Final Minutes
City of Fort Walton Beach
Workshop of the City Council of Fort Walton Beach
Tuesday, January 22, 2013 5: 00 PM 107 Miracle Strip Park...
Fan Walton Beach FL 32548
Call to Order
The meeting was called to order on January 22, 2013, at 5: 00 pm.
Attendee Name Title Status Arrived
1
Mike Anderson _
G_ Mayor _ Present 4: 5 8 PM
Bobby Griggs - Council Seat ] Present 4: 58 PM
Joyce gossom Council Seat 2 Present 4 58 PM
Trey Goodwin Council Seat 4 Present 4: 57 PM
Bobby Nabors Council Seat 5 Present 4: 58 PM
Bull Rigdon Council Seat 6 Present 4: 59 PM
Dick Rynearson Council Seat 7 Present 4: 59 PM
Pledge of Allegiance
The Mayor led in the Pledge of Allegiance.
Presentation of 60% Design Plans for the Fort Walton Beach Recreation Complex
The City Manager advised that the 35% design plans for the Fort Walton Beach Recreation
Complex were completed by Hatch Mott MacDonald and that on November 13, 2012, Council
authorized DC Architects to complete the final design package, which is now to 60%
completion.
Jeff Peters, Recreational /Cultural Services Director, advised that Staff has been meeting with the
principals involved in the project to ensure that everyone is on the same page with the vision of
the project. Mr. Peters informed that the public has been providing input on what they would
like the complex to have including increasing the size of the fitness room; incorporating a locker
room; a patio with chairs for the senior center portion of the complex; and the addition of a
restroom. Also being discussed is a closed circuit TV where parents can watch children taking
dance classes.
Mr. Peters advised the feedback has been positive and the biggest question being asked is when
it will be completed.
Dennis Chavez of DC Architects discussed the renderings and that the biggest change is the
design of the roof from a flat roof to a double -lock steel roof to prevent leaking.
Qty Coha, d of Fort Walton Bench Page 7 Printed // 2312013
Minutes 2013
Steve Christopher of Lord & Son Construction informed the process is moving smoothly and
noted that 3500 square feet is being added to the building in addition to the 2500 square foot
patio. Mr. Christopher advised the project is under budget and on schedule and there will be a
90% review meeting in February or March.
Discussion included the recycled water for irrigation that will be run through the water line from
Pump Station 1; the idea to overbuild to provide capacity for the future and the desire by Staff to
do it right the first time;' the use of brick, stucco, and metal roofing; and the security system will
include closed circuit television and lighting along the track for evening walks.
Mr. Peters discussed possible sponsorship and input and that the Chamber of Commerce is
assisting in that endeavor.
Charlene Greenwald, Jet Drive, stated her thought that the renderings of the exterior design of
the building looks institutional and has no character and lacks a dramatic entrance.
Mr. Peters stated that the landscaping proposed for the complex will be a plus and he is confident
the building will be attractive. Mr. Chavez reminded that the structure is a municipal building
and should have a municipal feel to it, and that when completed will be attractive and an asset to
the City.