a policy and resolution regarding refunds at a future
meeting.
Dr. Pullen moved that a policy and resolution be established on the waiver of application fees. Mr.
Tucker seconded motion and It carried unanimously with Holmes, Patterson, Campbell, Tucker,
Pullen, and Minich in favor (Hartwell absent).
FINAL PLAT APPROVAL-SEXTONS SUBDIVISION. 636 COUNTRY CLUB AVENUE NE
Consideration of a request for final plat approval for Sexton' s Subdivision, a proposed replat of a parcel of
property into two ( 2) lots for the purpose of transfer of ownership of the individual lots. The property is
located at 636 Country Club Avenue NE and is made by Middleton Dowden, authorized agent for the
owners, James and Carolyn Sexton.
The City Attorney announced a quasi-judicial proceeding and swore in those who planed to testify.
Mr. Mitchell explained the request is a proposed replat of a parcel of property into two ( 2) lots for the
purpose of transfer of ownership of the individual lots. He reported the MPB recommended approval of
the project at their April 6, 2006 meeting.
As there were no objections, the Staff Report was entered into the record.
The Mayor opened the public hearing. As there was none, the public hearing was closed.
Mr. Holmes moved to approve the Final Plat for Sexton' s Subdivision located at 636 Country Club
Avenue NE. Mr. Campbell seconded motion and it carried unanimously with Holmes, Patterson,
Campbell, Tucker, Pullen, and Minich in favor (Hartwell absent).
SITE PLAN APPROVAL CONDITlONS-86 EGLIN PARKWAY NE
Consideration of a request by Donna Miller, agent for Commercial Service Merchandize (CSM) to discuss
the remaining site plan approval conditions of their Commercial Building, located at 86 Eglin Parkway NE
and 39 Carson Drive NE, prior to the issuance of a certificate of occupancy.
The Mayor announced this item was pulled from the agenda at the request of the applicant.
SITE PLAN APPROVAL-STARBUCKS. 95 EGLIN PARKWAY NE
Consideration of a request by applicant Jason Carter, architect for MJM Architects, on behalf of owner 99
Eglin LTO, for site plan approval of Starbucks Restaurant, a commercial building located at 95 Eglin
Parkway NE, on an out parcel of the Uptown Station Shopping Center, consisting of the construction of a
1, 750 SF prototypical Starbucks Restaurant to be located just north of the existing Baskin & Robbins
Restaurant on Eglin Parkway NE.
The City Attorney announced a quasi-judicial proceeding and swore in those who planned to testify.
Peggy Fowler, Planner, advised the CRA recommended approval of the project with conditions, and the
applicant is aware and agrees to these conditions.
189
4/ 25/ 06
Regular Council Meeting
SITE PLAN APPROVAL-STARBUCKS ( CONTI
As there were no objections, the Staff Report was entered into the record.
Jason Carter with Uptown Station presented a color rendering of the proposed project, and stated the
Starbucks organization is excited about being a part of the City.
The Mayor opened the public hearing. As there was none, the public hearing was closed.
Dr. Pullen advised he attended the CRA meeting when this item was discussed.
Mr. Campbell moved to approve the site plan for Starbucks at Uptown Station, to be located at 95
Eglin Parkway NE, with the following conditions: Note: This recommendation is based upon the
applicationand site GCT, Inc. (project Starbucks, dated March 17, 2006 and
plan developed by
revised April 12, 2006) and the architectural drawings and elevations developed by MJM Architects
project 26530.Q. 01, dated 9/ 27/ 05).
1) Prior to Issuance of a building permit:
a. In order to meet the perimeter landscaping requirements along Eglin Parkway NE, the
applicant must be granted City Council approval pursuant to Section 12. 714.10 of the LDC
that allows for a reduction of the 10' perimeter area to a 5' perimeter area, as long as there is
at least ten feet between the property line and the street,which Is applicable In this ca$ e.
The location of the plantlngs needs to be approved through review of the required landscape
and irrigation plan.
b. A landscape plan prepared by a professional landscape architect or nurseryman must be
submitted and approved by CDS staff. The plan must comply with all applicable regulations
In Sections 20- 1836 through 20- 1834 of the LDC. Design for an Irrigation system with a well
must be provided.
c. The plans must address all applicable items submitted by Public Works/ Engineering,
March
Building Inspections, and Fire departments staff In memorandums distributed at the
10, 2006 DRC meetings as follows:
Utilities Comments:
1. The second page of the Concurrency Compliance Review Form shall be completed and
resubmitted to the City for review and approval. The following ltem(s) shall be calculated
prior to resubmlttal: Total number of ERCs for the restaurant.
