READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — 2013 meeting #1142 (date undetermined) — 1-7 Water & Sewer — reading text
Part 4 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 19-1-7 Water _ Sewer.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
internal projects as well as to attract new clients to our customer base.
The following projects are planned for FY2014:
Del Cerro II Well (construction) – install new potable water well in the Mid-County area to increase potable
water supply and reliability of the system.
Brooks Bridge Water Main Repair or Replacement (design & construction) – install a second water supply
line to Okaloosa Island (or repair the broken bore, if at all possible), which would then serve as the primary
water source to Okaloosa Island (and main on bridge would serve as backup).
Newcastle Area Water System Improvements (design & construction) – provide new, larger water mains to
the area and fire hydrants to provide increased fire protection and ensure the reliability of the system. This
project is funded by a Florida Department of Economic Opportunity Community Development Block Grant.
14
Bob Sikes Elevated Water Tank (design) – a second elevated water tank near the Bob Sikes Industrial Park
would provide for increased storage, reliability, and redundancy for the potable water and fire suppression
systems.
Ft. Walton Beach 36” Force Main (construction) – joint project with the City of Ft. Walton Beach to install
a 36” ductile iron force main on Roberts Blvd., the Ft. Walton Beach Golf Course, and Denton Blvd. to
replace 3 critical, aging force mains feeding the Arbennie Pritchett WRF.
Eglin Main Force Mains & Lift Stations (design & construction) – provide sewer service to Eglin Main
Base via 2 lift stations “inside the fence” and approximately 7 miles of piping. This project will divert all
wastewater flows from Eglin proper to the Arbennie Pritchett WRF.
Sanitary Sewer Rehab (construction) – install liners on terra cotta sewer pipes and aging manholes to reduce
the inflow and infiltration which is currently inundating the wastewater collection system.
Poquito Bayou Water Main & Force Main Bores (design & construction) – replace the aging, deteriorated
mains under Poquito Bayou with new directional bores.
Camp Rudder Force Main & Lift Station (design) – provide sewer service to Camp Rudder via 1 master lift
station and approximately 8.6 miles of piping. This project will divert all wastewater flows from Camp
Rudder to the Arbennie Pritchett WRF.
Diversion of the OCWS portion of Sewer flow to Niceville-Valparaiso Regional Sewer Board Plant (Design
& Construction) – Construct a new force main and pump station to divert OCWS sewer flow from NVRSB
to the Arbennie Pritchett WRF. This will consolidate flows and reduce overall wastewater treatment cost for
the flows from our county east service area. The East County Repump Station is planned to be constructed
in FY2014 and the East County Transmission Main (approx. 6.7 miles) is planned to be constructed in
FY2015. Project will also eliminate Rocky Bayou Lift Station.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY11/12 FY12/13 FY13/14
Footages/Miles of new mains and infrastructure 56,400/10.7 51,000/9.7 58,000/11.0
Construction projects started / completed (@ year end) 7/5 7/9 7/6
Input
Number of new sewer taps 145 80 90
Number of new water taps 188 110 120
Dollar value - new sewer taps $453,996 $400,000 $400,000
Output
Dollar value - new water taps $156,291 $160,000 $150,000
Efficiency
Effectiveness
15
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: PHYSICAL ENVIRONMENT
DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/MAINTENANCE
PROGRAM DESCRIPTION: This program is responsible for the repair and maintenance of 462.0 miles of
water distribution mains, 51.51 miles of service lines, 431.8 miles of sewer mains, 91.4 miles of sewer service
lines and 3,980 fire hydrants. It is a multi-discipline approach involving specialized crews.
REVENUE: The Water & Sewer enterprise fund receives all revenue through monthly customer billings,
capacity expansion charges and related ancillary charges for use of both the Water and Sewer systems within
the Okaloosa County service area. The funds customer base is currently in excess of 36,000 water service and
33,000 sewer service connections both residential and commercial.
EXPENDITURES:
Expenditures Budget
FY11 FY12 FY13 FY14
Category Actual $ Actual $ Original $ Approved $
Personal Services 940,661 817,917 966,528 1,028,593
Operating Expenses 2,288,455 2,238,458 1,413,395 1,390,700
Capital Outlay 220,591 441,528 1,067,480 1,637,647
Debt Service 511,696 533,956 1,155,925 1,158,781
Reserves 0 0 2,098,907 2,417,001
Total 3,961,404 4,031,859 6,702,235 7,632,722
HISTORICAL STAFFING SUMMARY:
Category FY11 FY12 FY13 FY14
Full-time 18 17 17 17
Part-Time 0 0 0 0
Relief 0 0 0 0
Total 18 17 17 17
16
MAJOR ACCOMPLISHMENTS LAST YEAR:
Main Island Lift Station (construction) – a new lift station was needed to replace the aging, failing, lift
station servicing all of Okaloosa Island. This project provides greater capacity and reliability to the Island
sewer system.
