April 23, 2015

Okaloosa County BOCC — April 23, 2015 — I. d. FWB Landing Master Plan PHASING

I. d. FWB Landing Master Plan PHASING in the April 23, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the April 23, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1280). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used Mar 26, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
I. d. FWB Landing Master Plan_PHASING
Date
April 23, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
12
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

I. d. FWB Landing Master Plan PHASING — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 5.6 KB · 12

Download ↓

I. d. FWB Landing Master Plan PHASING — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 2.4 MB · 12

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

I. d. FWB Landing Master Plan PHASING — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

N O N I J Q M P H K R M L A G C D B C A. “The Bowl” Event Lawn J. Shade Structure & Picnic Seating B. Seating Terraces K. Interactive Children’s Water Feature E C. Renovated Boardwalk & Seawall L. Reconfigured Parking Lot D. Covered Stage M. Relocated Trash Enclosure E. Non-motorized Boat Launch N. Reconfigured Brooks Street Alignment PHASE 1 F F. Coastal Ecology Demonstration Area O. Existing Entry Pavilion PHASE 2 G. Amphitheater P. Existing Playground H. Event Staging Area Q. Existing Restrooms PHASE 3 I. Park Signage R. Redevelopment Opportunity FORT WALTON BEACH LANDING March 9, 2015 CITY OF FORT WALTON BEACH LANDING MASTER PLAN Okaloosa County Tourist Development Council April 23, 2015 GOALS & OBJECTIVES • Make the Landing a cultural hub for land & water activities. • Increase the options of activities available to visitors at the Landing. • Enhance the park for community events. • Improve the park for residents and visitors. • Promote economic vitality through increased activity and uses. • Increase park usage & intensity and reduce vagrancy. • Provide water related activities and opportunities that enhance visitor’s experiences and encourage them to stay longer. • Enhance the magnitude of events that can be held at the Landing, bringing visitors back again and again. MASTER PLAN DIRECTIVES • Preserve & enhance the western portion of the Landing. • Preserve the mature trees throughout the park. • Enhance the performance stage. • Renovate the boardwalk and seawall. • Preserve the existing playground and restroom facility. • Relocate the trash receptacles on the western side. • Strategize the redevelopment of the Science Center building. PRELIMINARY CONCEPT DESIGNS PROPOSED DESIGN IMPROVEMENT PLAN • Phase 1: Waterfront Improvements • Estimated Cost = $1.6 Million • Primary elements include performance stage, seawall, boardwalk, dock improvements, and coastal ecology demonstration area • Phase 2: Upland Interior Improvements • Estimated Cost = $1.0 Million • Primary elements include interactive water feature, park signage, picnic areas, and parking area improvements • Phase 3: Street Frontage Improvements • Estimated Cost = $0.4 Million • Primary elements include on street parking and pedestrian crossing improvements PHASE 1 IMPROVEMENTS • Phase 1: Waterfront Improvements (Estimated Cost = $1.6 Million) • “The Bowl” Event Lawn • Seating Terraces • Renovated Boardwalk & Seawall • Covered Performance Stage • “Passive” Boat Launch Area • Coastal Ecology Demonstration Area • Desi

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — April 23, 2015 — I. d. FWB Landing Master Plan PHASING.” April 23, 2015. I. d. FWB Landing Master Plan_PHASING. Crypt of Echoes evidence ID LED-2026-6c5fd4bf1ed745da88522f89a18edc7d. http://127.0.0.1:58097/evidence/LED-2026-6c5fd4bf1ed745da88522f89a18edc7d. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, I. d. FWB Landing Master Plan PHASING, meeting materials for April 23, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=8124&MeetingID=1280

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