Okaloosa County BOCC — 2013 meeting #1142 (date undetermined) — 1-7 Water & Sewer — reading text

Part 4 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 19-1-7 Water _ Sewer.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

internal projects as well as to attract new clients to our customer base. The following projects are planned for FY2014:  Del Cerro II Well (construction) – install new potable water well in the Mid-County area to increase potable water supply and reliability of the system.  Brooks Bridge Water Main Repair or Replacement (design & construction) – install a second water supply line to Okaloosa Island (or repair the broken bore, if at all possible), which would then serve as the primary water source to Okaloosa Island (and main on bridge would serve as backup).  Newcastle Area Water System Improvements (design & construction) – provide new, larger water mains to the area and fire hydrants to provide increased fire protection and ensure the reliability of the system. This project is funded by a Florida Department of Economic Opportunity Community Development Block Grant. 14  Bob Sikes Elevated Water Tank (design) – a second elevated water tank near the Bob Sikes Industrial Park would provide for increased storage, reliability, and redundancy for the potable water and fire suppression systems.  Ft. Walton Beach 36” Force Main (construction) – joint project with the City of Ft. Walton Beach to install a 36” ductile iron force main on Roberts Blvd., the Ft. Walton Beach Golf Course, and Denton Blvd. to replace 3 critical, aging force mains feeding the Arbennie Pritchett WRF.  Eglin Main Force Mains & Lift Stations (design & construction) – provide sewer service to Eglin Main Base via 2 lift stations “inside the fence” and approximately 7 miles of piping. This project will divert all wastewater flows from Eglin proper to the Arbennie Pritchett WRF.  Sanitary Sewer Rehab (construction) – install liners on terra cotta sewer pipes and aging manholes to reduce the inflow and infiltration which is currently inundating the wastewater collection system.  Poquito Bayou Water Main & Force Main Bores (design & construction) – replace the aging, deteriorated mains under Poquito Bayou with new directional bores.  Camp Rudder Force Main & Lift Station (design) – provide sewer service to Camp Rudder via 1 master lift station and approximately 8.6 miles of piping. This project will divert all wastewater flows from Camp Rudder to the Arbennie Pritchett WRF.  Diversion of the OCWS portion of Sewer flow to Niceville-Valparaiso Regional Sewer Board Plant (Design & Construction) – Construct a new force main and pump station to divert OCWS sewer flow from NVRSB to the Arbennie Pritchett WRF. This will consolidate flows and reduce overall wastewater treatment cost for the flows from our county east service area. The East County Repump Station is planned to be constructed in FY2014 and the East County Transmission Main (approx. 6.7 miles) is planned to be constructed in FY2015. Project will also eliminate Rocky Bayou Lift Station. PERFORMANCE MEASURES: Actual Estimated Adopted Performance Measures FY11/12 FY12/13 FY13/14 Footages/Miles of new mains and infrastructure 56,400/10.7 51,000/9.7 58,000/11.0 Construction projects started / completed (@ year end) 7/5 7/9 7/6 Input Number of new sewer taps 145 80 90 Number of new water taps 188 110 120 Dollar value - new sewer taps $453,996 $400,000 $400,000 Output Dollar value - new water taps $156,291 $160,000 $150,000 Efficiency Effectiveness 15 BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA SERVICE AREA: PHYSICAL ENVIRONMENT DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/MAINTENANCE PROGRAM DESCRIPTION: This program is responsible for the repair and maintenance of 462.0 miles of water distribution mains, 51.51 miles of service lines, 431.8 miles of sewer mains, 91.4 miles of sewer service lines and 3,980 fire hydrants. It is a multi-discipline approach involving specialized crews. REVENUE: The Water & Sewer enterprise fund receives all revenue through monthly customer billings, capacity expansion charges and related ancillary charges for use of both the Water and Sewer systems within the Okaloosa County service area. The funds customer base is currently in excess of 36,000 water service and 33,000 sewer service connections both residential and commercial. EXPENDITURES: Expenditures Budget FY11 FY12 FY13 FY14 Category Actual $ Actual $ Original $ Approved $ Personal Services 940,661 817,917 966,528 1,028,593 Operating Expenses 2,288,455 2,238,458 1,413,395 1,390,700 Capital Outlay 220,591 441,528 1,067,480 1,637,647 Debt Service 511,696 533,956 1,155,925 1,158,781 Reserves 0 0 2,098,907 2,417,001 Total 3,961,404 4,031,859 6,702,235 7,632,722 HISTORICAL STAFFING SUMMARY: Category FY11 FY12 FY13 FY14 Full-time 18 17 17 17 Part-Time 0 0 0 0 Relief 0 0 0 0 Total 18 17 17 17 16 MAJOR ACCOMPLISHMENTS LAST YEAR:  Main Island Lift Station (construction) – a new lift station was needed to replace the aging, failing, lift station servicing all of Okaloosa Island. This project provides greater capacity and reliability to the Island sewer system.  