Duke Field Force Main & Lift Station (construction) – provided sewer service to Duke Field via a master
lift station “inside the fence” and approximately 7 miles of piping.
Rocky Bayou Force Main (construction) – replaced an aging 14” sewer force main transmitting all flow
from the East County Service Area (Bluewater Bay) to the NVOC Regional Sewer Plant. Project is part of a
phased plan to eliminate the Post Office Lift Station and Rocky Bayou Lift Stations.
Okaloosa Island Sanitary Sewer Rehab (construction) – installed a cured-in-place liner on terra cotta sewer
to reduce the inflow and infiltration which is currently inundating the wastewater collection system.
Ft. Walton Beach 36” Force Main (design) – joint project with the City of Ft. Walton Beach to install a 36”
ductile iron force main on Roberts Blvd. the Ft. Walton Beach Golf Course, and Denton Blvd. to replace 3
critical, aging force mains feeding the Arbennie Pritchett Water Reclamation Facility (WRF).
Meigs-Seminole Lift Station (design) – replace the aging and undersized Meigs-Seminole Lift Station,
which pumps all the wastewater from Bluewater Bay to the Niceville-Valparaiso Regional Sewer Plant.
Developed a new Valve Exercise Program to improve efficiency.
Repaired all water main breaks.
Repaired all sewer main breaks.
Performed water taps.
Performed sewer taps.
PROGRAM GOAL:
To be on call and ready to perform any repair to any facet of the Okaloosa County Water & Sewer Systems’
service area at any time 24/7/365. To handle all projects undertaken in a professional manner with a minimal
amount of service disruption to our customers.
KEY OBJECTIVES:
1. Ensure budgetary, personnel, customer service and purchasing functions comply with County policies and
procedures.
2. Preserve and protect infrastructure to provide quality of service to customers.
3. Maintain and extend the useful life and utility of County facilities.
4. Ensure the preservation and safe operation of all work related equipment.
5. To provide routine and preventative maintenance for the system.
6. To provide emergency response capabilities to prevent all but short term interruptions to service and
prevent system losses or environmental damage.
7. To maintain and improve key components of the Water & Sewer infrastructure.
The following projects are planned for FY2014:
Brooks Bridge Water Main Repair or Replacement (design & construction) – install a second water supply
line to Okaloosa Island (or repair the broken bore, if at all possible), which would then serve as the primary
water source to Okaloosa Island (and main on bridge would serve as backup).
Newcastle Area Water System Improvements (design & construction) – provide new, larger water mains to
the area and fire hydrants to provide increased fire protection and ensure the reliability of the system. This
project is funded by a Florida Department of Economic Opportunity Community Development Block Grant.
Ft. Walton Beach 36” Force Main (construction) – joint project with the City of Ft. Walton Beach to install
a 36” ductile iron force main on Roberts Blvd., the Ft. Walton Beach Golf Course, and Denton Blvd. to
replace 3 critical, aging force mains feeding the Arbennie Pritchett WRF.
17
Eglin Main Force Mains & Lift Stations (design & construction) – provide sewer service to Eglin Main
Base via 2 lift stations “inside the fence” and approximately 7 miles of piping. This project will divert all
wastewater flows from Eglin proper to the Arbennie Pritchett WRF.
Sanitary Sewer Rehab (construction) – install liners on terra cotta sewer pipes and aging manholes to reduce
the inflow and infiltration which is currently inundating the wastewater collection system.
Poquito Bayou Water Main & Force Main Bores (design & construction) – replace the aging, deteriorated
mains under Poquito Bayou with new directional bores.
Camp Rudder Force Main & Lift Station (design) – provide sewer service to Camp Rudder via 1 master lift
station and approximately 8.6 miles of piping. This project will divert all wastewater flows from Camp
Rudder to the Arbennie Pritchett WRF.
Diversion of the OCWS portion of Sewer flow to Niceville-Valparaiso Regional Sewer Board Plant (Design
& Construction) – Construct a new force main and pump station to divert OCWS sewer flow from NVRSB
to the Arbennie Pritchett WRF. This will consolidate flows and reduce overall wastewater treatment cost for
the flows from our county east service area. The East County Repump Station is planned to be constructed
in FY2014 and the East County Transmission Main (approx. 6.7 miles) is planned to be constructed in
FY2015. Project will also eliminate Rocky Bayou Lift Station.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY11/12 FY12/13 FY13/14
Miles of Sewer main / Maintenance Personnel