) permanent residential condominium units. Building B, to
and is located closer to Brooks Street, is a four-story building with approximately 3, 000 SF of office space
on the first floor and eleven resort condominium units on the second to fourth floors.
The City Attorney announced a quasi-judicial proceeding and swore in those who planned to testify.
plan site
Ms. Fowler advised a letter was received from the applicant' s attorney, John Dowd, requesting
submitted that takes this
approvalfor Phase I of this project. A revised memo from Staff has been
only
request into account.
and the
Ms. Fowler explained that Phase I entails the construction of Building A along Santa Rosa Sound,
identifies Phase I
Duggan Cottage will remain intact during this phase. She informed that Council' s packet
and Phase II as the items that were submitted to the CRA Board at their April 5, 2006 meeting, and that
the CRA Board considered both phases as an entire project. Ms. Fowler reported the CRA recommended
denial a vote of 5-2, with the main reason relating to the Phase II development and the
status of the
by
Duggan Cottage during that phase. '
to the CRA
Ms. Fowler clarified that if the applicant moves forward with Phase II, they would have to return
and to Council for approval of that phase, and the project would have to meet all the requirements of the
Comprehensive Plan, the LDC, and the Urban Master Plan that would be in effect at that time.
192
Regular Council Meeting 4/25/ 06
SITE PLAN- ALCON ESE TERRACE ( CONTI
In the revised staff recommendation, Ms. Fowler informed that Staff supports approval of Phase I of the
site plan. She discussed each condition including changing the name of the project; the applicant granting
a 1o- foot boardwalk easement along Santa Rosa Sound to the City; revising the site plan to show only
Phase 1 demolition and construction activities; coordination with the City to revise the entrance drive to
include a landscaped buffer between the drive and existing Duggan Cottage and to provide on- site parking
space adjacent to the Duggan cottage; address solid waste disposal for Phase I; meeting all requirements
regarding archaeological mitigation and landscape plans; and that the condo documents and all
easements be reviewed by the City Attorney.
Ms. Fowler further informed that based on discussion with Mr. Dowd, Staff believes everyone is in
agreement with the conditions of approval and as such, the Staff report, including the letter from Mr. Dowd
and the revised Staff Memorandum dated April 25, 2006, were entered into the record.
Council discussion ensued as to whether or not the project should be returned to the CRA as separate
requests, since their denial was based on Phase II of the project. Ms. Fowler advised that at the CRA
meeting, copies of Phase I and Phase II were distributed, and the staff report discussed Phase I and II.
She informed the applicant wanted it as one development but it has always been discussed and presented
in the two phases. Ms. Fowler advised that In Staffs opinion, sufficient information was given for each
phase and that all comments from the CRA Board relating to Phase II are contained in the record and staff
report, along with drawings of both phases.
Further discussion included the condition to change the name of the project to something other than
Alconese Terrace. Ms. Fowler advised that for 911 and other safety issues, the name could be confusing
if there was a misunderstanding in communication and emergency services were sent to Alconese Avenue
rather than Brooks Street, where the project is planned. She advised the applicant has agreed to change
the name of the project.
John Dowd, attorney representing the applicant, advised the applicant agrees with the recommendations
of Staff for approval of Phase I. However, he informed that at the CRA meeting, positive comments were
directed at Phase I; it was Phase II that was the concern. Mr. Dowd commented that the developers have
worked to create a project the City would be proud of, and have complied with every requirement or
recommendation that the City has asked for. He stated the name change was agreed to at the CRA
meeting due to the fact that so many conditions rested on approval of the project, and that in reality, they
would like the name to remain Alconese Terrace. Mr. Dowd informed that pre- marketing has been done
using that name, and the name was chosen because of the local historical significance.
Council asked Mr. Dowd if his clients agreed with Staffs recom~ endations as presented in the Revised
Staff Report. Mr. Dowd responded they agreed to everything except the changing of the name of the
project.
Dr. Pullen moved to deny the site plan for Alconese Terrace. Motion died for lack of a second.
Mr. Tucker stated he favors approval of the project with the deletion of condition 1 a, which is to change the
name of the project to something other than Alconese Terrace.
Mr. Tucker moved to approve the site plan for Phase I for Alconese Terrace Condominium, to be
located at 107/ 109 Brooks Street,to include the following conditions: Note: This recommendation
is based upon the application and site plan developed by Moore Bass Consulting of Destin Inc.
project #1508. 0001, dated March 23, 2006, revised 4/ 14/06) for Phase I of the project and the
architectural drawings and elevations developed by G. Mark Pepe, Architect,PC ( project Alconese
Terrace, dated 1/ 6/ 06) for Building A,Phase I.
193
4/25/ 06
Regular Council Meeting
SITE PLAN- ALCON ESE TERRACE (CONTI
1) Prior to issuance of a building permit for Phase I:
a. Revise the site plan to show only the Phase I demolition and construction activities,
including the boardwalk and a sidewalk along Brooks Street.
b. Coordinate with CDS and Public Works staff to:
1) Revise the entrance drive to include a minimum 5-foot landscaped buffer between
the drive and the existing Duggan Guest Cottage and to provide one parking space
adjacent to the cottage.
2) Address solid waste disposal for Phase I and revise the site plan as needed.
c. The project shall meet the requirements of LDC Section 12. 100. 03, Archaeological
the structures on site that are over 50 years old.
d. A landscape plan prepared by a professional landscape architect or nurseryman must
with a well. The plan shall include the Phase II portion of the site and shall identify
preserved trees on the site and include a note in the plan that states " No protected
trees identified for preservation on this plan shall be removed without documentation
from the City stating that the tree Is diseased, dead, or poses a hazard."
2) Prior to granting a Certificate of Occupancy the condominium association documents and all
easements shall be reviewed and approved by the City Attorney, and shall provide
documents
guarantees for