Duke Field Force Main & Lift Station (construction) – provided sewer service to Duke Field via a master lift station “inside the fence” and approximately 7 miles of piping.  Rocky Bayou Force Main (construction) – replaced an aging 14” sewer force main transmitting all flow from the East County Service Area (Bluewater Bay) to the NVOC Regional Sewer Plant. Project is part of a phased plan to eliminate the Post Office Lift Station and Rocky Bayou Lift Stations.  Okaloosa Island Sanitary Sewer Rehab (construction) – installed a cured-in-place liner on terra cotta sewer to reduce the inflow and infiltration which is currently inundating the wastewater collection system.  Ft. Walton Beach 36” Force Main (design) – joint project with the City of Ft. Walton Beach to install a 36” ductile iron force main on Roberts Blvd. the Ft. Walton Beach Golf Course, and Denton Blvd. to replace 3 critical, aging force mains feeding the Arbennie Pritchett Water Reclamation Facility (WRF).  Meigs-Seminole Lift Station (design) – replace the aging and undersized Meigs-Seminole Lift Station, which pumps all the wastewater from Bluewater Bay to the Niceville-Valparaiso Regional Sewer Plant.  Developed a new Valve Exercise Program to improve efficiency.  Repaired all water main breaks.  Repaired all sewer main breaks.  Performed water taps.  Performed sewer taps. PROGRAM GOAL: To be on call and ready to perform any repair to any facet of the Okaloosa County Water & Sewer Systems’ service area at any time 24/7/365. To handle all projects undertaken in a professional manner with a minimal amount of service disruption to our customers. KEY OBJECTIVES: 1. Ensure budgetary, personnel, customer service and purchasing functions comply with County policies and procedures. 2. Preserve and protect infrastructure to provide quality of service to customers. 3. Maintain and extend the useful life and utility of County facilities. 4. Ensure the preservation and safe operation of all work related equipment. 5. To provide routine and preventative maintenance for the system. 6. To provide emergency response capabilities to prevent all but short term interruptions to service and prevent system losses or environmental damage. 7. To maintain and improve key components of the Water & Sewer infrastructure. The following projects are planned for FY2014:  Brooks Bridge Water Main Repair or Replacement (design & construction) – install a second water supply line to Okaloosa Island (or repair the broken bore, if at all possible), which would then serve as the primary water source to Okaloosa Island (and main on bridge would serve as backup).  Newcastle Area Water System Improvements (design & construction) – provide new, larger water mains to the area and fire hydrants to provide increased fire protection and ensure the reliability of the system. This project is funded by a Florida Department of Economic Opportunity Community Development Block Grant.  Ft. Walton Beach 36” Force Main (construction) – joint project with the City of Ft. Walton Beach to install a 36” ductile iron force main on Roberts Blvd., the Ft. Walton Beach Golf Course, and Denton Blvd. to replace 3 critical, aging force mains feeding the Arbennie Pritchett WRF. 17  Eglin Main Force Mains & Lift Stations (design & construction) – provide sewer service to Eglin Main Base via 2 lift stations “inside the fence” and approximately 7 miles of piping. This project will divert all wastewater flows from Eglin proper to the Arbennie Pritchett WRF.  Sanitary Sewer Rehab (construction) – install liners on terra cotta sewer pipes and aging manholes to reduce the inflow and infiltration which is currently inundating the wastewater collection system.  Poquito Bayou Water Main & Force Main Bores (design & construction) – replace the aging, deteriorated mains under Poquito Bayou with new directional bores.  Camp Rudder Force Main & Lift Station (design) – provide sewer service to Camp Rudder via 1 master lift station and approximately 8.6 miles of piping. This project will divert all wastewater flows from Camp Rudder to the Arbennie Pritchett WRF.  Diversion of the OCWS portion of Sewer flow to Niceville-Valparaiso Regional Sewer Board Plant (Design & Construction) – Construct a new force main and pump station to divert OCWS sewer flow from NVRSB to the Arbennie Pritchett WRF. This will consolidate flows and reduce overall wastewater treatment cost for the flows from our county east service area. The East County Repump Station is planned to be constructed in FY2014 and the East County Transmission Main (approx. 6.7 miles) is planned to be constructed in FY2015. Project will also eliminate Rocky Bayou Lift Station. PERFORMANCE MEASURES: Actual Estimated Adopted Performance Measures FY11/12 FY12/13 FY13/14 Miles of Sewer main / Maintenance Personnel

Download this text file with its original spacing ↓