2. There is a 6" cast Iron water main available on the south side of Uptown Station, south of
the existing Baskin Robbins In an access alley for water service connections. The water
main is readily available for the required connections. A small asphalt cut maybe
required to make the required tap. The plans shall Identify the size of the tap, location
and size of the meter, and location and type of backflow preventer. The Developer shall
be responsible for installing the required backflow preventer and all onsite piping. The
meter.
City shall be responsible for all water main taps to the Installation of the water
According to office drawings, there is a sanitary sewer manhole (MH 435)available
near
3.
6"
the southwest comer of the existing Baskin Robbins. The plans show a proposed
service line connecting to this manhole. Location of the sewer tap must be field verified.
The Developer shall be responsible for all onslte sewer installation and the connection to
the existing manhole. The sizes and locations of the existing sanitary sewer manholes
and mains shall be verified prior to approval of this development.
4. The proposed Utility Plan requires a 6" sewer connection to an existing manhole and a 2"
water service tap off an existing 6" cast iron water main. Backflow preventers are
shall
required on all water service lines and shall be Installed on private property. Meters
be installed in a righto- f- way or easement The City shall be responsible for making the
The
required 2" water service tap on the existing 6" main and installing the water meter.
shall be for installing the backflow preventer, the 2" water service
Developer responsible
main, the 6" sewer service lateral, and connecting to the existing manhole.
190
Regular Council Meeting 4/ 25/ 06
SITE PLAN APPROVAL-STARBUCKS ( CONTI
5. Water meters are to be accessible to the water meter readers and located in an area not
susceptible to heavy traffic, preferably a grassed area, not in a driveway or parking
space.
6. It is the responsibility of the Developer's engineer to determine if FDEP and/ or FDOT
permitting Is required for the water or sewer services.
7. Water and sewer Impact fees shall apply to the new development. The Developer must
complete an ERC Determination Form based on the table provided in the Impact fee
ordinance or estimated water and wastewater flows. Based on the estimated water and
wastewater flows, the number of ERCs' Is estimated at 1. 55 for water and 1. 81 for
wastewater.
S. Water and sewer impact fees shall apply to all units: Total Water ERCs= A~erage Daily
Demand/350 gpd; Total Wastewater ERCs= Average Dally Demand/300 gpd; Water is $700
per ERC and sewer is $ 807 per ERC. The total estimated impact fees based on the
estimated water and wastewater flows are $ 1, 085 for water and $1, 460.67 for wastewater.
9. Water and sewer connection fees shall be determined when the final utility plan has been
submitted and approved. Based on the preliminary utility plan, the connection fees are
1, 000 for water and $600 for sewer. This does not Include potential fees for pavement or
sidewalk cuts or any other additional fees that may be necessary.
10. The development must meet FDEP environmental regulations and FDOT standards for
sediment and soli erosion control. The proposed sediment and erosion control
measures shall be Installed prior to commencement of any demolition of existing
structures or construction of the proposed development.
11. The proposed sediment and erosion control measures shall be shown and identified on
the Demolition Plan. .
12. The plans shall not be approved until all required standard notes are included on the
r
plans.
13. The Utility Plan shows a 15" clay sewer connecting the existing manholes north and
south of the existing Baskin Robbins. The size and Inverts of this main shall be verified
prior to construction. The plans show an upstream invert of 10. 16' and a downstream
invert of 10. 17' .
14. The proposed 6" sanitary sewer service lateral shows a slope of 0.45%. Based on
engineering standards, the minimum slope for a 6" pipe is 0.49%. The material of the
proposed sewer service lateral shall be shown on the plans.
15. The construction plans shall include a detail sheet depicting the proposed connection to
the sanitary sewer manhole, installation of the water and sewer service mains, and
installation of the proposed grease trap.
InsDection Comments:
1. Four complete sets of plans shall be submitted including site survey.
2. Submit a soil analysis.
3. Title page including occupant load.
4. Submit product approvals.
5. Show truncated dome for transition on sidewalks.
of our I
6. Show backflow preventor-put on notes that backflow will be